A strategic framework for technical function management in manufacturing

Journal of Operations Management 1996
Driven by the enhanced technological sophistication of products and production processes, the requirement to improve manufacturing plant return on investment and the need to better manage scarce technical resources, more firms are focusing on the activities of their technical functions. As many firms achieve or approach “best practice” in their organisational arrangements and management of human resources, there is an increasing recognition of the opportunities to enhance competitiveness through improved management of technology and technical functions. There is also substantial evidence to suggest that the development of new technology is occurring much faster than is the development of new approaches with which to manage it. This paper develops a framework, “technical effort”, through which to view technical activity in the context of improved business and organisational performance. This framework differs from traditional practice by integrating three different perspectives: maximising the contribution of technical functions to business outcomes, developing a sustainable source of competitive advantage in the form of an order winning set of technical capabilities and creating the working environment through which these requirements may be energised. It serves as a useful tool for Operations Managers to improve the strategic value of their technical functions by focusing learning on the linkages between business competitiveness, technical function outcomes, technical capabilities and organisational best practices.

An iterative local constraints based analysis for solving the resource constrained project scheduling problem

Journal of Operations Management 1996
In this paper, a new heuristic iterative scheduling approach is proposed for the resource constrained project scheduling problem. Well‐known dispatching rules and a decision‐making process called Local Constraint Based Analysis (LCBA), previously tested in a single pass forward parallel scheduling algorithm, are imbedded in the iterative scheduling algorithm. LCBA evaluates and selects the activities competing for scarce resources by considering the currently active temporal and resource constraints imposed by the network/resource characteristics. The iterative scheduling algorithm proposed here makes consecutive forward/backward scheduling passes which improve the project duration obtained by the single forward scheduling pass. Extensive experimentation has been done on a set of 188 benchmark problems from the literature. The results demonstrate that all the methods imbedded in the iterative algorithm improved the project duration significantly. It is observed that LCBA's average project duration deviation from the optimal duration is of the magnitude of 1% using the iterative scheduling algorithm. Among all the methods which have been tested, LCBA and a list rule, Weighted Resource Utilization and Precedence (WRUP), are the ones which have benefited most from the iterative algorithm. It is also observed that for various cash flow schemes the project Net Present Value (NPV) is improved through the use of the iterative scheduling algorithm.

A study of approximating the moments of the job completion time in PERT networks

Journal of Operations Management 1996
The importance of proper management of projects has not gone unrecognized in industry and academia. Consequently, tools like the Critical Path Method (CPM) and the Program Evaluation Review Technique (PERT) for project planning have been the focus of attention of both practitioners and researchers. Determination of the Time to Complete the Job (TCJ) in PERT networks is important for planning and bidding purposes. The complexity involved in accurately determining the TCJ has led to the development of many approximating procedures. Most of them ignore the dependence between paths in the network. We propose an approximation to determine the TCJ which explicitly recognizes this dependency. Dependency in networks arises due to commonality of activities among various paths in the network. We develop an approximation which is simple to use and makes use of readily available tables. Also, the approximation employs the traditional concept of the critical path which is easy to understand and to operationalize. The activities on the critical paths are divided into an independent portion and a dependent portion. The dependent portion comprises activities common to various critical paths. Order statistics are used in computing the time for the dependent portion of the critical path. We present the theoretical underpinnings of our approach and illustrate its application via an example. In the absence of other measures, we use simulation results as a proxy for the TCJ and as a benchmark to measure the accuracy of our approximation. Empirical results are obtained for a variety of networks in the literature. We show that the distribution of the TCJ is better approximated by a mixture of distributions. Comparison with other approaches from the literature indicates that our approximation yields estimates for the TCJ which are closer to the simulation results.

