The cost of inflated planned lead times in MRP systems

Journal of Operations Management 1985
Much of the current literature in the field of production and inventory control systems stresses the need to revise traditional forms of thinking regarding production processes, the role of inventories for work in process, and the need for reduced lead times or flow times. Group technology, manufacturing cells, and other means of incorporating repetitive manufacturing techniques into traditional job‐shop settings constitute the leading edge in system development. Still, there is resistance to these dramatic changes, and traditional “business as usual” methods still predominate. This study attempts to illustrate graphically the cost justification associated with reduction in lead times which generally results from these new concepts. In most job shops today, lead times are much longer than they need to be due to inflation of lead time estimates. Actual lead times for the manufacture of fabricated and assembled products have been shown to be a direct consequence of the planning lead times used in the MRP planning process—a form of self‐fulfilling prophesy. The research employs a simulation model of a factory using MRP as a planning tool in a multiproduct, multilevel production environment. Manufacturing costs constitute the dependent variable in the experiments, defined as the sum of material costs (including expedite premiums), direct labor costs (including overtime premiums), inventory carrying costs, and overhead costs. The independent variable being manipulated is the planned lead time offset used in the MRP planning process. Twenty values of planned lead time are evaluated ranging from a value that includes no slack time at all (pure assembly line) up to a value that allows 95% slack (queue) time which, unfortunately, is not uncommon in many job shops today. Stochastic variables in the model include customer demand and actual processing times—the sum of set‐up and run times. The result of the study is a cost curve formed over the range of independent lead time variables that is constructed using nonlinear regression techniques. The conclusions from the resultant graph clearly indicate the cost consequences of long lead times, with exponential cost increases beyond the 80–90% queue time level. Total costs are 41% higher at the maximum lead time allowance compared to the minimum. Clearly, this study demonstrates the need for lead time reduction, either through downward adjustment of MRP planned lead times or by introducing new manufacturing concepts.

Multiproject scheduling: Analysis of scheduling strategies under unequal delay penalties

Journal of Operations Management 1985
The multiproject scheduling problem is investigated under the assumption that delays corresponding to different projects carry different penalties. Five penalty functions are introduced that simulate typical business behavior. These are: 1) assigning the highest penalty to the project requiring the greatest amount of resources; 2) assigning the highest priority to the longest project; 3) assigning the highest priority to the project requiring the least amount of resources; 4) assigning the highest priority to the shortest project; and 5) random assignment. Justification for each case is provided. Two powerful project summary measures were used to generate the test problems. The first measure, average resource load factor (ARLF), identifies whether the location of the peak requirement of all (i.e., combined) resources is in the first or second half of the project's critical path. If each resource is expressed in terms of dollars, then ARLF identifies the location of the peak cash requirement. Since in practice the choice of the scheduling strategy is influenced by the location of the peak cash requirement, performance of the scheduling strategies is analyzed with respect to values of this measure. The second measure, average utilization factor (AUF), calculates the ratio of resource requirements to availabilities. It is shown that problems tested must have different AUF values in order to be classified different for purposes of experimental design. Thus a factorial model of the form, y = Strategy + Penalty + ARLF + AUF + ϵ was used to generate 385 problems, each requiring 2 to 4 resources, containing 3 to 5 projects and 34 to 63 activities. The computer program used in the study is based on a parallel method of scheduling in which priorities of the activities are determined when the activity is considered for scheduling. Ten scheduling strategies are tested. Some important ones are: 1) to schedule the shortest activity first; 2) to schedule the activity with minimum slack first; 3) to schedule the activity with maximum work content first (i.e., from the project with highest work content); 4) to schedule the shortest activity from the shortest project first; and 5) to schedule the activity with maximum penalty first. Shortest activity first and minimum slack first are popular strategies introduced by other researchers. Using number of times ranked first as our criterion, scheduling the activity with maximum penalty first provides the best results followed by the strategy of scheduling the activity with maximum work content. But when these results are analyzed with respect to existence of a very expensive project (i.e., dominance) in the problem, performance of the maximum penalty strategy improves. When the overall results are analyzed with respect to values of ARLF, a different picture emerges. Then the strategy of scheduling the activity with the highest penalty first provides the best results if the peak requirement is early. When the peak requirement is toward the middle of a project's unconstrained critical path, scheduling the activity with the highest work content provides the best results. When the peak requirement is late in a project's life, scheduling the shortest activity from the shortest project is the best strategy to adopt. These findings were tested for statistical significance by using nonparametric testing procedures and were found to be significant.

