Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
1801 results ✕ Clear filters

Production planning for mixed assembly/arborescent systems

Journal of Operations Management 1990
In the automotive industry, components are fabricated from raw materials; modules from components; and subassemblies from modules. Final assembly of the end item, the vehicle, then follows. Such a process would be called an “assembly system” if each lower‐level entity (raw material, component. module) were used in only one immediate successor entity (component, module, subassembly). It is common to represent the bill of materials as a directed network. The nodes of this network are entities in the bill of materials; arcs in the network point from lower level entities in the direction of higher level entities and toward the end product. For example, if components 1 and 2 were combined to produce module a , there would be an arc from node 1 to node a . Similarly, there would be an arrow pointing from node 2 to node a . A pure assembly system may thus be described by saying that each node has at most one direct successor, although it may have several immediate predecessors. Similarly, a pure “arborescent network” is the prototype for a distribution system, whereby each node (say a warehouse) may have at most one immediate predecessor (distribution center), but possibly many immediate successors (retailers or smaller warehouses). The focus of this paper is that a complex manufacturing system often has arborescent or non‐assembly portions in its network. In automotive assembly, a given component frequently appears in more than one subassembly in the manufactured product. Certain components are used in each of four wheels; left‐ and right‐side body subassemblies contain common modules. The result is a mixed assembly/arborescent structure. Mixed assembly/arborescent structures also merit consideration as the prototype for combined production/distribution systems. In this article, we consider such mixed structures by building on properties of pure assembly and pure arborescent systems. First, for a wide class of parameters and various pure assembly structures, we study several single‐level lot‐sizing algorithms in conjunction with the cost‐parameter‐revision method of Blackburn and Millen (1982b). Cost‐parameter revision is a way to account for the impact at other stages, of decisions made at a given stage, in a pure assembly system. We also show it is better not to revise these cost parameters for a pure arborescent system. Our approach to a mixed assembly/arborescent system is thus based on identifying its “largest, independent pure assembly sub‐graph.” This is a significant subsystem of the original graph or network, the largest portion that is pure assembly in nature. Modification of the cost parameters there, followed by stage‐by‐stage application throughout the whole network of the best single‐stage lot‐sizing method, gives lower total costs than when no cost revision is applied in the mixed system. Suggestions are then made for further research.

Shift scheduling in services when employees have limited availability: An L.P. approach

Journal of Operations Management 1990
This paper compares two linear programming (LP) models for shift scheduling in services where homogeneously‐skilled employees are available at limited times. Although both models are based on set covering approaches, one explicitly matches employees to shifts, while the other imposes this matching implicitly. Each model is used in three forms—one with complete, another with very limited meal break placement flexibility, and a third without meal breaks—to provide initial schedules to a completion/ improvement heuristic. The term completion/improvement heuristic is used to describe a construction/ improvement heuristic operating on a starting schedule. On 80 test problems varying widely in scheduling flexibility, employee staffing requirements, and employee availability characteristics, all six LP‐based procedures generated lower cost schedules than a comparison from‐scratch construction/improvement heuristic. This heuristic, which perpetually maintains an explicit matching of employees to shifts, consists of three phases which add, drop, and modify shifts. In terms of schedule cost, schedule generation time, and model size, the procedures based on the implicit model performed better, as a group, than those based on the explicit model. The LP model with complete break placement flexibility and implicitly matching employees to shifts generated schedules costing 6.7% less than those developed by the from‐scratch heuristic.

