Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
1801 results ✕ Clear filters

A multivariate approach for assessing facility layout complexity

Journal of Operations Management 1990
The block layout problem is concerned with locating activities or departments of an organization such that those activities with the strongest interrelationships are closest to each other. Many solution procedures have been proposed for this problem. Research indicates that certain solution procedures perform reasonably well on certain data sets, but yield less desirable results on other problem sets with no clearly superior procedure emerging. Attention has focused on the complexity of the problem as the deciding factor. The measure of complexity most commonly used is the coefficient of variation of the problem data. As the coefficient of variation increases, it is suggested that human planners might be better able to handle the problem. The research in this area indicates mixed results. It is argued in this paper that these measures are overly simplistic and cannot fully capture all of the aspects which determine problem complexity. A multivariate approach for measuring problem complexity is proposed. This approach is based upon the inherent structure of the problem itself. It is thus based on structural pattern recognition. An algorithm for determining the basic substructures and megastructure of a problem is proposed. Differences in performance of different solution procedures on different layout problems are examined using this multivariate approach. The approach is illustrated with example problems from the literature. An unpublished problem from a company is used to illustrate the utility of the megastructure as a guide for laying out a facility.

Economic justification of group technology software: Documentation and analysis of current practices

Journal of Operations Management 1990
Group technology (GT) software represents a type of information systems that support data analysis and decision making in connection with implementations of the GT philosophy. Thus, GT software is used for design and pre‐production planning activities rather than for frequent and routine operating decisions. Considering that GT is fundamental to many modern manufacturing technologies (e.g., computer‐aided process planning, design for manufacturability, cellular manufacturing), the justification of GT software systems is of particular interest. However, very little information on this process, and its related problems, exists in the literature. This paper documents and analyzes justification procedures for GT software that have been recommended in the literature or followed by GT software adopters. The major purpose is to explore and/or improve on the types of benefits that are associated with GT software, the sources from which potential adopters gain access to benefit data, and the relevance and accuracy of these data for the purpose of justifying GT software. A classification scheme for benefits is introduced to help structure this discussion. The findings are based on information collected from three major software vendors, interviews with five manufacturing firms, and published sources in the GT and information systems areas. Although there is a body of collective experience regarding GT applications that can be used to estimate benefits, this study indicates that economic justification of GT software is surrounded by great uncertainty. It is logical to call for more research on appropriate measurement systems and performanceinfluencing factors so that detailed and stratified data can be collected. However, the difficulties associated with this, and the slowness by which new data are likely to be accumulated, suggest that this is not a viable (short‐term) solution to the justification problem. Rather, the insights gained from this study suggest that accuracy in economic projections requires a solid understanding of the application areas to which GT software will be applied, the nature of the potential benefits, and the conditions under which these benefits will occur. This knowledge may prevent the uncritical adoption of benefit data from published sources or from other firms. It can be noted that the linkage between economic justification (i.e., economic forecasts of implementations) and implementation strategies is usually absent or only weakly developed in the literature. This relationship needs to be explored in future research in order to fully understand technology justification processes. This is particularly important in the case of GT software since many major benefits are indirect, i.e., their realization is not based on efficiency gain derived from software usage, but on the implementation of decisions reached by analyzing data. The findings of this study should be of interest not only to practitioners contemplating adoption of GT software or researchers studying GT applications, but to anyone involved with technology justifications in general.

A procedure for dealing with multiple objectives in cell formation decisions

Journal of Operations Management 1990
A procedure for dealing with multiple objectives in cell formation decisions is proposed. Theoretical foundations from multiobjective decision making have been utilized to provide a framework for the study. The purpose of the study is to develop a procedure that provides managers with a means of developing multiple objective cell formation decisions as an alternative to intractable integer programming models. We use a best of random seeds heuristic to generate a large number of alternatives. Nondominated solution theory is used to develop a list of potentially useful alternatives. Finally, preference cone theory is used to aid decision maker selection from these nondominated alternatives. Each of these three technologies have been developed elsewhere. This study considers aspects of applying these technologies to cell formation decisions. The procedure and its theoretical underpinnings are explained step‐by‐step and illustrated in a four‐objective, four‐cell, 24‐machine, and 50‐part cell formation problem. The example contains 12 nondominated solutions and requires only four pairwise comparisons of nondominated solutions by a decision maker before convergence to the preferred solution. Computer processing requirements are not burdensome, and decision maker participation is expected to be efficient.