Stochastic unpaced line design: Review and further experimental results

Journal of Operations Management 1985
Previous design studies of unpaced assembly lines that exhibit stochastic task times indicate that an unbalanced allocation of task times results in optimal output rates. In this article, we present a comprehensive review of the previous literature on this topic and discuss the results of simulation experiments that test the bowl distribution for unbalancing unpaced lines. The simulation experiment was designed to test the bowl distribution in more realistic environments than previously tested and illustrates that a balanced line configuration is as good as or better than an unbalanced line configuration when task times are modeled with more typical values of variance. Stochastic unpaced assembly line research employs both simulation and analytical approaches to test the allocation of buffer capacity and task times to work stations. Analytical models are utilized to investigate simple line designs with exponential or Erlang task time distributions. Simulation is used for longer lines and for normal task time distributions. From the review of the previous research using both approaches, we note five major findings: 1) unbalancing task time allocation is optimal when task time variation is large; 2) unbalanced allocation of buffer storage capacity improves line output rate when task time variation is large; 3) output rate of an unpaced line decreases as the number of sequential workstations increases; 4) output rate increases as more buffer storage capacity is available; and 5) output rate decreases as the task time variation increases. Most of the previous research on unpaced lines investigated lines with few workstations and large task time variation. Empirical research by Dudley (6) suggests that variation of task times in practice is much less than variations employed in previous unpaced line studies. We present the results from simulation experiments that model longer unpaced lines with lower levels of task time variance of the magnitude that is likely to occur in practice. The results of our simulation experiments verify the benefits of using the bowl distribution for task time allocation when line lengths are short and task times experience large variance. However, when line lengths are extended or task time variation is reduced, the use of the bowl distribution for unbalancing the line degrades the line's efficiency. In these situations, the optimal task time allocation is a balanced line. Two important implications for managers follow from the results of our experiments: 1) that unpaced line output rate is relatively insensitive to moderate variations from optimal task time allocations when buffer storage is limited; and 2) that perfectly balanced line designs are optimal for most cases in practice.

Safety stocks and component commonality

Journal of Operations Management 1985
In the implementation of an MRP‐based planning system it is often desirable to hold safety stocks at the component level. This approach is typical of a system that assembles finished products to order but builds components to a forecast. The same approach makes sense when end‐item buffers would be prohibitively expensive to maintain, or when there is significant spares demand for the components. The existing theory for sizing component safety stocks is little more than an application of the principles governing single‐level inventory decisions. The standard deviation of the distribution for demand is the key parameter. A multiple of this standard deviation, called the safety factor, is set by management policy. This safety factor determines the size of the safety stock. In simple cases there is a direct relationship between the safety factor and the level of customer service. Component commonality refers to a situation in which one component is common to more than one end item. The presence of commonality makes it difficult to determine safety stocks accurately. The existing theory, which is reviewed briefly, examines the effects of commonality on the component's safety factor. However, commonality destroys the relationship between safety factor and service level. This article introduces a simple example to illustrate this fact. The example suggests some problems that must be addressed if the theory is to encompass commonality. Among these are the need to develop service level measures for multiple products and to analyze the relationship between safety stock and service level.

An efficient implementation of the Wagner‐Whitin algorithm for dynamic lot‐sizing

Journal of Operations Management 1985
We consider an N‐period planning horizon with known demands D t ordering cost A t , procurement cost, C t and holding cost H t in period t. The dynamic lot‐sizing problem is one of scheduling procurement Q t in each period in order to meet demand and minimize cost. The Wagner‐Whitin algorithm for dynamic lot sizing has often been misunderstood as requiring inordinate computational time and storage requirements. We present an efficient computer implementation of the algorithm which requires low core storage, thus enabling it to be potentially useful on microcomputers. The recursive computations can be stated as follows: urn:x-wiley:02726963:joom229:equation:joom229-math-0001 where M jk is the cost incurred by procuring in period j for all periods j through k, and F k is the minimal cost for periods 1 through k. Our implementation relies on the following observations regarding these computations: urn:x-wiley:02726963:joom229:equation:joom229-math-0002 Using this recursive relationship, the number of computations can be greatly reduced. Specifically, additions and multiplications are required. This is insensitive to the data. A FORTRAN implementation on an Amdahl 470 yielded computation times (in 10 −3 seconds) of T = −.249 + .0239N + .00446N 2 . Problems with N = 500 were solved in under two seconds.

