Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
1381 results ✕ Clear filters

Optimal maintenance center inventories for fault‐tolerant repairable systems

Journal of Operations Management 1984
In many military and commercial contexts, complex equipment which is expected to perform very reliably is often designed to be fault‐tolerant, that is, able to function although some of the parts have failed. A popular fault‐tolerant design is the m‐out‐of‐n system, where there are n identical parts, at least m of which must be functional for machine operation. Complex equipment of this type often undergoes scheduled maintenance overhauls at regular intervals during which all failed components are replaced. Failure to have replacements on hand for failed parts requires emergency measures at premium cost. When repairable parts are highly reliable and expensive, both holding and shortage costs are high. A reasonable objective is to choose initial spares inventory to minimize the sum of holding costs and expected shortage costs. We first develop a model to determine the optimal repairable parts inventory for a maintenance center servicing machines containing a single m‐out‐of‐n system. The model is then extended to handle a related problem, finding optimal maintenance center inventories for machines containing several m‐out‐of‐n systems of different parts, minimizing total expected costs subject to a constraint on total inventory investment. We assume that there is a fleet of machines, which experience identical workloads. There is a cycle time of T days between overhauls for an individual machine. A machine arrives at the maintenance center for overhaul each day. At the overhaul, all failed parts are removed and sent to a repair shop, from which they eventually return to the maintenance center to be used again as spares. The total number of spares undergoing repair and on hand is a constant. There are no backorders; if the number on‐hand spares is insufficient to meet demand at an overhaul, a shortage penalty is assessed which depends on the number and type of spares required. While computing holding costs is straightforward, computing expected shortage costs is more complex. Expected shortage costs are dependent upon several factors, including component failure rates, the values of m and n, part repair rates, and the initial number of spares on hand. We assume that the system of interest is well specified, so that the parameters of the model are known except for the number of initial spares of each type, which are the decision variables. We model the on‐hand inventory of each type of part as a Markov chain with the number of spares on hand at the end of each day as the states, under the assumptions that failure rates are constant and repair times follow independent exponential distributions. We then calculate the steady‐state probabilities of stockout of various numbers of spares, as a function of the initial spares inventory. The expected shortage costs for a given type of spare may then be calculated by finding the product of the penalty cost for lacking p spares and the probability of lacking p spares and summing over all possible p values. Solutions to the problem of finding optimal initial inventory level for a machine containing a single m‐out‐of‐n system may be found easily by enumeration. Solutions to the constrained problem where the machine contains several independent m‐out‐of‐n systems, may be found by dynamic programming. Sensitivity analysis of costs to changes in the inventory investment constraint is clear, and computational effort is reasonable. A simple example is included to illustrate the solution method for both problems.

