A natural starting strategy for Aronson's heuristic 1 for solving the deterministic, single operator, multiple machine, multiple run cyclic scheduling

Journal of Operations Management 1987
The semiautomatic nature of machinery often makes it economical to assign more than one machine to a single operator in a cyclic schedule. If the tasks, executed in a cyclic schedule, are not ordered properly, excessive interference can occur, even in deterministic problems. In a recent article [1], Aronson presented two efficient and effective heuristics for solving a more realistic generalization of the deterministic cyclic scheduling problem—one that has a single operator, multiple nonidentical machines, and multiple nonidentical runs on each machine. Here, the author supplies a natural strategy for initializing the first heuristic, because it is not satisfactory to run the heuristic many times, each time starting with a first run of a different machine, to obtain a reasonable solution. This modification is necessary to improve the performance of the heuristic, for ease of implementation, and savings of computational effort. An example problem is presented to compare the solution found using the heuristic with the new starting strategy to that of the heuristic using the original, random selection strategy. The solution found is optimal, whereas the original version of the heuristic obtained a solution within 8.1% of optimality. The new, natural starting strategy for the heuristic should improve its ability to solve problems with a single execution, and simplify its implementation on mainframes, minicomputers, and microcomputers. Increased use of the techniques outlined here should lead to a higher utilization of labor and machinery on the production floor.

A dispute on James R. Evans' “an efficient implementation of the Wagner Whitin algorithm for dynamic lot‐sizing,” journal of operations management, vol. 5, no. 2, February 1985

Journal of Operations Management 1987
This note disputes several observations made by James R. Evans' article, “An Efficient Implementation of the Wagner‐Whitin (WW) Algorithm for Dynamic Lot‐Sizing,” Journal of Operations Management , Vol. 5, No. 2, February 1985. By testing the algorithm within a micro‐based manufacturing resource planning (MRP) system, the writer of this note shows that WW is still computationally burdensome compared to heuristic methods, particularly within the context of a micro‐based MRP system implementation.

A simple and robust model for computing the service level impact of lot sizes in continuous and lumpy demand contexts

Journal of Operations Management 1987
Lot sizes that cover material requirements for more than two periods' demand have a built‐in service level impact. The lot sizes act as a buffer for variations in demand for every period (week) but the last. However, procedures for including the service level effect of the lot size in the lot‐sizing decision have not been developed. This article develops a very simple but robust mathematical model for computing the service level guaranteed by any lot size, Q, in both continuous and lumpy demand contexts. The model turns out to be a very simple mathematical expression involving the lot size, Q, the number of periods of demand covered by the lot size, n, and the standard deviation of the demand, σ. Some purely mathematical evaluations of the model were undertaken, and were found to predict both the direction of change of the service level as a function of Q and σ and the limit of the service level very well. A simulation experiment was also designed to test how well the model predicted the service level generated by the lot size, Q. The value of Q was set at the beginning of each experiment; the parameters of demand distribution were denned a priori. The simulations involved setting the lot size, Q, randomly generating individual demands from the known distribution, and recording the impact on the inventory and service levels. The results show that the model's prediction of the service level generated by any given lot size, Q, was very precise and reliable. The performance of the model was excellent even for cases where demand variability, as measured by the standard deviation, was high. Moreover, the built‐in service level of lot sizes turned out to be high, ranging from 95% to 100%. The ability to do a reasonably precise, a priori computation of the service level generated by a lot size, Q, has fundamental ramifications for production and materials management. One of these ramifications is the ability to size safety stocks to increase the service level from that generated by the lot size to the target sought by management. The article demonstrates that the safety stock will be smaller if the built‐in service level of the lot size is factored in. The conclusion is that lot‐sizing decisions cannot be divorced from safety stock computations, as has been done traditionally in theory and practice. Moreover, the choice of a lot‐sizing approach must consider the service level objectives of the company.

Alternative master production scheduling techniques in an assemble‐to‐order environment

Journal of Operations Management 1987
The manufacturer's ability to respond quickly and with great flexibility is crucial. The future belongs to the manufacturer of high tech, high‐value products who can compress not only component and assembly process times, but design and tooling cycles as well. Master production scheduling provides a road map for production requirements. This article reports the results of a simulation study that compares alternative procedures for determining master production scheduling (MPS) techniques utilizing the superbill and covering set MPS. The performance criterion for the study is the available‐to‐promise (ATP) lead time (customer service). The results of the simulation experiment support the superiority of the superbill technique over the covering set technique in terms of customer service. The penalty associated with using the more efficient covering set technique as an alternative to the well known superbill technique is a significant decline in customer service. However, covering sets have computational advantages that must be considered, especially when the MPS procedures have to be repeated routinely. Finally areas for future research are suggested. It is especially important that a trade‐off between the customer service and manufacturing flexibility be investigated.

