Knowledge that Transforms
To make high-quality research more accessible and easier to explore.
Fields:
1801 results
✕ Clear filters
Monitoring and improving the productivity of semi‐autonomous human service units
Multiplant MRP
Many manufacturing firms have multiple manufacturing plants, located in geographically diverse parts of the world. This situation is becoming more common, as firms establish new plants in foreign countries to take advantage of low labor cost. In such cases, it is not unusual for the firm to retain production capability of certain key parts in a backup plant, with the necessary equipment and trained workforce in place. High volume production could be obtained relatively quickly from the backup plant in case of an emergency at the main supplying plant. In such multiplant settings, the transportation costs are significant. Throughout this paper, we use the term “multisourced parts” to describe parts produced in more than one location. Material Requirements Planning (MRP) is the component of a total manufacturing control system that is designed to manage inventory and plan orders for parts and material with dependent demand (demand derived from the demand of other items). Most of the literature on MRP systems discusses MRP methodology in a single‐plant environment. Most MRP software systems in use today are single‐plant systems. Currently, it is common for firms with multiple plants treated as cost centers to use an independent single‐plant MRP system for each and handle the transshipment problems manually. Because of lack of coordination of production schedules between supplying and demanding plants, those firms hold more inventory and experience longer lead times than necessary to compensate for uncertainties in schedules and supply policies. The purpose of this article is to enhance single‐plant MRP systems for coping with multiplant situations in which: the plants are regarded as cost centers, there exist multisourced parts, and the transportation costs are significant. The multiplant MRP system should recognize that parts are produced in different plants, make offset calculations for in‐transit lead times, and consider transportation costs when establishing production requirements and shipping routes for multisourced parts. The objective is, beginning with the corporate‐determined master schedule for finished products, to communicate in one planning cycle time‐phased planned order release schedules and shipping/delivery schedules to each manufacturing plant producing components for the finished products. We first present a simplified framework for the multiplant MRP system, where a transportation algorithm is incorporated into the MRP logic. Then we refine this simplified framework to handle more complex aspects of a multiplant network. These complexities include the treatment of requirements that are not shipped on time and the regeneration of new MRP schedules. We also observe that the solution to the transportation problem described above is affected by the lot‐sizing rules employed. In addition, we discuss several important issues and decisions that confront a firm when implementing a multiplant MRP system.
Capturing judgments to clarify production strategy and policy
Recent years have brought a reawakening of the importance of shaping the operations function to support the broader strategy of each organization. Doing so, however, can be a complex, controversial, and highly subjective matter. Determining production's relationships to marketing, engineering, and finance requires executive‐level judgments on the relative emphases among these policy areas. Other judgments about internal capabilities, external factors, and production policies are also involved. Assessing these relationships is a subjective process that is often subtle and usually hidden. For managers, these judgmental areas are sources of disagreement, confusion, and controversy in policy determination. Within this context, the authors applied a judgment‐capturing process, called ProPol ( Production Policy ), to reveal and clarify managers' judgmental processes. The procedure uses correlational methods to identify where and how managers diverge from a common policy focus. The application settings were two executive development programs—one in manufacturing and the other in the public utility industry. Grouped into teams, the executives competed in week‐long computer simulation games. ProPol was introduced to assist in clarifying their production policies and strategies. In the manufacturing setting, five general policy areas—marketing effort, cost efficiency of production, R&D effort, product pricing, and service flexibility—were identified as salient variables prior to the simulation. We sought to reveal managers' subjective views on the appropriate balance among these variables. The variables were scaled and embedded within questionnaires to present alternative strategy and policy postures within the context of the simulated organizations. From analyzing the resulting judgments, ProPol served the following purposes: (1) to reveal to each manager his own decision structure; (2) to permit intermanager comparisons of decision structures among team members; (3) to provide explicit bases for focused discussions on overall strategy agreement/disagreement within teams; and (4) to serve as the basis for determining a consensus strategy by each team. The managers' judgment processes were compared in terms of judgmental consistency, complexity, and espoused versus in‐use importances of the policy variables. Consistency, the amount of uniformity in the manager's decision structure, varied widely among team members and across teams. While some executives held firm, consistent views of policy‐outcome relationships, others applied their structure inconsistently or shifted from one relationship structure to another in making their judgments. Judgmental complexity also varied widely within and across teams. The judgmental structures for most managers were simple linear relationships. Several, however, used more complex quadratic and interactive structures in relating the policy areas to overall effectiveness. Even when individuals were identically complex, however, they differed as to which policy variables were significant. Furthermore, although every manager espoused that all five variables were important, they were not all significantly used. The discovery of these discrepancies had a surprise affect: managers became aware of their personal inconsistencies and were stimulated toward understanding why they occurred. The group judgments, in contrast to the individuals, were more consistent and the espoused versus empirically‐derived importances were more in agreement. This occurred from group interactions following individual feedback. The feedback clarified specific areas of policy agreement, provided a productive way for resolving basic policy differences, and facilitated the groups in clarifying their strategic directions. In the utility environment, executives participated in a decision‐making simulation of a consumer‐owned electric utility. As before, five key policy variables for this industry were chosen. Some of the five policy variables are indirectly related to operations (e.g., rate setting and employee relations), while others are more specifically related to operations (e.g., cost efficiency, dependability, and flexibility). Analyses of the judgments revealed characteristics similar to those in the manufacturing environment. Overall, however, utility executives displayed somewhat more complex judgment structures than did manufacturing executives. As a result, there seemed to be more common ground for intrateam policy agreement. For eight of the nine teams, the group consistency exceeded the average of their members' individual consistencies. Otherwise the various teams displayed diverse functional forms for their strategy and policy judgments, and they were relatively consistent in doing so. These results indicate that ProPol can help managers clarify specific directions for the production function. By doing so, a more focused production thrust, one that is clearly and explicitly articulated, will enhance any organization's competitive strategy and provide clear guidance for subsequent decisions.