Scheduling and resource allocation in a food service system

Journal of Operations Management 1984
The scheduling of food production is often accomplished informally based upon approximate time requirements stated in recipes and the judgment and experience of a food production manager, administrative dietician, or cook. Such schedules are seldom optimized to least overall duration and consequently contain periods of non‐productive time on the part of personnel and resources. In addition, these schedules often attempt to avoid resource conflicts through the early scheduled completion of work activity; this leads to many of the menu items being completed sufficiently in advance of serving time that undesirable changes in the nutritional, organoleptic and microbiological properties of the food can take place. In this paper, a branch and bound algorithm is presented as a solution procedure for the foodservice scheduling problem. The advantage of branch and bound in comparison to a heuristic based scheduling procedure is that it can produce schedules which are optimized to least overall duration from start to finish. The added computational cost of the branch and bound procedure is justified, because most foodservice systems cycle their menus. Consequently, each of a finite number of schedules is reused numerous times over an extended period resulting in long‐term productivity gains. Another advantage of the algorithm is that right‐shifted or late start schedules may be produced. This is in keeping with our objective of minimizing the delay time between the completion of the food and its being served to the consumer. The paper describes a method by which the process time for each of the various steps in a recipe may be computed as a function of the number of servings being prepared. Although these are normally considered to be linear relationships, the algorithm can easily be modified to accept other types of relationships as well. Perhaps the most important aspect of the this research is that the branch and bound algorithm has been implemented to perform branching operations over two classes of decisions. The first class of decisions involves the selection of which recipe steps or activities are to be scheduled at a certain time, and the second class of decisions involves the choice of which resource class to assign to the activities in those cases where alternative resources are allowed. This dual branching philosophy provides a great deal of flexibility to the decision maker for handling the type of scheduling problems commonly found in practice. The expense of this added flexibility, however, is a substantial increase in the size of the decision tree which must be developed and explored. In order to demonstrate the performance of the algorithm for practical purposes, the lunch menus of a short term, acute case, 300 bed hospital in Syracuse, New York were used to develop production schedules. These menus included a total of 89 different hot food items whose recipes were placed into a menu file in the computer along with the coefficients needed to develop process time estimates as a function of numbers of servings to be prepared. In total, fourteen lunch menus are cycled at the hospital; the number of items appearing on the menus ranges from 8 to 14 hot food items. In the first series of tests, resources were assumed not to be interchangeable. The branch and bound procedure was successful in producing optimal solutions for eleven of the fourteen schedules. The three menus which were not optimally solved were aborted, because the size of the solutions tree grew beyond that which could be stored in 500K bytes of common memory. In spite of this, however, the upper bound solutions given by the aborted problems were found to be very close to lower bound values and therefore may be considered as very good solutions. In the second series of tests, certain resources were allowed to be interchangeable for some of the activities. Specifically, we assumed two labor classes. The first of these are called special cooks who are more experienced personnel. Normally special cooks prepare entree items, but they may be called upon in some cases to perform any activity normally performed by the second labor class‐ the less experienced cooks—who normally prepare soups, sauces and vegetables. The cooks, on the other hand, are never allowed to prepare menu items which call for special cooks. These groundrules are identical to those currently in practice at the hospital from which the test problems were obtained. Ten of the fourteen menus were selected for this series of tests. In all of the ten cases, the algorithm successfully developed optimal solutions without exceeding the 500K byte common memory limitation. And, in spite of the vastly increased tree size resulting from the dual decision branches, the computation times for these tests were only modestly greater than those of the first set of tests where alternative resources were not considered. The success of the algorithm in solving the dual decision problems resulted in large part from its ability to develop strong upper bounds very early in solution process. In addition, the characteristics of food production scheduling problems are such that the lower bound pruning is very effective especially in the early stages of tree development. It is important to note that the use of an algorithm such as this in a practical setting affords a very friendly user interface. Once the foodservice system's menu items have been placed into a file, the user may easily select any set of these items to include in a given schedule. Only three lines of data input are required. The first line specifies the number of items as well as the zero‐hour or serving time. The second line identifies the item numbers of the hot‐food items to be scheduled. And the third line specifies the number of servings for each of those items which must be prepared. Kitchen personnel with limited experience can be trained to input the data in less than 15 minutes of instruction time.

Planning horizon results for the dynamic warehouse location problem

Journal of Operations Management 1984
In the last decade, a number of models for the dynamic facility location problem have been proposed. The various models contain differing assumptions regarding the revenues and costs realized in the opening, operation, and closure of a facility as well as considering which of the facility sites are candidates for acquisition or disposal at the beginning of a time period. Since the problem becomes extremely large for practical applications, much of the research has been directed toward developing efficient solution techniques. Most of the models and solutions assume that the facilities will be disposed of at the end of the time horizon since distant future conditions usually can't be forecasted with any reasonable degree of accuracy. The problem with this approach is that the “optimal” solution is optimal for only one hypothesized post horizon facility configuration and may become nonoptimal under a different configuration. Post‐optimality analysis is needed to assure management that the “optimal” decision to open or close a facility at a given point in time won't prove to be “nonoptimal” when the planning horizon is extended or when design parameters in subsequent time periods change. If management has some guarantee that the decision to open or close a facility in a given time period won't change, it can safely direct attention to the accuracy of the design parameters within that time period. This paper proposes a mixed integer linear programming model to determine which of a finite set of warehouse sites will be operating in each time period of a finite planning horizon. The model is general in the sense that it can reflect a number of acquisition alternatives—purchase, lease or rent. The principal assumptions of the model are: a) Warehouses are assumed to have infinite capacity in meeting customer demand, b) In each time period, any non‐operating warehouse is a candidate for becoming operational, and likewise any operating warehouse is a candidate for disposal, c) During a given time period, the fixed costs of becoming operational at a site are greater than the disposal value at that site to reflect the nonrecoverable costs involved in operating a warehouse. These costs are separate from the acquisition and liquidation values of the site. d) During a time period the operation of a warehouse incurs overhead and maintenance costs as well as a depreciation in the disposal value. To solve the model, it is first simplified and a partial optimal solution is obtained by the iterative examination by both lower and upper bounds on the savings realized if a site is opened in a given time period. An attempt is made to fix each warehouse open or closed in each time period. The bounds are based on the delta and omega tests proposed by Efroymson and Ray (1966) and Khumawala (1972) with adjustment for changes in the value of the warehouse between the beginning and end of a time period. A complete optimal solution is obtained by solving the reduced model with Benders' decomposition procedure. The optimal solution is then tested to determine which time periods contain “tentative” decisions that may be affected by post horizon data by analyzing the relationship between the lower (or upper) bounds used in the model simplification time period. If the warehouse decisions made in a time period satisfy these relationships and are thus unaffected by data changes in subsequent time periods, then the decisions made in earlier time periods will also be unaffected by future changes.