Guidelines for setup‐cost reduction programs to achieve zero inventory

Journal of Operations Management 1990
Historically, academics and managers have approached inventory management by assuming setup cost is constant. However, recently, particularly through the experience of the Japanese, we have seen that setup time and setup cost are by no means fixed. For example, one approach to reduce setup, SMED (single minute exchange of die) suggests setups can be reduced from days to minutes. Furthermore, setup reduction is identified as one of the key facilitating factors for just‐in‐time manufacturing. In light of this development, there is an emerging stream of literature on setup reduction. This research stream generally follows the tradition of the lot‐sizing literature; the optimal amount of setup reduction is determined given a total cost model and a setup cost/reduction investment function. However, a limitation of these models is that they focus on a single item and typically include only setup and inventory costs. A key insight from the literature is the counter‐intuitive notion that setup reduction yields increasing marginal returns. Thus, we consider the issues faced by a manager trying to prioritize setup reductions for multiple items. As with the SMED philosophy, where the target is to reduce all setups to less than ten minutes, we do not seek to optimize the amount of setup reduction. Instead we are concerned with establishing an economical sequence for reductions. In general, we assume setup reductions are cost‐justified by direct or indirect benefits. This paper is organized into six sections. The first two sections introduce the problem and review the relevant literature. The third section determines for a single item operating under the EOQ assumptions, what fraction setup must be reduced to achieve a target order quantity. The target may be zero‐inventory, which is alternately defined as an EOQ of one or lot‐for‐lot production. A simple graph for use by managers is provided to show the relationship of target order quantity and fraction setup reduction required. In the fourth section, the implications of setup reduction are extended to multiple items. The principal management issue in this situation is that given two items, which item should be scheduled for setup reduction first. We provide the manager with a simple guideline in the form of the savings ratio (SR), which contrasts the potential savings of the two setups. We show that the decision between two items is dependent on the dollar volume of the items adjusted for how far each item is from a period order quantity of one. Section five develops a formula for determining the maximum allowable setup cost to achieve lot‐for‐lot (zero‐inventory) production for the case of time‐varying demand. Using a marginal cost approach, we determine that a manager need only target setup reduction to justify not batching the lowest expected single period demand over the planning horizon. We show that a setup should be reduced more when a longer planning horizon is considered because there is a greater chance for a low single period demand. In the special case where there are periods of zero demand we find that the maximum setup cost may be higher because the setup cost is compared against multiple periods of carrying charges. The final section considers the application of the savings ratio concept to multiple items with time‐varying demand. SR is defined only for the general case, because the unique interactions of item parameters and the calculation of total costs with the Wagner‐Whitin algorithm preclude a closed‐form solution. However, we did find items with greater variability and. therefore, lower expected single period demands will tend to have higher priority for setup reduction. Thus. a management objective parallel to setup reduction may be to manage the variability of demand. This research is unique in that it suggests guidelines for managers initiating setup‐reduction agendas with multiple items. Our research shows that the potential savings and preferred sequence of reductions is dependent on the interactions of several item parameters (i.e., current setup cost, unit costs, total demand, demand variability, and target lot‐size). To account for these interactions we introduce the savings ratio as a simple procedure to prioritize items for setup reduction. This paper concentrates on setup defined as setup time and assumes a “relevant range” of capacity in which the opportunity costs are constant per unit time. Thus. we assume that regardless of how much additional time is generated by setup‐time reduction, each time unit will yield the same benefit.

An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system

Journal of Operations Management 1990
The presence of an order release function, where dispatchers can release or hold jobs from the first work center, has yielded beneficial results in practice but inconsistent results in research. Previous research results contradict the notion that shop floor information should be used to trigger the release mechanism. At the same time, such information has been effectively used to assign realistic due dates to released jobs. This study extends previous work on order releasing and due date assignment by providing a controlled comparison of three order releasing and two due date assignment heuristics in conjunction with six scheduling heuristics in a cellular manufacturing environment. Results show that controlled release deteriorates flow time, lateness, and tardiness performance and is inferior to both immediate and interval release. Controlled release appears to work best in situations of low load and tight due dates. Analysis of different dispatching rules shows the relative performance remains unchanged by the presence of different order release mechanisms. Comparisons of internally and externally set due date mechanisms indicate simpler, non‐due date oriented heuristics demonstrate as good a performance as the more complex due date oriented heuristics when shop information is utilized to assign job due dates. Finally, results indicate that in a manufacturing cell, the use of shop floor information is effective for due date assignment, but is not worthwhile for order releasing.

