Knowledge that Transforms
To make high-quality research more accessible and easier to explore.
Fields:
16 results
✕ Clear filters
Instructions to authors
An optimal inventory model where resupply is possible but uncertain
A model is formulated for computing the optimal stock quantity of an item when resupply is possible but uncertain. The distinguishing feature of the model is that the optimal stock quantity calculation takes into account the cost of resupply and the probability of stock arriving by a specified mode of transport in time for issue to customers. The model is then applied to the problem of determining a preferred mode of transport for an assumed set of parameters.
Priority rules for check processing in multiple branch banking: An experimental analysis
The check‐processing activity represents a major function in a commercial bank. If checks are quickly processed through the bank, then funds will be transferred to appropriate accounts and the bank will experience minimum float. This paper discusses the use of priority rules to maximize the dollar value of checks processed each day. A series of experiments are developed to test a set of priority rules (heuristics) under different operating conditions of check processing capacity, transit dollar levels, and branch characteristics. The results indicate that significant differences in performance are present for different rules. Also, the usefulness of some rules are dependent upon the commercial bank's operating characteristics, which has important implications for operating managers.
A requirements planning system for the Space Shuttle Operations schedule
The National Aeronautics and Space Administration (NASA) is charged with developing a Flight Operations Planning Schedule for Space Shuttle Operations in the 1980s. During this decade, NASA plans to launch up to thirty space shuttle flights per year when the program reaches the mature phase. Traditional planning techniques for space flights (PERT‐type models) are inadequate for this task because of their inability to resolve conflicts arising from multiple demands for limited resources generated by numerous simultaneous projects (space flights). This paper describes a requirements planning system developed by the authors and adopted by NASA for this resource constrained multiple project scheduling problem.
A generalized lot sizing model for the process cycling problem
Most scheduling/lot sizing models for the single‐machine problem assume that aggregate demand equals aggregate production; and that backorders are to be avoided. Where working inventories are low, the scheduler may wish to avoid short production runs and willingly incur some backorder penalties so as to increase the length of production runs and reduce setup costs per unit of time. The model proposed here identifies optimal lot sizes with respect to the backorder/setup cost relationships. Use of the model will result in an optimally balanced inventory even when aggregate inventory levels are changing.
A simulation study of smoothing constant limits for an adaptive forecasting system
A set of computer simulation experiments were designed to investigate the use of Winters' forecasting models with the adaptive system of Trigg and Leach for short term forecasting. These two methods are popular and effective methods used for short term forecasting, but no systematic study of their joint usage has been reported. The results provide a set of smoothing constant limits which yielded accurate forecasts for the experimental conditions investigated. The experimental conditions were designed to cover as wide a range of situations as possible to maximize potential usefulness to practitioners.
A comparison of MRP lot sizing methods considering capacity change costs
Capacity management is the planning and leveling of resources required (load) against the resources available (capacity). In this study, the lot size models used by Material Requirements Planning (MRP) had a major effect on the work center load profiles generated by Capacity Requirements Planning (CRP). Therefore, the selection of lot size models for MRP systems is an important decision for capacity management as well as materials management. The results of this study highlight the operating characteristics of specific lot size models considering setup, inventory carrying, and capacity associated costs. For example, the Economic Order Quantity model and the Lot‐For‐Lot model in certain situations can help level load. The Periodic Order Quantity and Least Total Cost models especially for high cost structure ratios tend to result in erratic and lumpy work center load profiles. The reasons for such operating behavior are examined. Other concepts and relationships important to capacity management are discussed.
Improving fuel utilization in steel mill operations using linear programming
This paper describes the use of linear programming to improve the fuel utilisation at a major Midwestern steel mill. In particular, linear programming is used to determine an efficient fuel allocation plan for this steel mill, which reduces the total fuel costs for the steel mill operations. The efficient fuel allocation plan that is developed utilises two externally purchased fuels: natural gas and fuel oil, and two gases: blast furnace gas and coke plant gas, which are internally generated as natural by‐products of the production process. Test results from the application of the linear programming model are presented and discussed, and indicate that considerable cost savings can be achieved by utilizing a fuel allocation plan which more effectively utilizes the by‐product gases which are produced within the steel making process.
An expectancy‐equity model of productive system performance
Although numerous behavioral variables (e.g., personality traits, incentives, nature of supervision) have documented relationships with quantity and quality of output, i.e., performance, in production systems, existing production and operations management models are dominated by technological variables. The article addresses three questions: 1. Which technological and behavioral variables influence productive system performance? 2. How do behavioral and technological variables interact? 3. Which variables are most important under different circumstances in determining performance? An expectancy‐equity model, patterned on research by Lawler [22], presents proposed relationships among variables in production systems, which are classified along a continuum from high to low process predictability. Predominant determinants of performance in various types of systems (e.g., continuous process, job shop, R&D project) are considered in light of the model. Implications for designers and analysts of productive systems and for future research are discussed.