Planning horizons for master production scheduling

Journal of Operations Management 1984
Production and operations planning in organizations quite often is a multi‐level sequential process, involving aggregate planning, master production scheduling, and detailed operations planning and scheduling. To obtain good planning results, it is desirable to have a proper planning horizon for each level of planning. There have been a considerable number of studies dealing with planning horizons for aggregate planning or production smoothing problems. There are also many planning horizon studies for single‐item lot sizing problems. No study has addressed the issues associated with the planning horizons for master production schedules (which is a multi‐item lot sizing problem in nature), particularly with respect to the relationship to the aggregate plan. This study addresses the issue of planning horizons for companies employing a make‐to‐stock competitive strategy facing a seasonal demand for their products. We formulate the aggregate planning problem and the master scheduling problem as two separate mathematical programs to approximate the two‐stage process that typically takes place in practice. Rolling planning horizons are used to approximate the periodic updates of the plans commonly done in practice. The models also incorporate resource requirements planning concepts to estimate loads on the critical work centers. The planning process is simulated as a single pass procedure where the results of aggregate planning are passed to the master production scheduling model once per month and the results of the master scheduling model (i.e., the portion of the master schedule actually implemented) are passed back to the aggregate planning model for the next planning session. The experimental results show that when the planner faces extreme cost structures such as high smoothing costs/high setup costs or low smoothing costs/low setup costs, the planning horizon effects are reduced to a minimum. Master schedule planning horizons need not be as long as aggregate planning horizons. Alternatively, non‐extreme cost structures such as high smoothing costs/low setup costs and low smoothing costs/high setup costs should be handled with equal planning horizons for both aggregate planning and master scheduling. It is also found that the firm's cost structure has an impact on the appropriate planning horizon for both aggregate planning and master scheduling. Some cost conditions allow for smaller master schedule horizons. The best horizon choice seems to be equal planning horizons for both aggregate planning and master scheduling, even though the cost savings is slight in some cases. Finally, the proper length of the planning horizon for master scheduling is affected by the planning horizon of the aggregate plans.