Measuring the impact of part‐time workers in service organizations

Journal of Operations Management 1990
In the last twenty years we have seen a significant increase in interest by practicing managers and academic researchers in the labor/staff scheduling decision. In particular, service firm managers have focused their attention on improving the productivity of their labor intensive operations by an increased use of part‐time personnel. These actions have been motivated by the presence of significant variations in hourly and daily work loads faced by these firms and the desire to provide flexibility to adequately match staff capacity with customer demand. The past employment practice of using full‐time staff causes significant idle capacity to exist in many firms, reducing productivity. The significant increased use of part‐time staff has allowed today's managers to correct this situation by reducing the amount of idle labor capacity, thus reducing operating cost. Academic researchers have also investigated the labor scheduling problem during the past two decades. They have analyzed and evaluated mathematical algorithms, optimal and heuristic, to efficiently solve the staff tour scheduling problem. Some of this work has eventually found applicability in a number of service firms. However, most of these studies have focused on the scheduling of full‐time staff to meet varying daily and hourly work load shifts and little insight has been attained in understanding a number of trade‐off issues in this area. In this paper we investigate the complex issue of the trade‐off between full‐time and part‐time staff and develop a relative “measure of flexibility” for using part‐time individuals. First, we demonstrate, as might be expected, how greater flexibility reduces idle labor capacity. Second, we define and test what is “scheduling flexibility,” as measured by work‐hours‐per‐day and work‐days‐per‐week. Third, we document the marginal reduction in labor hours scheduled attainable with increased flexibility, using actual operating data from a lockbox department in a large Chicago commercial bank. And fourth, we demonstrate the cost implications of using part‐time staff by employing operating data from the wire transfer department of a New York commercial bank, where we examine the problem using cost data as a basis for comparing the relative impact of various labor scheduling decisions and flexibility. We illustrate the common trade‐offs that must be evaluated due to various labor costs, turnover rates, full and part‐time personnel hours and differing productivity rates among various categories of personnel. Our approach illustrates the type of analysis that should be conducted by practicing managers to adequately evaluate the trade‐offs for the staffing decision when using both full and part‐time personnel.

The effect of inventory decisions and parameters on the opportunity cost of capital

Journal of Operations Management 1990
Inventory costs are typically calculated by adding the out‐of‐pocket cost of holding inventory and the opportunity cost of capital tied up in inventory. The concept of opportunity cost of capital is based on the business risk of the firm associated with particular decisions. Most firms use a fixed opportunity cost of capital; an assumption also made by most production and inventory models. In other words, it is assumed that the production and inventory decisions do not affect the business risk of the firm. But, this assumption may be inappropriate given that the competitive environment in most industries has altered significantly in the last decade. This is evidenced in the popularity of just‐in‐time manufacturing systems, concerns for justification of new manufacturing technologies such as flexible manufacturing systems and robotics, and efforts to reduce inventory and setup costs. All of these catalysts for becoming more competitive have one thing in common—they alter the business risk of the firm significantly. Hence, in adopting, implementing and sustaining any of these, it seems appropriate that the change in the business risk is reflected by varying the opportunity cost of capital. This paper uses a simple single product inventory model to present a conceptual framework to show how various inventory parameters and decisions affect the firm's business risk, and hence the firm's opportunity cost of capital. The inventory parameters considered are setup cost, out‐of‐pocket inventory holding cost, replenishment lead time, standard deviation of demand, and correlation of demand with the stock market. The decision parameters considered are lot size and safety stock decisions of the firm. The framework also discusses how this interdependency can be incorporated in the decision‐making process. This paper applies existing finance theory to inventory problems to develop some new insights and discuss possible applications of these insights. Our analysis has three main results. First, the business risk, and hence the opportunity cost of capital for inventory investments, is an increasing function of setup cost, replenishment lead time, out‐of‐pocket inventory holding cost, standard deviation of demand, and the correlation of demand with the stock market. Second, the opportunity cost of capital is a decreasing function of variable profit per unit (selling price minus variable costs). Third, lot size reductions can increase the business risk of the firm, and hence, the opportunity cost of capital, unless accompanied by a simultaneous decrease in the setup cost. The above mentioned results have a number of interesting implications in the current manufacturing environments where firms are changing their cost accounting systems, developing new ways to measure performance, and developing better ways to evaluate investments in new technologies. First, our results suggest that inventory of products with high lead times and high setup costs should be charged a higher opportunity cost of capital. This would not only lead to a more accurate estimate of the cost of producing different products but also provide managers with incentives to reduce lead times and setup costs. Second, lower inventory levels reduce the business risk of the firm, and hence the opportunity cost of capital. Thus, investments in new manufacturing technologies that help reduce inventories should be evaluated using a lower discount rate. Third, reducing lot size while ignoring the lot size economics, can actually increase the business risk of the firm. This suggests that firms should not unilaterally reduce lot sizes, but should simultaneously seek to decrease lot sizes and setup costs. This will reduce the business risk of the firm. Fourth, our analysis indicates that another benefit of just‐in‐time (JIT) manufacturing philosophy is that it lowers the business risk of the firm. This is an important implication for JIT because firms with low business risk are less likely to be adversely affected by recessions than firms with high business risk. Fifth, since lower lead time reduces the business risk of the firm, investments that reduce lead time, as well as evaluation of decisions on sourcing, should incorporate the benefits of reduced business risk. Similarly, a supplier's marketing strategy should emphasize the benefits of lower business risk for customers due to its lower lead time. Finally, many researchers claim that inventory holding cost is understated as the implicit costs of holding inventory are often difficult to assess. Our analysis shows why inventory holding costs may be mis‐estimated.

