Numerous heuristics have been proposed in the past two decades for the dynamic lot sizing problem, many of them in APICS journals. Their relative performance is explored in extensive numerical tests measuring expected costs, risks of higher than expected costs and computer time consumed. The results indicate that users of pertinent standard software systems could benefit substantially from an incorporation of more recently proposed methods, specifically Groff's (1979) stop rule and a fathoming algorithm expanding it to a look‐ahead heuristic.
In most inventory models, lead time is an insignificant factor in inventory modeling and implementation. There are situations, however, in private industry and governmental procurement in which this is not the case. For example, orders for castings and forgings with a low order size may have lead times of from 12 to 36 months. The actual lead time is random and depends on economic factors that determine the load at the foundry. A model developed by Liberatore in 1977 [1] was the first approach to incorporate random lead time and yet had a feasible solution approach for a multi‐period problem. However, this approach requires significant development time for implementation on a digital computer by a technically skilled analyst. Our sensitivity analysis of this model indicates that a solution of the model for every specific case may not be necessary. In fact, some heuristic policies are revealed that offer a manager a finite set of alternatives to consider with some assurance that the policy selected will be close to optimum. Our conclusions are: 1) Consider 1,2 or 3 orders per year with the order sizes roughly equal. 2) The time of the first order should be approximately E (lead time) + 1.25σ LT prior to the first demand point. 3) Large increases in σ LT will not affect these policies.
This report examines the practice of using work load limits to control the release of orders to a job shop. Load limits function in the following general way. Whenever the inventory of work at a work center exceeds some critical value (its “load limit”), further release of orders which are routed to that work center are blocked from entering the shop. After the inventory is “worked off,” release of work to the shop gateways is again permitted. Load‐limited order release is intuitively appealing because it appears to be a method for reducing system inventory and flow times. The practice of load limiting order release is becoming popularized by some of the recent production planning software products now on the market. A notable example is OPT. In this report, analytical results for an M/M/1 queueing model, along with existing simulation studies of multi‐machine job shops are interpreted to form a theory about the effects of using load limits. The major finding here is the proposition that system flow time, inventory, and order tardiness all deteriorate to the extent that load limits introduce idle time into the schedule. Based on the arguments presented here, a very cautious approach toward the use of input control schemes for anywhere but gateway work centers would be advised. The conclusions drawn here are to a great extent arrived at by interpreting the research results of others, so there is a clear need for further research which tests these assertions in a more direct and controlled way.
As more companies recognize the importance of quality to their long‐term survival they are, among other actions, attempting to formulate sourcing strategies that are consistent with their quality strategies and policies. The two major sourcing strategy options available are multiple and single sourcing. Unfortunately, the literature has lagged behind the practitioner's needs for direction in this area and, therefore, provides little help to managers wrestling with this important and difficult issue. This study uses a risk/benefit approach to carefully examine sourcing strategies from the perspective of the purchaser, or vendee. To ensure a complete and accurate identification and description of the various factors which influence sourcing decisions, intensive interviews were conducted with purchasing and quality personnel at the Manager and Director levels within a number of large, international organizations. Most of the interview data was collected at Control Data, General Mills, Honeywell, Pillsbury, and Unisys. This data was supplemented with information from managers at other companies and the literature which exists in this area. The paper begins by describing the various definitions of single sourcing and the definition which is used for the purposes of this paper. Next, the factors which should influence managers' sourcing decisions are identified and classified into five risk/benefit categories. These categories are then incorporated into a conceptual risk/benefit assessment model for managers to use in the evaluation of their sourcing strategy. The conceptual model is an adaptation of the additive rating model used for facility location decisions [1]. It is suggested that the model would most appropriately be applied at the family of parts level. Application at this level would likely result in different sourcing strategies for different part families (and different organizations), depending on the characteristics of each family. This is consistent with the conclusions of Hahn, Kim and Kim [10]. This work contributes to the literature in several ways. The first of these contributions is the complete definition of the various levels of single sourcing. Compilation of the many factors associated with both single and multiple sourcing decisions is another contribution. Prior to this research, the identification of these factors had been incomplete, limited to single sourcing, fragmented across a number of articles, and disseminated largely by word of mouth. The construction of a framework within which these factors can be categorized is also new to the literature. The final contribution of this research is the development of a conceptual model to analyze the combined effects of these factors.