The human factor in cellular manufacturing

Journal of Operations Management 1985
Recently, Group Technology (GT) as a batch manufacturing innovation has commanded much research attention and pragmatic interest. This approach to small lot production is based on identifying and exploiting similarities. By grouping items which share common traits, GT facilitates the rationalization of activities in a wide variety of functional areas including purchasing, design, and manufacturing. When GT is used in manufacturing one potential application involves the creation and operation of production cells. A production or manufacturing cell is a group of functionally dissimilar machines that are placed together and dedicated to the manufacture of a specific range of component parts. The usefulness of cellular manufacturing is demonstrated by the impressive catalog of benefits reported by its users both in the US and abroad. Reductions in work‐in‐process and finished goods inventories, decreases in production lead time, better delivery performance, improved product quality, and an overall increase in productivity are but a few of the benefits reportedly accruing to the use of cells. While it appears that cellular manufacturing can significantly improve the operation of batch production, an important component of the GT cellular production system has, unfortunately, been overlooked. Little study has been devoted to the human aspects of the use of production cells. The research reported in this paper attempts to fill this void by systematically examining the effect of cellular production on batch manufacturing employees. The research site was a medium size plant in which a portion of the functionally arranged facilities had recently been converted to a cellular layout. Both functional and cellular workers responded to a questionnaire designed to assess employee perceptions of their jobs, their job satisfaction, and their performance. In contrast to the findings of earlier (ethnographic) studies, cellular manufacturing employees did not perceive greater autonomy, significance, identity, or cohesiveness in their jobs than workers in traditional functional jobs. Cell workers also were as satisfied with their jobs, supervision, and advancement opportunities as non‐cell workers, but were more satisfied with their pay. Supervisory ratings of performance did not vary between groups. The major contributions of this article are threefold. First, this research represents the first attempt to scientifically evaluate the human impact of cellular manufacturing. Second, in contradicting the findings of earlier descriptive studies, all of which emphasize the very positive human consequences of cellular production, the need for additional research which challenges initial intuitive presumptions is clearly indicated. Third, and perhaps most importantly, the findings of this exploratory study suggest that cellular manufacturing does not have a negative impact on worker performance, attitudes, or satisfaction. A ramification of this is that reductions in work‐in‐process and finished goods inventories, decreases in production lead time, and improved overall productivity which reportedly accompany the implementation of cellular manufacturing may be achieved without any human fallout.

Integer goal programming for multistage lot sizing: Experimentation and implementation

Journal of Operations Management 1985 5(2), 169-182
This article considers the issues involved in implementing a large‐scale multistage lot sizing model in a pharmaceutical manufacturing environment, and reports on a series of sensitivity experiments that subsequently examined the critical impacts of system capacity and inventory policy on the specification of a multistage schedule. The model was initially developed as an aggregate scheduling aid for a class of tablet pharmaceuticals. The manufacture of tablet products is a serial‐type process characterized by batch flow. The model placed multiple resource capacity restrictions on various stages of the multistage system to ensure the feasibility of the resultant schedules. Difficulties in estimating penalty costs for shortages were circumvented by employing a multi‐objective formulation of the lot‐sizing problem. Various obstacles encountered during the implementation process are discussed. Model implementation encompassed the development of an approximation algorithm for efficiently solving the large‐scale problem. The performance of the algorithm was evaluated by examining the closeness to optimality of the solutions obtained using the procedure. Performance statistics are presented for the sensitivity experiments discussed herein. Another essential aspect of implementation involved the timely revision of model input parameters. This facet of implementation proved to be at least as important to management as the efficient provision of a “good” solution. Model experimentation centered on variations in the capacities of bottleneck resources and changes in target inventory parameters whose values are predetermined by company policy. The first set of experiments was designed to demonstrate the importance of system capacity to the lot‐sizing process and to illustrate that the location of a system bottleneck can vary over time as a function of both internal and external factors. The results indicated that lot‐sizing procedures that fail to incorporate capacity information or that focus on a single bottleneck production stage in order to schedule production are severely limited with respect to practical and/or long‐term applicability. The final set of inventory‐related experiments indicated that the specification of target ending inventory levels was a crucial factor in the lot‐sizing process. The determination of appropriate target levels must reflect the inherent trade‐off between the objective of minimizing shortages and the desire to avoid excessive inventory accumulations. The generation of usable model information was found to be contingent upon the realistic definition of target level parameters.

Capacitated heuristic program for multiactivity, multi‐facility system designs

Journal of Operations Management 1984
Multi‐activity, multi‐facility design systems occur in a wide variety of industrial and service applications: e.g.: regional health care centers with configurations of activities at each center, and multi‐echelon inventory distribution systems. The problem in designing such systems is to determine from a candidate set of possible locations what facility locations should be opened and what types of activities should be carried out at each of the open facilities. This article presents an efficient heuristic procedure for such a problem. The heuristic procedure described can be used to solve both the uncapacitated and the capacitated problems where capacity is expressed in terms of the number of activities which can be supported by the facilities. Extensive computational experience with the heuristic is presented. The performance of the heuristic is compared against optimal solutions and the results look very encouraging.