A note on workload‐dependent due date assignment rules
For many production systems, delivery performance relative to promised job due dates is a critical evaluation criterion. Delivery performance is affected by the way in which work is dispatched on the shop floor, and also by the way the job due dates are assigned to begin with. This pape shows how information regarding congestion levels on the shop floor can be used to assign due dates to arriving jobs in such a way that the mean tardiness of jobs is decreased without increasing the average length of the promised delivery lead times. Baker and Bertrand suggested a modification of the Total Work (TWK) rule for assigning job due dates which adjusts the job flow allowance according to the level of congestion in the shop. Their method gives longer flow allowances to jobs which arrive when the system is congested. Although their modified TWK rule results in lower mean tardiness in many settings, it also generally results in a higher proportion of jobs tardy. This paper presents an alternative modification of the TWK rule which, in most cases, provides mean tardiness as low as or lower than Baker and Bertrand's rule and also results in a lower proportion of jobs tardy. The alternative rule suggested here still results in higher proportion of tardy jobs than the non‐workload adjusted rule in most settings, but suggestions are made for how this problem might be addressed.
MRP strategies: Effects on cash flow
As material requirements planning systems do not consider capacity limitations in their inherent logic, considerable effort must be spent to achieve feasible production plans. This simulation study examines the cash flow consequences of nine production planning strategies consisting of three master production scheduling methods and three component/part scheduling methods. Experimentation examines different operational cost ratios. Evaluation criteria used are characterized by total cash flow and periodic variablity of cash flow to support operating expenses for each planning strategy. Simulation results indicate that sophisticated methods for planning do not necessarily cause significant savings. A second finding is that a smoother master production schedule tends to result in more stable cash outflow patterns. In comparison, component scheduling efforts are found to have relatively insignificant consequences when compared to the effects of master production schedules.
Economic analysis of flexible manufacturing systems
An empirical study of buyer/seller relationships in U.S. manufacturing firms
A note on solving the concave cost dynamic lot‐sizing problem in almost linear time
The heavily‐debated Wagner‐Whitin algorithm is known to produce optimal ordering policies for minimal‐cost dynamic lot‐sizing problems. In an earlier paper in this journal, Evans showed that the Wagner‐Whitin algorithm is essentially a shortest path computation on an acyclic network, and presented a simple O(n 2 ) computer implementation with low storage requirements. As an extension, in this paper we present a very fast microcomputer implementation of the algorithm for the case of concave procurement cost structures. Our extensive computational results show that for this cost structure, the algorithm will solve problems in linear time. A quasi‐theoretical argument is given to explain this behavior under the assumption that data are randomly distributed.
A note on “Stochastic unpaced line design: Review and further experimental results”
Executive Summary A 1985 study in this journal examined the “bowl phenomenon” and claimed to demonstrate that Hillier and Boling's original results 1967 were due to an assumption of unrealistically large variations in processing times. A closer look at these findings reveals that they are derived from a flawed experiment that cannot possibly serve to verify whether or not average task times at work stations on an assembly line should be selected in a bowl distribution. We offer further arguments in clarification of Hillier and Boling's original work based both on our own simulation experiments as well as recent studies by other authors. We also comment on the need to orient future efforts toward practical integration of the bowl phenomenon result with other findings that relate to improving the throughput of unpaced assembly lines.
Manufacturing strategy: A selected bibliography
Tooling constraints and shop floor scheduling: A simulation study
Research into the problems of job shop scheduling has dealt with two of three major categories of shop floor resources: machine capacity and labor. Generally ignored has been the impact of tooling constraints, the third form of shop floor resource, on the scheduling process. The impact of tooling is the focus of this study. Using a simple simulation model of a shop operating under varying levels of tooling availability, it is shown that the level of tooling availability has a significant impact on shop floor performance as measured in terms of mean flow time, mean tardiness, number jobs tardy and number of tool changes. Four different tooling assignment rules are evaluated and their effect on system performance is described. The results indicate that tooling assignment rules should consider both job priorities and tooling availability in order to achieve good shop performance. The paper concludes with general recommendations for the management of shop orders facing limited tooling availability.
Improved hierarchical production planning
This article addresses an overview of development and application of an integrated production planning model within the fiberglas industry. The system described represents a second generation in the development cycle of hierarchically based models within this batch production industry. A number of salient issues that distinguish this modeling approach from previous ones are examined. Our contention is that the explicit treatment and integration of demand forecasts within the context of production planning models is a necessary condition for implementation and ongoing use of such systems. Further, due to the nature of practical disaggregate problems, oft cited linear programming (LP) models will be set aside by more flexible goal programming solutions that explicitly recognize the dynamics of variations in product mix, production rates and management objectives. Finally, the development, delivery and maintenance of these planning models will increasingly be performed on microcomputer‐based systems and software versus traditional mainframes.