The semiautomatic nature of machinery often makes it economical to assign more than one machine to a single operator in a cyclic schedule. If the tasks, executed in a cyclic schedule, are not ordered properly, excessive interference can occur, even in deterministic problems. In a recent article [1], Aronson presented two efficient and effective heuristics for solving a more realistic generalization of the deterministic cyclic scheduling problem—one that has a single operator, multiple nonidentical machines, and multiple nonidentical runs on each machine. Here, the author supplies a natural strategy for initializing the first heuristic, because it is not satisfactory to run the heuristic many times, each time starting with a first run of a different machine, to obtain a reasonable solution. This modification is necessary to improve the performance of the heuristic, for ease of implementation, and savings of computational effort. An example problem is presented to compare the solution found using the heuristic with the new starting strategy to that of the heuristic using the original, random selection strategy. The solution found is optimal, whereas the original version of the heuristic obtained a solution within 8.1% of optimality. The new, natural starting strategy for the heuristic should improve its ability to solve problems with a single execution, and simplify its implementation on mainframes, minicomputers, and microcomputers. Increased use of the techniques outlined here should lead to a higher utilization of labor and machinery on the production floor.
This note disputes several observations made by James R. Evans' article, “An Efficient Implementation of the Wagner‐Whitin (WW) Algorithm for Dynamic Lot‐Sizing,” Journal of Operations Management , Vol. 5, No. 2, February 1985. By testing the algorithm within a micro‐based manufacturing resource planning (MRP) system, the writer of this note shows that WW is still computationally burdensome compared to heuristic methods, particularly within the context of a micro‐based MRP system implementation.
Lot sizes that cover material requirements for more than two periods' demand have a built‐in service level impact. The lot sizes act as a buffer for variations in demand for every period (week) but the last. However, procedures for including the service level effect of the lot size in the lot‐sizing decision have not been developed. This article develops a very simple but robust mathematical model for computing the service level guaranteed by any lot size, Q, in both continuous and lumpy demand contexts. The model turns out to be a very simple mathematical expression involving the lot size, Q, the number of periods of demand covered by the lot size, n, and the standard deviation of the demand, σ. Some purely mathematical evaluations of the model were undertaken, and were found to predict both the direction of change of the service level as a function of Q and σ and the limit of the service level very well. A simulation experiment was also designed to test how well the model predicted the service level generated by the lot size, Q. The value of Q was set at the beginning of each experiment; the parameters of demand distribution were denned a priori. The simulations involved setting the lot size, Q, randomly generating individual demands from the known distribution, and recording the impact on the inventory and service levels. The results show that the model's prediction of the service level generated by any given lot size, Q, was very precise and reliable. The performance of the model was excellent even for cases where demand variability, as measured by the standard deviation, was high. Moreover, the built‐in service level of lot sizes turned out to be high, ranging from 95% to 100%. The ability to do a reasonably precise, a priori computation of the service level generated by a lot size, Q, has fundamental ramifications for production and materials management. One of these ramifications is the ability to size safety stocks to increase the service level from that generated by the lot size to the target sought by management. The article demonstrates that the safety stock will be smaller if the built‐in service level of the lot size is factored in. The conclusion is that lot‐sizing decisions cannot be divorced from safety stock computations, as has been done traditionally in theory and practice. Moreover, the choice of a lot‐sizing approach must consider the service level objectives of the company.