Towards a theory of manufacturing overhead cost behavior: A conceptual and empirical analysis

Journal of Operations Management 1987
Manufacturing overhead cost (MOHC) in an average U.S. manufacturing firm is about two and one half times the direct labor cost, yet it has not received much attention from researchers; it is practically a neglected area of research. In the competitive scenario of the 1980s, the need for understanding and controlling any and all costs including MOHCs is greater than ever before. In an attempt to understand and explain MOHC behavior, this study proposes a conceptual model of MOHCs and validates the model with field data collected as part of the 1983 North American Futures Survey of the Manufacturing Roundtable, School of Management, Boston University, Boston. The model visualizes MOHC to be a function of a hierarchy of variables. In the proposed hierarchy, industry type is the most important determinant of MOHC followed by order‐filling method (i.e., make‐to‐stock, make‐to‐order and assemble‐to‐order), strategy variables, and operational variables, in that order. The higher the level of the variable, the greater its impact on MOHCs. To validate the model, four propositions concerning MOHCs derived from the model were subjected to statistical tests using the data collected from hundreds of manufacturers who participated in the 1983 North American Futures Survey. In the process of conducting the survey, a questionnaire was sent to senior manufacturing executives from 1100 large manufacturing firms in the U.S., Canada, and Mexico including all firms in the Fortune 500 listing of industrial firms. A total of 209 responses was usable. The average 1982 sales of the responding business units was $751 million. As hypothesized in the model the findings showed that the higher level industry type variable so profoundly influenced MOHCs that it overshadowed the influence of all lower level variables. Among the five industry groups studied (namely, basic, consumer products, industrial, machinery, and electronics), there was a tendency among the industries to form low or high MOHC clusters. Basic and consumer industry groups were part of a low‐cost cluster and the rest were part of a high‐cost cluster. The MOHC in industries in the high‐cost cluster was nearly 50% more than the MOHC in the industries forming the low‐cost cluster. An important finding of this study was that several strategy‐related variables were associated with MOHCs. For example, firms showing a high rate of sales growth and those emphasizing a strategy of dependable delivery to customers were associated with relatively high MOHCs. This study also showed that whereas the MOHC in the electronics industry was most sensitive to strategic decisions, the MOHC in the machinery industry was least sensitive to strategic decisions. Given the state of our understanding, it is unclear why some industries are more sensitive to strategic decisions than others. In the interest of MOHC control, practitioners in all industries should watch for the effect of strategic decisions, if any, on MOHCs and look for ways to control the adverse effects of strategic decisions on MOHCs. More studies are needed to identify the factors that make certain industries relatively more sensitive to selected strategic decisions.

The sources, measurements, and managerial implications of process commonality

Journal of Operations Management 1987
This article explores the issue of commonality of processes. While the benefits of high process commonality (similarity of processes) are generally recognized, this research represents the first clear identification of the sources, development of measurements, and discussion of the managerial implications of process commonality. The first section of the article identifies and categorizes the sources of process commonality. These categories are: low set‐up times, flexibility to change from one operation to another, and flexibility in making expedite decisions‐ Indices are developed in the second section for each of these three categories at the work center level. These indices are examined using sensitivity analysis and are found to respond appropriately to changes in parameters. Formulation of a composite index is also discussed. The final section discusses the managerial implications of process commonality at the strategic, tactical, and operational levels. The impact of improved process commonality covers a wide range of decisions, including product/process selection, production/inventory control system selection, and definition of group technology cells, among others.

The use of cost‐based priorities in random and flow shops

Journal of Operations Management 1987
This article evaluates the use of cost information for establishing priorities in a job shop. Most traditional research in the area of job shop scheduling uses only time‐oriented rules and performance criteria when in reality, minimizing total cost is the most appropriate objective. Utilizing a simulation model of randomly‐routed and flow job shops, several priority rules are evaluated on the basis of time performance, primarily on‐time completions, as well as on the basis of cost performance: the minimization of work‐in‐process (WIP) investment. The priority rules use either time information only, cost or value information only, or both types of information in a composite manner. An additional concept examined is that of the speed of a job relative to its due date. Speed is examined for different profitability classes of jobs: high, medium, and low. It is often important that high profit jobs are completed on time, while low profit jobs may not be as critical. The priority rules are simulated at four utilization levels and several replications are made to make statements about the statistical significance of the results. The results show that a time rule, such as critical ratio, performs poorly on cost measures, moves high and low profit jobs indiscriminately, and completes significantly fewer jobs on time at high utilization levels than the cost rules examined. One of the cost rules that utilizes the value added to a job is the best performer in terms of cost and does quite well in completing jobs on time.