Coping with the build‐to‐forecast environment

Journal of Operations Management 1990
High‐value‐added manufacturing companies today confront a competitive trend toward greater product customization in the face of reduced response times. This scenario is encountered most often in industries like machine tools, heavy construction equipment, heavy manufacturing in general and computer software and hardware. The product is highly customized, yet competition requires manufacturers to deliver it with lead times significantly shorter than the manufacturing lead time. Generally, the scheduling practice here is to release the manufacturing order before the customer order is released and subsequently match incoming customer orders to units in progress. This is referred to as the “build‐to‐forecast” (BTF) approach. This study investigated the coping mechanisms used by manufacturing firms to alleviate this dilemma. The tactics vary with the firm's business strategy, its operating environment, and its capabilities. We report on three case studies from firms building heavy machinery. The firms are similar in terms of the range of final product values, build times, customer delivery times and the very large number of components. Also, their operations require the use of a variety of flexible and dedicated resources. Flexibility in manufacturing processes, modular bills of materials, subcontracting and expediting are some of the approaches that these firms use to help resolve the double bind of short lead times and high levels of customization. We review some of the operational problems peculiar to the build‐to‐forecast environment and suggest alternative approaches for dealing with them. The coping mechanisms are grouped according to the manner by which they help relieve the BTF problem's severity. One set of mechanisms makes the problem less complex by simplifying products or the production process. Another set reduces the risks due to uncertainty in demand or supply. The third set provides engineering and manufacturing slack. While some or all of the mechanisms are used by the manufacturing firms studied, the predominance of particular mechanisms in each firm is explained by a contingency model developed in this paper. The case studies provide useful insights into the nature of the problem and how the firm's organizational environment often dictates the choice of mechanisms used to alleviate it. For example, these firms minimized their scheduling dilemmas with modular product designs, flexible processes, informal organization structures, or formal control mechanisms for limiting customization. We conclude by framing a number of research questions whose solutions would help such firms better manage their operations.

Evaluating mixed‐model assembly line sequencing heuristics for just‐in‐time production systems

Journal of Operations Management 1990
When mixed‐model assembly lines use components fabricated in‐house, the demand for these components is not uniform over time and is affected by the sequence of models on the assembly line. Thus, without proper mixed‐model sequencing and the subsequent smoothing of component demand, the effectiveness of a just‐in‐time (JIT) production system is limited. This paper focuses on making component usage uniform. Five sequencing methods are reviewed, two suggested by Monden (1983) and used at Toyota (GC1 and GC2), and three proposed by Miltenburg (1989) (M‐A1, MA3H1, and M‐A3H2). Their performance is evaluated for the special case when all models use the same components. For all of the sequencing methods tested the mean absolute deviation of model usage varies directly with the number of models produced. There is no clear relationship between the mean absolute deviation of model usage and demand pattern or length of production sequence. Method M‐A3H2 produces the highest quality feasible solutions under all conditions tested. The relative performance of the methods does not appear to be related to the number of models, demand type, or length of production sequence. To compare methods for the more general case of different models requiring different components, a mixed integer programming (MIP) model is presented as a way to find an optimal sequence. The M1P creates optimal solutions but is too slow to be used in practice. The two goal chasing heuristics used by Toyota were considered on the basis of their ability to schedule production to use components linearly over time. It is shown that these methods differ widely in their ability to generate good sequences. The performance of both is best when the products assembled have simple product structures. When models require more than one of a given component or when models require many different components, the performance worsens. The difference in performance is very small for GC1, but significant for GC2.

