Knowledge that Transforms
To make high-quality research more accessible and easier to explore.
Fields:
25 results
✕ Clear filters
Instructions to authors
The changing of the guard
Manual versus automated check encoding in commercial banks
Despite moves toward electronic funds transfer systems, the financial community must continue to cope with the labor‐intensive paper processing requirements associated with a payments mechanism still heavily reliant upon checks. An attempt to eliminate the labor intensity is the recent development of optical scanning capture equipment which “reads” printed or handwritten documents. Mathematical programming models are used to compare the manual and the automated processing systems on a cost basis and to identify the kind of environment suitable for automation.
A note on stopping rules for rolling production scheduling
Instead of solving fixed horizon production scheduling problems with specified terminal inventory conditions, we use forecasting to extend the problem horizon until stopping rule conditions are met. Major questions for this procedure relate to how to provide data for the extended problem and when to stop the process. We provide extensive computational results indicating that relatively simple methods perform quite well.
Full fixed cost recovery lot sizing with quantity discounts
Purchasers must often make lot sizing decisions when facing price schedules of price‐quantity discounts. It is important to determine the supplier's pricing philosophy when establishing a solution procedure. One approach is to evaluate total costs at all of the appropriate break points. This offers limited information: a lot size and a set of total costs. This is especially true in the case of full fixed cost recovery pricing. In actual practice price schedules can be extremely lengthy: indeed, it may be in the supplier's best interests to offer comprehensive discount schedules. This situation complicates the purchaser's decision making process. An efficient alternative, which solves the price‐quantity discount problem when the supplier insists on a full fixed cost recovery schedule, is presented. Computations are reduced to a few simple steps; the result is a least total cost lot size for a simple linear package price model given parameters obtained by an appropriate analysis of the supplier's price‐quantity discount schedule. A starting point is determined and the choice of the lot size is made using a simple criterion. Rapid convergence is assured, given a reasonably well‐behaved schedule.
An empirical investigation of different strategies for material requirements planning
Master production scheduling, component lot sizing, and capacity requirements planning represent three important modules of material requirements planning (MRP) systems. Coordinating these three modules has been largely dependent on managerial judgment and experience. In this research, five different strategies for integrating these modules are empirically investigated. These strategies differ mainly in the extent to which the modules are coordinated. The impact of the shop, product, component and cost characteristics is measured by varying ten experimental factors. The research findings so obtained provide several guidelines on the effectiveness of each strategy in different environmental settings.
Queue control using a historically developed stochastic model
This paper applies a stochastic model to determine the optimal or ideal average planned queue level. The ideal average planned queue level is defined to be the minimum average queue level necessary to ensure that in the long run the probability of work center idle time over a specified planning horizon is no greater than some value α chosen by management. Also discussed is the usefulness of the ideal planned queue level, not only for controlling work‐in‐process inventories, but also for obtaining better work center lead time estimates.
A cost evaluation method for dynamic line balancing
A procedure is presented for calculating stochastic costs, which include operator (labor) and inventory costs, associated with dynamic line balancing. Dynamic line balancing, unlike the traditional methods of assembly and production line balancing, assigns operators to one or more operations, where each operation has a predetermined processing time and is defined as a group of identical parallel stations. Operator costs and inventory costs are stochastic because they are functions of the assignment process employed in balancing the line, which may vary throughout the balancing period, and the required flow rate. Earlier studies focused on the calculation of the required number of stations and demonstrated why the initial and final inventories at the different operations are balanced. The cost minimization method developed in the article can be used to evaluate and compare the assignment of operators to stations for various assignment heuristics. Operator costs and inventory costs are the components of the cost function. The operator costs are based on the operations to which operators are assigned and are calculated for the entire work week regardless of whether an operator is given only a partial assignment which results in idle time. It is assumed that there is no variation in station speeds, no learning curve effect for operators' performance times, and no limit on the number of operators available for assignment. The costs associated with work‐in‐process inventories are computed on a “value added” basis. There is no charge for finished goods inventory after the last operation or raw material before the first operation. The conditions which must be examined before using the cost evaluation method are yield, input requirements, operator requirements, scheduling requirements and output requirements. Yield reflects the output of good units at any operation. The input requirement accounts for units discarded or in need of reworking. The operator requirements define the calculation of operator‐hours per hour, set the minimum number of operators at an operation, and require that the work is completed. The scheduling requirements ensure that operators are either working or idle at all times, and that no operator is assigned to more than one operation at any time. The calculation of the output reflects the yield, station speed, and work assignments at the last operation on the line. An application of the cost evaluation method is discussed in the final section of the article. Using a simple heuristic to assign operators, the conditions for yield, inputs, operators, scheduling, and output are satisfied. The costs are then calculated for operators and inventories. In conclusion, the cost evaluation method for dynamic balancing enables a manager to compare the costs of assigning operators to work stations. Using this method to calculate the operator and inventory costs, a number of different heuristics for assigning operators in dynamic balancing can be evaluated and compared for various configurations of the production line. The least cost solution procedure then can be applied to a real manufacturing situation with similar characteristics.
An availability model for the evaluation of equipment alternatives
An availability based model for the evaluation of alternatives in equipment replacement analysis is presented. The expected annual cost of an equipment alternative is developed as a function of availability. The least cost alternative for the desired availability is identified from cost vs. availability curves of the alternatives. A simulation approach is used to determine the availability of existing equipment. The methodology is applied to the evaluation of alternate equipment for the analysis of serum samples in a hospital laboratory.