Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
2 results ✕ Clear filters

Managing product lines that share a common capacity base

Journal of Operations Management 1983 open access
This paper examines the difficulties of maintaining competitive delivery times on product lines that share a common capacity base. The analysis is derived from a case study of a manufacturing firm producing finished product and service parts at a single plant. A system dynamics simulation model is used to represent production and ordering policies of the firm and its distribution network. Simulation analysis shows that these policies cause demand volatility for the finished product to be converted into supply volatility of service parts, leading to long parts delivery times and loss of service parts market share. To improve the performance of the service parts business, the production of finished product and parts should be decoupled, so the supply of the two product lines becomes independent. The results are discussed for the general multiproduct‐line case. A brief report of implementation results is included.

The use of workload information to control job lateness in controlled and uncontrolled release production systems

Journal of Operations Management 1983 open access
The performance of a workload dependent scheduling and due date assignment rule is investigated. The rule uses time‐phased workload information and time‐phased capacity information. Performance comparisons are made with a rule that uses only time‐aggregated workload information. The performance for two methods of releasing jobs to the shop is investigated: an uncontrolled method where the jobs are released at random, and a controlled method where jobs are released to maintain a specific workload norm. Computer simulation is used as the research tool. The mean and standard deviation of lateness are used as performance measures. The results indicate that the use of time‐phased workload information may decrease the variance of the lateness, as compared with the use of time‐aggregated workload information only. However, the magnitude of the effect depends on the type of sequencing rule used. Furthermore, if time‐phased information is used, control of the mean lateness requires that the amount of capacity available for loading used in the loading procedure differs from the amount of capacity actually available for production. It is shown that by selecting adequate parameter values, both a constant mean lateness and a small variance of lateness can be obtained with this type of assignment rule. These results are valid for both types of release situations. So even in the case where the workload of the shop is under strict control, and the mean operation flow time does not, therefore, vary, the use of time‐phased workload information can decrease the variance of the lateness.