The potential of group technology for U.S. manufacturing

Journal of Operations Management 1984
Group Technology (GT) is an innovative approach to batch production which seeks to rationalize a variety of aspects of the conversion process by recognizing and exploiting the underlying sameness which exists among component parts, end items, raw materials and so forth. The majority of GT applications, however, focus on identifying and capitalizing on component part similarities. The central theme of GT when applied to this class of items is the formation of part families based on design or manufacturing similarities (or both). Although the basic principles of GT were described and applied overseas as early as 1950, it is only in the past ten years that any significant and sustained U.S. interest in GT has surfaced. In an effort, first, to determine the status of GT use in the U.S. and, second, to provide some insights as to the desirability of GT for U.S. manufacturers, data was collected on twenty U.S. firms known to use this innovation. A fifteen page questionnaire was employed to gather information on (1) the characteristics of these firms which use GT, (2) the ways in which GT has been applied at these companies and (3) the costs and benefits of these GT programs. The results of this survey, described below, provide an overview of GT practices in a sample of U.S. firms and indicate the potential usefulness of this innovation for a broad spectrum of U.S. manufacturers. The survey responses indicate that GT is a multifaceted tool which can be applied to a variety of problems in a variety of industrial settings. GT has been adopted by both large and small installations involved in the manufacture of metal items produced in small to medium quantity lots. Although no applications were identified outside metal working, the range of metalworking industries in which GT had been implemented is quite broad. Universally, GT was adopted in response to a particular problem or set of problems. Frequently, the need to curb excessive lead times motivated firms to introduce GT. In terms of implementing and using GT there were a number of interesting findings. First, the survey results confirm that GT is more than cellular manufacturing. In fact, the most popular application of GT was in manufacturing engineering, particularly as an aid in rationalizing the process planning function. Seventy‐five percent of the firms had used GT in manufacturing engineering, while fifty‐five percent had set up one or more production cells and an equal number had applied GT to product design. A second interesting finding was that, for the majority of firms, informal procedures for identifying and grouping similar items (i.e. by visual inspection or informed judgement) proved inadequate for pursuing GT applications. Consequently, eighty‐five percent of the respondents noted that formal classification and coding schemes had been used to aid in identifying and exploiting item similarities. The survey also yielded interesting results with respect to the problems encountered in implementing GT. The firms reported that regardless of the type of application (i.e., product design, manufacturing engineering or cellular manufacturing), human resistance to change was the most serious impediment to successfully introducing GT. This obstacle could be surmounted, in most instances, by GT education and by involving those affected by GT as early in the implementation process as possible. A number of other problems specific to the type of GT application were also noted. With regard to the relative ease of implementing GT in various areas, the respondents generally agreed that establishing cells is fraught with more difficulties than are GT applications in manufacturing engineering or product design. With respect to costs and benefits, 85% of the firms reported that the actual benefits from GT met or exceeded their anticipated benefits. Specific savings frequently mentioned included reduced lead times and easier preparation of process plans. Costs for planning the GT program and for purchasing additional computer hardware and software were the most commonly cited GT‐related expenses. In terms of prerequisites for success in implementing GT, the overwhelming majority of respondents agreed that two elements are essential. The first is GT education for all those (managers, supervisors and line personnel) who are affected by the changes that accompany GT's introduction. The second critical factor is top management's commitment to GT principles and support for the personnel involved in directing the GT efforts. Thus, to the extent that the firms included here are representative of a broader spectrum of U.S. manufacturers, one can conclude that in the presence of top management encouragement and a commitment to GT education, batch manufacturers involved in metalworking and facing any of a variety of problems could benefit from putting into practice GT principles.

The effects of input control in a simple scheduling model

Journal of Operations Management 1984
Input control is a generic procedure for smoothing production workload by delaying work during intervals of heavy load. While input control techniques have several practical benefits, they also have an inherent disadvantage. By restricting the set of jobs available for scheduling, an input control procedure removes some of the scheduling options that would otherwise be available. This paper examines the impact of such a procedure in a simple simulation model. The simulation model represents a production shop in a simplified way, as a single machine, but the production control system has three distinct parts. The first part assigns due‐dates to customer orders, taking into consideration the size of each job and the workload in the shop. The second part is a job releasing rule that implements input control. The third part is a priority dispatching procedure that is aimed at meeting due‐dates. By representing this three‐part control system the model provides an opportunity to explore the interdependence between input control and other control procedures. Reinforcing previous research, the simulation experiments confirm that modified due‐date priorities perform more effectively than other basic priority rules when performance is measured by average tardiness. Moreover, the experiments indicate that performance under the modified due‐date regime is never improved by the use of input control. On the other hand, with dispatching rules that rely on shortest‐first or critical ratio priorities, the experiments indicate that input control is sometimes advantageous. The effects of input control on scheduling performance thus appear to be somewhat complicated, and further experiments were designed to explore some of the relationships involved. The principal finding, however, provides a warning that input control can be counterproductive.