Toward a universal classification and coding system for assemblies

Journal of Operations Management 1990
A variety of group technology‐based classification and coding systems have been developed to handle piece parts. These systems typically characterize parts by geometry or processing requirements, or some combination of the two. However, while there are a few situation specific classification and coding systems that address assemblies, there is no universal paradigm for the design and implementation of such a system. Part of the reason for the lack of such a system is probably due to the inherent difficulty in finding a common basis within the diversity of assemblies from industry to industry. This diversity has necessitated a “reinventing of the wheel” from case to case. In this project, we develop a GT‐based classification and coding system designed for assemblies, with specific application to a firm in the pulp and paper making machinery industry. At the same time we attempt to develop a general framework for the design of such specialized coding systems. The framework we propose focuses upon GT‐based classification and coding systems from the traditional management information system perspective; that is, the needs of the users, current and future, drive the system logic. We perceive two primary uses of the classification and coding systems. One use is for the direct retrieval of engineering designs and manufacturing plans, thus inducing efficiency within the design and planning functions. Thus, the system must reflect the practices. conventions, and culture of the organization. In most cases, this use of the system is the most immediate, it has the most immediate financial benefits, and in our case, it was the rationale for justifying the expense of the project. The second use of such a coding system is to make information contained within the engineering and manufacturing data bases readily available for operational analysis and management decision making. Examples of this include: analysis investigating cellular restructuring, cost and profit analysis of engineering designs, and evolutionary development of engineering standards by judicious editing of the data bases. The first use implies a strong focus on the user, with considerable time spent determining any cultural phenomena which may impact system use. The second use implies a need for extreme clarity in the categorization inherent in the coding structure. For example, considerable time was spent investigating blueprints to determine the diameter frequency distribution of a particular type of forging. Upon consultation with the firm. we discovered that our categorization roughly matched the categorization implicit in the pattern numbers used by their foundry. After a number ot iterations we determined a categorization of the diameter of this particular forging which reflected the reality of the empirical distribution of diameters and adhered closely with the traditionally used pattern numbering scheme. The result was that this portion of the code structure reflected current firm practice while accurately providing frequency of occurrence data which may in the future be useful to management. The dimensions of assemblies considered in our assembly coding system included: Function . The basic functional requirement satisfied by the assembly. Shape . The intrinsic and observable shape of the assembly. Dimensions(s) . Critical dimensional ranges of the assembly. Facets(s) . The inclusion of specific detailed items which support the primary intrinsic function of the assembly. Feature(s) and detail(s) . The inclusion of items which complement the primary intrinsic function of the assembly. Material(s) . The material specification of the assembly. The final form of our coding and retrieval system was three tiered, including a GT‐based coding system for piece parts, a custom GT‐based coding system for assemblies, integrated with an existing top‐down retrieval system for “large” final assemblies (whole paper‐making production systems). The top‐down retrieval system was based primarily on function, technology, and customer information. The coding and retrieval of final assemblies is used for all components tied to a unique assembly, while the coding and retrieval of piece parts and subassemblies is used for all components that are not specific to any particular final assembly. Such a system allows for rapid coding and retrieval of all piece parts, subassemblies, and assemblies manufactured by the firm.

Scheduling random flexible manufacturing systems with dynamic environments

Journal of Operations Management 1990
American designers are designing more flexibility into flexible manufacturing systems (FMSs). However, there has been little research on the scheduling of these more flexible systems. This study adds insights into how these systems should be scheduled and increases our understanding of the influences of routing flexibility. A few American FMSs use off‐line schemes for scheduling but most use real‐time schemes. This research compares seven real‐time and two off‐line scheduling schemes for a random flexible manufacturing system. The results indicate that full advantage can be taken of these more flexible systems if off‐line schemes are used. The scheme that takes the greatest advantage of increased flexibility is an off‐line scheme that decomposes the scheduling problem. As flexibility increases this scheme is able to schedule more output and reduce the average flow time of parts, and it accomplishes this with little additional computational effort.

