Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
1381 results ✕ Clear filters

Maintenance management: Keeping up with production's changing trends and technologies

Journal of Operations Management 1985
Current trends in manufacturing have led to reduced levels of work‐in‐process inventory and increased levels of automation and machine complexity. These changes have two important implications for maintenance management. First, machine breakdowns not only cause a loss of output from the down machine, but also result in lost production on downstream machines. This occurs because of the elimination of buffer stock between workstations. Second, the gap between the technological expertise of the operators and the technological sophistication of their machines has widened. This gap decreases the ability of operators to make adjustments and minor repairs to their own machines. These two factors cause an increase in maintenance costs associated with machine downtime and maintenance labor. Historically, the proportion of preventive and corrective maintenance has attempted to balance these costs. As buffer stock is reduced and more machines are coupled, the costs of downtime will increase, increasing the need for preventive maintenance and decreasing its cost compared to the cost of lost production. Increases in the use of computer‐based planning systems have resulted in the development of computerized preventive maintenance systems that have proven to be successful in planning for maintenance labor and materials. Integrating planning methods with corrective maintenance tasks will help reduce breakdowns, make more efficient use of maintenance craft labor, and provide information for inventory control of maintenance, repair, and operating (MRO) materials. This article examines methods of reducing machine downtime costs, maintenance labor costs, and MRO inventory costs in today's changing production environment. Techniques for reducing these costs are explored in the areas of maintenance planning, maintenance methods improvement, and MRO inventory control.

Explaining productivity differences in North Carolina factories

Journal of Operations Management 1985
Using detailed survey data collected from 95 large factories in North Carolina, this article examines the reasons why some factories are more productive than others. Six distinct measures of productivity are used as independent variables in the regression analyses reported. The results suggest five major themes that are shared by the most productive plants: simpler flow of materials through the process, valuing people, attending to quality, investing in hardware, and accounting for the industry's productivity growth. Several factors such as size and unionization are of no apparent importance to an explanation of cross‐factory productivity differences.

Achieving factory automation through Group Technology principles

Journal of Operations Management 1985
This article illustrates the use of Group Technology (GT) principles for integrating the various elements of Computer Integrated Manufacturing (CIM). Several observations are made regarding the current state of batch manufacturing in the U.S. in light of these principles. Following a brief historical background, the various elements of GT are described as they occur in the manufacturing cycle. Since the main prerequisite to GT is part family identification, the various classification and coding systems for identifying part families, and also non‐codification systems, are briefly described. The benefits of design rationalization and variety reduction are then explained in the context of CAD, CAM, and CAPP. Next, cellular manufacturing, currently the major problem area in the U.S. regarding GT, is discussed. The discussion includes new production technologies and concepts such as economies of scope. Materials management and operation scheduling are discussed next, highlighting the GT/MRP interface. The effect of GT and other new technologies on quality is then addressed and the significant impacts here are noted. Next, the effects on related areas such as personnel and accounting are described, including worker satisfaction, incentive schemes, and cost tracking. Last, an assessment of the current status of batch manufacturing is undertaken. Academic approaches, as well as industry crusades such as just‐in‐time (JIT) production, are reviewed and the current problems in adopting cellular layouts are addressed.

Personnel scheduling with flexshift models

Journal of Operations Management 1985
The concept of personnel scheduling when alternative work hours are permitted is presented in this article. The concept, called Flexshifts, schedules 6‐, 8‐, and 10‐hour shifts against a 12‐ and 24‐hour daily demand profile. Using the concept, required shifts can then be offered to the labor staff allowing each individual to select those shifts that best fit their personal plans. Alternatively, certain shifts can be guaranteed to key employees. Case studies reported in this paper indicate many advantages to allowing workers to opt for different start times, to select their days off and to create non‐standard workweeks from predefined sets of 6‐, 8‐, and 10‐hour days. Computerized timekeeping systems make this flexibility manageable. Personnel scheduling algorithms such as the one presented here make the planning of Flexshift easy. The formulation presented here utilizes linear programming. Tests of the L.P. Flexshift model on 42 data sets of 12‐hour days showed an average savings in labor of 24.2% when compared to an L. P. model of the traditional 8‐hour work shift. For a 24‐hour work pattern, that formulation outperformed a published heuristic for 8‐hour shifts by reducing average idle time from 13.9 to 5.4%.

