Knowledge that Transforms
To make high-quality research more accessible and easier to explore.
Fields:
1801 results
✕ Clear filters
Status and structure of quality and reliability management systems: Investigations of the organization and structure of reliability and quality management systems in UK and European industries to establish benefits of such programs and the interrelationship between them
A stochastic model for determination of the optimal number of tools for the machine group in a flexible manufacturing system
A knowledge‐based approach for expediting in manufacturing facilities
International manufacturing configuration and competitive priorities: Case studies in four industries
Scheduling of jobs on computerized document processors in a bank check processing system
Scheduling of job shops with buffer restrictions
Manufacturing strategy and the environment: An analytical study
On the stochastic sequential and non‐sequential production planning problem
This dissertation examines a stochastic sequential and a non-sequential capacitated production planning problem (Bitran and Yanasse, Operations Research, 32, 5, 1984) where the demand of each period is a continuous random variable. The stochastic non-sequential production planning problem is at first examined with sequence independent and then with sequence dependent set-up costs and the worst case error determined when an approximate solution is obtained by solving the deterministic equivalent. We prove in general that the worst case error is not dependent on the nature of the set-up cost. Based on a result due to Huang, Ziemba and Ben-Tal (Operations Research, 25, 2, 1977) we identify a family of approximations for both the stochastic sequential and the stochastic non-sequential production planning problem. We find a problem which bounds the stochastic sequential problem of two period from above: the upper bound coupled with Bitran and Yanasses' (Operations Research, 32, 5, 1984) lower bound enable us to perform worst-case analysis. Given uniformly distributed demand, this analysis produces results within 23% of optimality. Finally, we derive conditions such that an order-up-to the service level policy is optimal for the T-period stochastic sequential capacitated production planning problem.