The manufacturer's ability to respond quickly and with great flexibility is crucial. The future belongs to the manufacturer of high tech, high‐value products who can compress not only component and assembly process times, but design and tooling cycles as well. Master production scheduling provides a road map for production requirements. This article reports the results of a simulation study that compares alternative procedures for determining master production scheduling (MPS) techniques utilizing the superbill and covering set MPS. The performance criterion for the study is the available‐to‐promise (ATP) lead time (customer service). The results of the simulation experiment support the superiority of the superbill technique over the covering set technique in terms of customer service. The penalty associated with using the more efficient covering set technique as an alternative to the well known superbill technique is a significant decline in customer service. However, covering sets have computational advantages that must be considered, especially when the MPS procedures have to be repeated routinely. Finally areas for future research are suggested. It is especially important that a trade‐off between the customer service and manufacturing flexibility be investigated.
Manufacturing overhead cost (MOHC) in an average U.S. manufacturing firm is about two and one half times the direct labor cost, yet it has not received much attention from researchers; it is practically a neglected area of research. In the competitive scenario of the 1980s, the need for understanding and controlling any and all costs including MOHCs is greater than ever before. In an attempt to understand and explain MOHC behavior, this study proposes a conceptual model of MOHCs and validates the model with field data collected as part of the 1983 North American Futures Survey of the Manufacturing Roundtable, School of Management, Boston University, Boston. The model visualizes MOHC to be a function of a hierarchy of variables. In the proposed hierarchy, industry type is the most important determinant of MOHC followed by order‐filling method (i.e., make‐to‐stock, make‐to‐order and assemble‐to‐order), strategy variables, and operational variables, in that order. The higher the level of the variable, the greater its impact on MOHCs. To validate the model, four propositions concerning MOHCs derived from the model were subjected to statistical tests using the data collected from hundreds of manufacturers who participated in the 1983 North American Futures Survey. In the process of conducting the survey, a questionnaire was sent to senior manufacturing executives from 1100 large manufacturing firms in the U.S., Canada, and Mexico including all firms in the Fortune 500 listing of industrial firms. A total of 209 responses was usable. The average 1982 sales of the responding business units was $751 million. As hypothesized in the model the findings showed that the higher level industry type variable so profoundly influenced MOHCs that it overshadowed the influence of all lower level variables. Among the five industry groups studied (namely, basic, consumer products, industrial, machinery, and electronics), there was a tendency among the industries to form low or high MOHC clusters. Basic and consumer industry groups were part of a low‐cost cluster and the rest were part of a high‐cost cluster. The MOHC in industries in the high‐cost cluster was nearly 50% more than the MOHC in the industries forming the low‐cost cluster. An important finding of this study was that several strategy‐related variables were associated with MOHCs. For example, firms showing a high rate of sales growth and those emphasizing a strategy of dependable delivery to customers were associated with relatively high MOHCs. This study also showed that whereas the MOHC in the electronics industry was most sensitive to strategic decisions, the MOHC in the machinery industry was least sensitive to strategic decisions. Given the state of our understanding, it is unclear why some industries are more sensitive to strategic decisions than others. In the interest of MOHC control, practitioners in all industries should watch for the effect of strategic decisions, if any, on MOHCs and look for ways to control the adverse effects of strategic decisions on MOHCs. More studies are needed to identify the factors that make certain industries relatively more sensitive to selected strategic decisions.
This article explores the issue of commonality of processes. While the benefits of high process commonality (similarity of processes) are generally recognized, this research represents the first clear identification of the sources, development of measurements, and discussion of the managerial implications of process commonality. The first section of the article identifies and categorizes the sources of process commonality. These categories are: low set‐up times, flexibility to change from one operation to another, and flexibility in making expedite decisions‐ Indices are developed in the second section for each of these three categories at the work center level. These indices are examined using sensitivity analysis and are found to respond appropriately to changes in parameters. Formulation of a composite index is also discussed. The final section discusses the managerial implications of process commonality at the strategic, tactical, and operational levels. The impact of improved process commonality covers a wide range of decisions, including product/process selection, production/inventory control system selection, and definition of group technology cells, among others.