Optimum stock levels for excess inventory items

Journal of Operations Management 1984
Insufficient attention has been focused on the ubiquitous problem of excess inventory levels. This paper develops two models of different complexity for determining if stock levels are economically unjustifiable and, if so, for determining inventory retention levels. The models indicate how much stock should be retained for regular use and how much should be disposed of at a salvage price for a given item. The first model illustrates the basic logic of this approach. The net benefit realized by disposing of some quantity of excess inventory is depicted by the following equation: urn:x-wiley:02726963:joom245:equation:joom245-math-0001 This relationship can be depicted mathematically as a parabolic function of the time supply retained. Using conventional optimization, the following optimum solution is obtained: urn:x-wiley:02726963:joom245:equation:joom245-math-0002 where t 0 is the optimum time supply retained; P is the per‐unit purchase price; P s is the per‐unit salvage price; C is the ordering cost; Q is the usual item lot size; F is the holding cost fraction; and R is the annual demand for the item. Any items in excess of the optimum time supply should be sold at the salvage price. The second model adjusts holding cost savings, repurchase costs, and reorder costs to account for present value considerations and for inflation. The following optimum relationship is derived: urn:x-wiley:02726963:joom245:equation:joom245-math-0003 where i is the expected inflation rate and k is the required rate of return. Unfortunately this relationship cannot be solved analytically for t 0 ; Newton's Method can be used to find a numerical solution. The solutions obtained by the two models are compared. Not surprisingly, the present value correction tends to reduce the economic time supply to be retained, since repurchase costs and reorder costs are incurred in the future while salvage revenue and holding cost savings are realized immediately. Additionally, both models are used to derive a relationship to describe the minimum economic salvage value, which is the minimum salvage price for which excess inventory should be sold. The simple model, which does not correct for time values, can be used by any organization with the sophistication level to use an EOQ. The present value model which includes an inflation correction is more complex, but can readily be used on a microcomputer. These models are appropriate for independent demand items. It is believed that these models can reduce inventory investment and improve bottom line performance.

A cost‐effective approach to stochastic line balancing with off‐line repairs

Journal of Operations Management 1984
The layout of production facilities is an important determinant of the productivity potential of a manufacturing enterprise. It is particularly important in the design of assembly lines where the objective is to assign tasks to work stations in such a way as to minimize total variable production costs. Early approaches to the line balancing problem assumed known constant task times and sought a line layout which would produce the desired output with the fewest number of work stations, which is equivalent to minimizing idle time. Studies have shown that task times are random variables, therefore the cost of task incompletion must be considered a part of total production cost. Incompletion cost will be the cost of repairing or completing tasks which cannot be completed within the cycle time after the item has reached the end of the assembly line. This paper describes a methodology for designing approximately minimum cost paced assembly lines under conditions of random task times and off‐line repair of incompleted tasks. Task times are assumed to be normally distributed random variables with known means and variances. The methodology consists of heuristically identifying a large number of feasible balances for each of which total costs are computed. The line design with the lowest total is retained as the “best.” In order to evaluate candidate line layouts, a total cost model is developed. Total cost is the sum of normal operating cost—which is simply a function of the number of work stations—and the cost of repairing products containing incompleted tasks. Because this latter cost is a random variable for a given balance, the expected value is used to evaluate a candidate layout. The cost associated with one or more workers exceeding the cycle time is the product of the probability of this happening and the expected cost of off‐line repair. The heuristic method for generating feasible balances builds work stations from continually updated lists of precedence satisfying tasks. Qualifying tasks are added to the station as long as the probability of the station exceeding the cycle time remains below a pre‐specified threshold. The methodology requires systematically varying this threshold to permit a lowest total cost solution to emerge. The process of generating a large number of balances for a particular threshold is efficient. Evaluating the total costs of the resulting balances takes the majority of the computational time. An experiment was conducted in order to compare the above cost‐effective methodology with a purely deterministic approach and a commonly used industrial approximation method for dealing with task time variability. The experiment applied the three methods to four problems from the literature under a variety of repair cost and time variance conditions. In 21 of the 24 cases studied, the stochastic method produced a lower cost balance than the two alternatives. In the remaining 3 cases, the deterministic method also found the lowest cost balance. The stochastic method saved an average of 22.5 percent in total operating cost over the deterministic method and 8.4 percent over the industrial method. The experiment clearly showed the need to explicitly consider task time variability in arriving at a line balance. The stochastic approach of this paper offers large potential savings with no risk of obtaining a less desirable balance and so should be considered for implementation whenever there is a variation in task times. Even for large‐scale problems, the computational cost is infinitesimal in the context of assembly line balancing, where very small improvements in productivity can mean substantial increments to profitability.