The resource constrained time/cost tradeoff project scheduling problem with discounted cash flows

Journal of Operations Management 1996
Many of the recent studies on Project Scheduling focus on maximizing the Net Present Value (NPV) of cash flows that occur during the implementation of a project in the presence of precedence and resource constraints. The literature contains several integer programming formulations, heuristic procedures and their implementations. In most of these formulations, activity durations are assumed to be fixed. In this paper, we study a practical extension of the problem where the activity durations can be reduced from their normal durations by allocating more resources. Costs associated with such reductions are referred to as crashing costs. The problem under consideration involves determining the timing and duration of activities such that the NPV of all cash flows is maximized in the presence of precedence and resource constraints. We suggest a heuristic procedure for obtaining “good” feasible solutions. We compare the performance of three priority rules embedded in the proposed procedure. Two of these priority rules have been shown to be the most effective in the literature, the third is a new rule developed in this paper. Extensive computational experiments with the heuristic procedure on a total of 380 test problems are reported. The heuristic solutions are compared to benchmark solutions obtained from the best of 50‐randomly generated solutions for each test problem. In addition, upper bounds on the optimal values are obtained by performing Subgradient optimization on a Lagrangian Relaxation of the problem. These upper bounds are used to assess the quality of the heuristic solutions. In general, none of the priority rules produced consistently better results for all the test problems. However, all three priority rules provide “good” quality solutions with modest computational effort. The Lagrangian approach is found to provide tight bounds on the optimal values.

A clarification on conceptual and methodological issues related to the Job Characteristics Model

Journal of Operations Management 1996
We provide a comment on ‘Comparing the effects of cellular and functional manufacturing on employees' perceptions and attitudes’ by Shafer, Tepper, Meredith, and Marsh (Journal of Operations Management, 1995, 12, 63–74). We identify and explicate three conceptual concerns related to their description of the Job Characteristics Model, as well as two methodological concerns with using the Job Diagnostic Survey to measure the five job characteristics and the Motivating Potential Score as an aggregate index of a job's ‘motivating potential’. We intend this explication to serve as a clarification and guidance for further conceptual and empirical research in operations management involving the Job Characteristics Model, the Job Diagnostic Survey, and the Motivating Potential Score. Our remarks are intended to be constructive and are offered in the spirit of scholarly advancement.

The operating impact of parts commonality

Journal of Operations Management 1996
This paper investigates the impact of between‐ and within‐product parts commonality on the workload of a manufacturing firm using an MRP system. More specifically, we investigate the impact of several operational factors and their interactions with part commonality. We develop and validate a large simulation of an MRP system and integrate the generation of planned order releases with workload estimation on the shop floor. The results indicate that increasing parts commonality has positive effects in terms of average shop load but does lead to greater variability in terms of loadings as well as increasing system disruption. Further, we also find that the number of work centers significantly impacts the shop floor effects of commonality. Hence, although an increase in parts commonality results in less design effort and increased standardization, the negative effects of increasing commonality often appear on the shop floor level. This points to a need for the effective management of parts commonality by assessing the tradeoff between strategic “benefits” and operational “costs”.

Heuristic scheduling of capital constrained projects

Journal of Operations Management 1996
The movement to product and process development projects that involve joint ventures among strategic partners, as well as the increasing prevalence of projects within organizations has led to increased implementation of project scheduling methods. It is frequently the case that a capital constraint is placed on a project, thus limiting the number and value of activities that can be scheduled to occur simultaneously. However, the quantity of capital available to schedule activities can increase as additional cash is received as progress payments for completed activities. Since the project manager'so objective is to maximize project Net Present Value (NPV), it is important for the manager to develop a schedule that balances the early receipt of progress payments (which improve NPV and increase the capital balance available), with the delay of particularly large expenditures. Due to the intractability of optimal methods, the use of heuristic methods is required to solve problems of practical size. This paper presents the first test of heuristic methods for solving this problem. We use information from a relaxed optimization‐guided model that employs information from the unconstrained NPV‐optimal problem in heuristic procedure for solving the capital constrained problem. An experimental design is employed to test the heuristics that includes multiple factor levels for a number of project characteristics, including capital utilization, frequency of progress payments, and project network structure. The results indicate very good relative performance for the optimization‐guided procedures as compared to two benchmark heuristics.