Decision support systems (DSS) design for operations managers: an empirical study of the impact of report design and decision style on effective choice

Journal of Operations Management 1987
In making decisions, production managers usually rely on information contained in reports generated by an information system. Unfortunately, a production manager is likely to receive a report that best supports his/her decision‐making style only by chance. This investigation studies the individual differences in decision‐making style for production managers making production scheduling decisions, and the decision support design that best supports their decisions. Ninety‐six subjects classified by decision‐making style (Myers‐Briggs Classification) acted as production managers in a simulated production environment. Sequential production scheduling decisions were made based on reports generated by a computerized production simulator. The simulator was an interactive program that simulates a production task in a single‐product organization. Based upon the information contained in the reports, managers developed production schedules for the firm's next production run and input their decisions into the simulator, which then generated the reports for that run. The managers' objective was to minimize the firm's total cost. Decision‐making style and the type of report were examined as independent variables in the study. The dependent variables were decision time, decision confidence, and total cost of production. Thus, a manager's performance was measured by decision time, confidence, and the manager's total cost. Each manager was classified by decision‐making style and received as output one of four report designs, i.e., tabular‐raw data, tabular‐summarized data, graphical‐raw data, or graphical‐summarized data. The results of the experiment suggest that for production decision support systems there are report designs better suited to certain decision‐making styles than others for scheduling decisions. However, the results indicate that managers with certain decision‐making styles can make effective scheduling decisions with more than one type of report design. The implications of the results are illustrated by means of example MRP reports.

Operations management taxonomy

Journal of Operations Management 1987
Operations management is responsible for achieving an effective and efficient transformation process. Changes taking place in the marketplace and in technology require the correct positioning of operations in the production of goods and services. The service sector within our economy has grown tremendously, representing an ever greater share of our gross national product. A general operations management (OM) paradigm, combining both goods and services, will help researchers as well as practitioners. The operations classification schemes proposed previously have been narrower in scope and incorporated primarily manufacturing systems. The transformation process is universal; major constraints and standard approaches need to be identified regardless of whether it is a good or service produced. This article presents and defines a descriptive OM model. Sample industries and companies are positioned in the market and product/service matrix; in addition, operations activities and their long‐, medium‐, and short‐term solution approaches to operations problems are identified. This operations model keys on the definition of the product/service produced. The major groupings of the first two dimensions of the model depend on (1) market requirements, and (2) whether the product/service is discrete or divisible, fixed site or transportable. Major groupings of the operations activities, required to effectively and efficiently transform the product/service, define the management approach and product/process technology used. These represent the third dimension to our model. The fourth dimension is the time available to plan and implement solutions to operations problems. The four dimensional space‐time paradigm is cohesive and inclusive, and better identifies the major constraints on goods and/or services production. It is intended to analyze and synthesize both the similarities and differences among industries and companies positioned in matrix categories, and thus to help determine the appropriate actions of operations managers during the transformation process. The complexity of the OM paradigm shows realistically the trade‐offs that have to be made in this dynamic area. Changing markets, technology, management, and economics all play a part in positioning operations. Resulting changes in the market requirement and product/service positioning matrix can change unit costs. Movement in any direction on the matrix should not be thought of as a natural evolution but should be meticulously planned. Goods and services producers grouped in each of nine major transformation categories may be able to use similar planning, implementation, and control approaches.

Choosing optimal buffering strategies for dealing with uncertainty in MRP

Journal of Operations Management 1987
Dealing with uncertainty in the material requirements plan (MRP) is important, because of its importance in meeting the requirements of the master production schedule (MPS). In MRP, there is a critical need to make the MPS predictable and consistent. In the early days of MRP, a philosophy of zero safety stock or safety time was rigorously advocated. It was thought to be more advantageous to eliminate the need for buffering by freezing the MPS and managing lead times to make these firm. However, it was soon recognized that it is extremely difficult, in practice, to eliminate all uncertainty that affects the MPS and its execution. Practitioners know that some level of buffering is necessary (or inevitable) given the vicissitudes of the market place, production system planning and control, and supplier performance. This article accepts these premises and proposes a model and procedures for dealing with the buffering problem and choosing optimal buffering strategies in MRP.