A heuristic programming approach to the employee scheduling problem and some thoughts on “managerial robots”

Journal of Operations Management 1984
We describe a system for the automatic scheduling of employees in the particular setting in which: the number of employees wanted on duty throughout the week fluctuates; the availabilities of the employees varies and changes from week to week; and a new schedule must be produced each week, by virtue of the changing demand for service. The problem which we address appears in a variety of settings, including: airline reservation offices; telephone offices; supermarkets; fast food restaurants; banks and hotels. Previous approaches to the problem have relied chiefly on formal methods, generally involving one or another variation of linear or integer, mathematical programming. We suggest that except in cases involving very small problems (only a handful of employees) that those approaches have not proven promising, especially where union rules and management requirements impose complex constraints on the problem, and that a heuristic approach has proven to be substantially superior. We set forth the general features of our heuristic approach, which we see as an application of artificial intelligence; we show how, in contrast to other approaches, which design shifts as if employees were always available and try to fit those shifts to employees who are not always available, our system design shifts with deference to the employees' limited availabilities; we suggest that, for a given service level, our system produces schedules with a better “fit”—number of employees actually on duty comparing more favorably with the number wanted; and we state that while, for a given service level, a ‘manual scheduler’ may take up to 8 hours each week to prepare a good schedule, our system, on most micro computers, routinely produces better schedules involving up to 100 employees in about 20 minutes. The scheduling of employees is generally considered to be a managerial function, in the setting of the problem we address. When a craft employee is replaced on an assembly line by a machine which performs the same function, we speak of the replacing mechanism as an industrial robot. We suggest that systems like that which we describe deserve a name, to distinguish them from comparable, computer based systems which do not replace, but rather supplement a manager, and we suggest the name ‘managerial robot’ for such systems. We set forth the characteristics which we feel would justify applying the term ‘managerial robot’ to a computer based system, and suggest that classification is basic to understanding and communication and that just as terms such as decision support systems and expert systems prove useful in our increasingly advanced, technological society, so also the term managerial robot has a place in our scheme of things. Decision support systems do not qualify as managerial robots for the reason that managerial robots don't simply support the decision making process, but rather replace the manager in his performance of a function which, when performed by a human being, is considered a managerial function. Nor do we consider managerial robots to qualify as expert systems. While our scheduling system contains an inference mechanism, and could be enhanced to improve the quality of its schedules thru ‘experience’ (and thus to ‘learn’?), that—lacking a knowledge base in the sense of expert systems‐and most of all in replacing rather than supporting the decision maker, the managerial robot needs a term of its own. We elaborate, in this paper, a specific application of our system, and show how the design of shifts, and the placement of breaks, serve to yield a fit whose quality no human scheduler can duplicate.

Resolving uncertainty in manufacturing systems

Journal of Operations Management 1984
This paper examines the effectiveness of three commonly practiced methods used to resolve uncertainty in multi‐stage manufacturing systems: safety stock under regenerative material requirements planning (MRP) updates, safety capacity under regenerative MRP updates, and net change MRP updates, i.e., continuous rather than regenerative (periodic) updates. The use of safety stock reflects a decision to permanently store materials and labor capacity in the form of inventory. When unexpected shortages arise between regenerative MRP updates, safety stock may be depleted but it will be replenished in subsequent periods. The second method, safety capacity, overstates the MRP capacity requirements at the individual work centers by a prescribed amount of direct labor. Safety capacity either will be allocated to unanticipated requirements which arise between MRP regenerations or will be spent as idle time. The third method, net change, offers a means of dealing with uncertainty by rescheduling instead of buffering, provided there is sufficient lead time to execute the changes in the material and capacity plans. Much of the inventory management research has addressed the use of safety stock as a buffer against uncertainty for a single product and manufacturing stage. However, there has been no work which evaluates the performance of safety stock relative to other resolution methods such as safety capacity or more frequent planning revisions. In this paper, a simulation model of a multi‐stage (fabrication and assembly) process is used to characterize the behavior of the three resolution methods when errors are present in the demand and time standard estimates. Four end products are completed at an assembly center and altogether, the end products require the fabrication of twelve component parts in a job shop which contains eight work centers. In addition to the examination of the three methods under different sources and levels of uncertainty, different levels of bill of material commonality, MRP planned lead times, MRP lot sizes, equipment set‐up times and priority dispatching rules are considered in the experimental design. The simulation results indicate that the choice among methods depends upon the source of uncertainty, and costs related to regular time employment, employment changes, equipment set ups and materials investment. For example, the choice between safety stock and safety capacity represents a compromise between materials investment and regular time employment costs. The net change method is not designed to deal effectively with time standard errors, although its use may be preferred over the two buffering alternatives when errors are present in the demand forecasts and when the costs of employment changes and equipment set ups are low. The simulation results also indicate that regardless of the method used, efforts to improve forecasts of demands or processing times may be justified by corresponding improvements in manufacturing performance.