The interchangeability of safety stocks and safety lead time

Journal of Operations Management 1985
Due to the uncertainty in estimating both the demand for end products and the supply of components from lower levels, buffering techniques should be included before the loading of a material requirement planning (MRP) system. Safety stocks and safety lead time are two techniques of providing buffering for loading. There have been many studies made concerning the determination of the amount of safety stocks and safety lead time. Some guidelines for choosing between safety stocks and safety lead time for dealing with uncertainty in both demand and supply also have been established. Although these two different methods have been used successfully, it has not been documented that using these two methods in a given situation will yield essentially the same results; that is, the interchangeability of these two buffering techniques has not been explored quantitatively. Since the net influence of safety stocks and safety lead time and their quantitative interchangeability are of major interest, an analytical model is proposed for this study. The lead‐time offset procedure for components loading are represented by a matrix model that is based on a lot‐for‐lot lot‐sizing technique. This lead‐time offset matrix model is the product of the precedence matrix and the fixed‐duration matrix. The precedence matrix is formed according to the total requirement factor matrix and the duration matrix is formed by each component process time. Thus, the lead‐time offset matrix will generate the starting period of each component. When the lead‐time offset procedure is modeled, the net influence of buffering quantity can be analyzed. The planned safety stock that is normally used to accommodate unexpected demand, shortage in supply, and defects from the operation at each process can be combined with demand to form the master production schedule. The revised lead time due to the integration of the safety stocks can be calculated through the lead‐time offset model. The safety lead time may extend the component process time as well as overall production lead time if the designated safety lead time is longer than the available slack time in a fixed lead‐time loading system. When the proposed lead‐time offset model is further examined, it is found that planned safety stocks at the higher level can buffer the fluctuations of lower level components quantity as well as the fluctuations of same level components quantity. Safety stocks can also buffer shortages that are caused by the delay of raw material and manufacturing processes. Thus, safety stocks can be used to buffer unexpected delay time up to certain limits. A planned safety lead time at higher level component process can buffer the fluctuations of lower level components process time, as well as the same level component process time. The safety lead time can be used to produce additional products to meet unexpected excessive demand up to certain limits under the following conditions: 1. The excessive demand is known before the actual processing of the components in the lowest level. 2. The raw material at the lowest level is available. Although safety stocks and safety lead time are interchangeable in terms of the ability to buffer variations in quantity, the conditions for safety lead time are seldom met in actual practices. Thus, the slack time in a fixed lead‐time loading system cannot be considered as an effective measure to substitute safety stocks. However, all or part of the delay in manufacturing processes or the supply from the lower level components can be buffered by the safety stock and the MPS will still be met. From this study, it is obvious that the slack time can be reduced when safety stocks are planned for an MRP system. The reduction of fixed lead‐time duration will be beneficial to the overall planning and scheduling in MRP systems.

An evaluation of overtime policies for a repair shop

Journal of Operations Management 1985
This article presents the first attempt to develop and examine overtime policies for a repair shop environment. Overtime is used to augment repair capacity as needed to offset short‐term demand fluctuations. If overtime provides sufficient additional repair capacity, it may be possible to reduce investment in spare parts inventory. The use of overtime in a repair shop requires managerial attention to several issues. In this article, the following five issues are examined: The relationship between overtime policies and spares stocking levels The timing of overtime—reactive or proactive The amount of overtime to use The level in the product structure at which overtime is most beneficial The priority scheduling and labor assignment policies used Six overtime policies are developed that explore the above issues. These are examined using a simulation model of a hypothetical repair shop. Since the focus of the article is on overtime policies, a single labor assignment policy is used in conjunction with two priority scheduling rules. The results indicate that reactive overtime policies work well in this environment and overtime is most effective at the lowest level of the product structure, where repair times are relatively shorter. In addition, lowest level parts provide more usage flexibility to handle anticipated future failures.