Use of the net present value criterion in a random job shop where early shipments are forbidden

Journal of Operations Management 1990
Both practitioners and researchers in the field of Operations Management have suggested that shop scheduling should be an integral component in both the strategic and tactical plans for an organization's assets. This paper examines the use of an accepted measure of return on assets, net present value (NPV), in a simulated shop scheduling environment where early shipment of jobs before their due dates is forbidden. In addition, early shipment of raw materials to the shop is also forbidden. This shop environment is consistent with the prevalent practice in industry of accepting orders only on a just‐in‐time basis to reduce purchased parts inventories. The NPV measure provides a means of balancing a variety of performance criteria that have been treated as separate objectives previously, including work‐in‐process inventory, finished goods inventory, mean flow time and mean tardiness, while also providing a means of measuring monetarily the value of various shop scheduling approaches. The NPV performance of priority scheduling rules and order release policies is measured in this research through the simulation of a random job shop under a variety of environmental conditions. It is found in a comparison of priority rules that use time‐based information with those that use job value information that the Critical Ratio rule provides higher average performance than the three other rules used in the study. However, in some situations that are consistent with JIT practice, value‐based priority rules also perform well. The use of a mechanism for delaying the release of jobs to each work center in the shop provided higher average NPV when shop utilization was set at a low level of 80%, while immediate release of work upon its arrival to the shop provided superior performance at a higher shop utilization level of 94%. While JIT materials delivery and costing yields higher NPV, it did not alter the relative ranking of priority rule/release policy combinations. In addition, it was found that environmental factors, including average job length, average number of tasks per job and level of tardiness penalty, resulted in greater variations in NPV performance than the institution of a JIT raw materials delivery policy.

A conceptual model for demand management in the assemble‐to‐order environment

Journal of Operations Management 1990
The term demand management encompasses the activities required to accept customer orders and promise them productive capacity. This activity is central to effective manufacturing planning and control. The popularity of just‐in‐time systems suggests that manufacturers are steadily losing authority for establishing order delivery dates, further confounding the demand management process. No reported research has suggested how this process can be performed. This paper presents a rigorous description of the demand management process in the assemble‐to‐order environment, as a mathematical model. The description provided in this model should be viewed as an initial attempt to define the complex challenges that arise in dealing with demand management on an operational level. The focus of this model is short‐term decision making involved in controlling demand management—accepting orders and dispatching capacity to fill the orders. The problem is presented in the context of the assemble‐to‐order environment which requires the monitoring of both a final assembly schedule and a master production schedule. The factors involved in effective decision making for demand management including capacity availability, relative costs, and the relative timing of prospective customer orders are discussed. A simple example is presented to illustrate the performance of the mathematical model.

The genealogy of operations management

Journal of Operations Management 1990
We investigate, through a mail survey, the rejuvenation of the field of operations management since the late 1950s. We use two primary measures in our study: the trends in dissertation topics and the productivity of doctoral advisors and their students. Scheduling, process design and inventory control have been the most popular dissertation topics. Aggregate planning, forecasting, location and layout, maintenance, interdisciplinary and project management have remained relatively constant in popularity over the decades. Strategy, distribution and process design are growing in popularity, while OR/MS is decreasing. Work measurement, finance/economics, and marketing appear to have virtually ended. The most dominant current research interest (as distinct from dissertation topics) is process design, with significant growth in interest in the categories of strategy, quality and service operations. Analysis of the productivity of doctoral advisors indicates that the field is growing at a slow but steady rate. In general, the field has been increasing its yearly production of graduates at the rate of a little less than one graduate per year since 1960. Looking at individual advisors, productivity grows relatively steadily until about the time of the second sabbatical, whereupon it takes a drastic drop. Thereafter, it resurges, but to a lower rate and then slowly tapers off. Fifty‐eight percent of the respondents have had no direct doctoral students, for a variety of reasons. Of the rest, most have had just one student, but one advisor (Gene Groff) has had as many as 21. In terms of total descendants, the range is none up to 47 (Jack Muth). Ten advisors account for almost half of all the doctorates in the field, while another ten (with a large overlap) have had from two to four levels of descendants. These chains of descendants are illustrated in the paper. Overall, it appears that a dozen or so individuals have largely shaped the field in terms of doctoral production, one measure of contribution to the evolution of the field. Based on the careers of these individuals, it seems that major productivity changes tend to occur around sabbatical years. Also, about one‐fourth of an advisor's students go on to produce students themselves. However, in spite of the large variability in individual advisor productivity, as well as falloffs and resurgences in productivity over the course of individuals' careers, the cumulative growth of the field has almost perfectly followed a quadratic curve.