Push and pull in manufacturing and distribution systems

Journal of Operations Management 1990
The terms “push” and “pull” have been used to describe a wide variety of manufacturing and distribution environments. To some, the distinction refers to a specific attribute which can be identified by observing the mechanisms for controlling material flow on the factory floor. To others push and pull can be defined in terms of a specific policy for the management of inventories and production schedules. Finally there are skeptics who maintain that the push/pull dichotomy is a fiction created by academics or unscrupulous consultants to promote their latest theories or systems. In this paper, we review the various definitions of push and pull in operations literature. It is clear from this review that the attributes which distinguish pull systems from push systems are not well understood. The purpose of this paper is twofold. First, we clarify the meaning of push and pull in manufacturing and distribution systems. This clarification gives rise to a framework for push and pull that can serve as a classification scheme for material control systems. While we do not claim that our framework sufficiently classifies all material control systems, we demonstrate its application to a number of common systems. Thus, this framework can be used to analyze and compare management procedures for different classes of material control policies (such as MRP, kanban, base stock). This analysis is particularly useful to designers of material control systems, as well as those doing empirical research, who need to consider in depth various aspects of material control. Second, we intend to stimulate research efforts by the use of our framework. We demonstrate one such use of the framework by introducing a model of a particular integrated production‐distribution system. Our model represents a simple, three‐location, production‐distribution system with multiple products. We develop a system that is predominantly pull, and several systems with varying degrees of push. In the particular example we discuss, our pull system provides lower costs and higher service levels than the push systems. In developing our framework, we analyze material flow decisions in terms of four related decisions that can be used to distinguish push systems from pull systems: 1) batch size, 2) timing of a production or shipment request, 3) setting dispatch or allocation rules, and 4) the presence of interference mechanisms for expediting or handling of emergency orders. The first two decisions are primarily concerned with individual products or parts. The second two decisions introduce the added complexity of multiple products, locations and customers. For each decision, we examine the authority for the decision and the information content used in making the decision. We shall see that it is not possible or useful to label a manufacturing system as being entirely push or entirely pull. We argue that push and pull are characteristics of the underlying decision‐making process; and hence manufacturing control systems, which embody a collection of decisions, will contain elements of push or pull to varying degrees. Nevertheless, certain systems, containing such diverse elements often give the impression that they are predominantly one or the other. Our extended definitions provide a more complete picture that can be useful to researchers engaged in empirical work, as well as to managers concerned with system design. The paper is organized as follows: following an introduction and a review of various definitions of push and pull, we describe integrated production‐distribution systems. In the next section we present our framework for defining push and pull systems. Throughout this section we refer to commonly used planning and control systems, such as MRP, kanban, DRP, fair shares, and OPT. We then introduce a model that can be used to compare different material control systems. Finally, we present a summary and conclusions.

Enhancing the customer contact model

Journal of Operations Management 1990
Most services are provided in the presence of the customer. In most service operations, the customer is not only present but also directly participates in the service delivery process. Such encounters with the service system and the customer's involvement in the service production process have important implications for operations efficiency and effectiveness. Thus, the nature and extent of contact between the customer and the service system should be carefully evaluated in designing service facilities. One approach that has been considered a useful conceptual tool for aiding operations managers in their service design decisions is the customer contact model (CCM). This model classifies service systems into “high contact,” “low contact” and “mixed” services based on the extent of contact between the customer and the service facility. Recently, however, this model's effectiveness as a service management tool has been challenged. CCM has been criticized for failing to sufficiently distinguish between service systems that involve high interaction and customization and those that primarily provide accommodation. The model's capability to assess a service facility's potential efficiency has also been questioned. This paper reevaluates CCM in view of the recent concerns raised about it and offers some extensions which improve the model's performance. It proposes a broadened definition of “customer contact” and differentiates between “active” and “passive” contact. Based on these distinctions, it presents a revised approach for classifying services and for assessing the potential efficiency of service facilities. The extensions provided in this paper would help overcome many of CCM's shortcomings and thus enhance its potential as a viable tool for managing service operations. Therefore, this study, while recognizing the valid criticisms leveled at CCM, asserts that the customer contact concept still provides a useful framework for understanding, designing and controlling service systems.