Short interval forecasting of emergency phone call (911) work loads

Journal of Operations Management 1985
There has been an increasing emphasis over the last 5 to 10 years to improve productivity in the Service Sector of the U.S. economy. Much of the improvement obtained by these managers has come about through better scheduling of the work force in these organizations. Effective scheduling of this personnel requires good estimates of demand, which may exhibit substantial variations between days for certain times of the year. The Indianapolis Police Department (IPD) Communications area is one such organization that exhibits varying workloads and is interested in improving staff scheduling of dispatch operators. This article explores the use of six different forecasting techniques for predicting daily emergency call workloads for the IPD's communications area. Historical call volume data are used to estimate the model parameters. A hold‐out sample of five months compares forecasts and actual daily call levels. The forecast system utilizes a rolling horizon approach, where daily forecasts are made for the coming month from the end of the prior month. The forecast origin is then advanced to the end of the month, where the current month's actual call data are added to the historical database, new parameters are estimated, and then the next month's daily estimates are generated. Error measures of residual standard deviation, mean absolute percent error, and bias are used to measure performance. Statistical analyses are conducted to evaluate if significant differences in performance are present among the six models. The research presented in this article indicates that there are clearly significant differences in performance for the six models analyzed. These models were tailored to the specific structure and this work suggests that the short interval forecasting problems faced by many service organizations has several structural differences compared to the typical manufacturing firm in a made‐to‐stock environment. The results also suggests two other points. First, simple modeling approaches can perform well in complex environments that are present in many service organizations. Second, special tailoring of the forecasting model is necessary for many service firms. Historical data patterns for these organizations tend to be more complex than just trend and seasonal elements, which are normally tracked in smoothing models. These are important conclusions for both managers of operating systems and staff analysts supporting these operating systems. The design of an appropriate forecasting system to support effective staff planning must consider the nature, scope, and complexity of these environments.

Estimating service level impacts from changes in cycle count, buffer stock, or corrective action

Journal of Operations Management 1985
Inventory managers, tasked with providing adequate levels of material support, need to be able to gain insights, in a computationally easy manner, to the magnitude of improvements in protection levels against stockouts that can be gleaned from the three mechanisms available to them—more buffer stock, more physical inventories, or more corrective action to eliminate or reduce the causes for the errors arising in the first place. Armed with quantitative conservative estimates of the types of improvements available from any of these three mechanisms or combinations of the mechanisms, and the relative cost of each, the manager is is a better position to select a cost‐effective, remedial course of action.

An investigation of labor assignment rules in a dual‐constrained job shop

Journal of Operations Management 1985
One of the management decisions required to operate a dual‐constrained job shop is the labor assignment rule. This study examines the effects of various labor assignment rules on the shop's performance. Eleven different labor assignment rules are simulated. A longest‐queue rule and the traditional counterparts of the first‐in‐system, first‐served, shortest operation time, job due date, critical ratio and shortest processing time dispatching rules are used to determine to which work center available workers should be transferred. Also tested are five new labor assignment rules that use an average of the priority values of all jobs in queue at a particular work center to determine whether that work center should receive the available worker. A SIMSCRIPT simulation program that models nine work centers provided the mechanism by which these rules were tested. Five dispatching rules, the counterparts of the five “traditional counterpart” labor assignment rules mentioned earlier, provided different shop environments. Also, the level of staffing of the work centers was altered to provide additional ship environments. Staffing levels of 50% and 67% were employed. The results show that none of the eleven labor assignment rules had a significant impact on shop performance. This is an important result because it implies that a manager can make the labor assignment decision based on other criteria such as ease or cost of application of the rules. These results were relatively insensitive to the shop environment, as represented by the dispatching rule and the staffing level.