Materials management: The key is people management (five brief case histories)
This article outlines the basic functions of materials management and then comments on the state of affairs as currently experienced by companies around the world. It also points out that the findings of past research have not been very helpful to the practicing managers. Nearly 80% of the companies remain frustrated with problems in their materials flow systems in spite of their concentrated efforts and huge expenditures on consultants, employee training, and computers and software. The author of this article puts forth a hypothesis that “All the problems of materials management have their roots in management of people.” He attempts to prove this hypothesis with the help of five case studies in which he has participated himself as a consultant. A brief description of each of these is provided, and certain descriptive analyses and arguments are presented to indicate that in every case, the root cause of failure of the materials management function could be attributed directly to loose discipline, poor employee training, ineffective reward systems, lower caliber of personnel, bad habits, misdirected motivations, or negative attitude of employees in general. The first case illustrates an irresponsible behavior of an outgoing plant manager that led to many headaches and serious problems related to materials. The succeeding plant manager had to deal with a real mess that could have been avoided had the outgoing plant manager or the top management of the company handled the situation in an intelligent, scientific, and disciplined way. The second case study is about an intelligent, aggressive, but dishonest pharmacist who used the sanctity of the garb of a medical man to cheat his hospital of substantial sums of money. He did not even hesitate in stealing costly, illegal drugs from the pharmacy for which he was supposed to be the protector and caretaker. He brilliantly succeeded in finding certain suppliers who joined hands with him and shared the booty. He could do all this because he succeeded in hiring the weak and the incompetent staff and because he could hide his real self by maintaining meticulous inventory records on paper. The third situation involved a large hotel's nutritionist, again an intelligent, aggressive, and ambitious person but a believer in personal gains no matter through what means. This person used the well‐respected technique of forecasting and the related forecast errors to his advantage. He hired only the meek, inexperienced, and marginal personnel to look after the flow of materials. Using a front of an excellent analyst and efficient manager, he was actually taking kickbacks from the raw food suppliers. The fourth company used a highly sophisticated software package for managing its purchase, storage, and inventory control functions, but the employees utilizing this package were not following any of the prescribed procedures and disciplined approaches required for continually updating the computer memory records. The bad habits of employees were causing all the materials management problems one could imagine. The fifth case study deals with a small company. This company was trying to use a highly complex and sophisticated software package for managing materials. The employees working with this package did not understand the logic behind the computer‐generated reports; for them it was a black box. They constantly disagreed with the action items and recommendations of the computergenerated reports. It was a total mess. After a great deal of hassle, the automated materials control system was replaced with a simple, transparent, easily understood “Kardex” system, and soon after most of the problems disappeared. In conclusion, we can emphatically say that it is the people (employees), their understanding of the methods, procedures, and installed systems, and their sincerity and motivation that make or break a materials management system. So far, as top management is concerned, the system (irrespective of its complexity and sophistication) is only a tool and in no way a remedy. Only the people can make it work and provide the desired results.
On “Currently Practiced Formulations of the Assembly Line Balance Problem”
A polynomial goal programming approach to a class of quality control problems
The traditional quality control approach based on statistical tools has been very useful and effective when output and input qualities can be denned in terms of a single characteristic. However, in process industries such as paper, the output quality is denned in terms of two or more distinct characteristics; hence, reducing the deviation of one output characteristic from its permissible limits could result in forcing other output and/or input characteristics to deviate from their respective limits. Compounding this phenomenon is the fact that most of these industries produce substantial amounts of pollutants whose characteristics are a function of the input and output characteristics. Thus, with increasing costs of waste treatment and stringent pollution standards, there arises a notion of a trade‐off between attaining market specified output characteristics and meeting federally regulated pollution standards. In this article a general process quality control problem has been formulated that reflects the above trade‐off both in terms of a linear and a polynomial goal programming problem. Major advantages and differences between the two formulations are highlighted and illustrated with a practical example drawn from the paper industry. Three separate cases each with different priorities assigned to the output, pollutant and input characteristics are developed and solved under both formulations. Based on the analysis it is observed that the different solutions that result are contingent on the assumptions concerning the priorities associated with each goal and the manner by which one chooses to incorporate tradeoffs between goals in the objective function. Additionally, it is found that the solutions obtained under polynomial goal programming formulation are more conducive for implementation in practical quality control contexts.
Time‐dependent demand in requirements planning: An exploratory assessment of the effects of serially correlated demand sequences on lot‐sizing performa
The problem of determining the appropriate stock replenishment quantity within a time‐phased requirements planning environment has received considerable research attention in recent years. Relative performance characteristics of lot‐sizing policies have been assessed as a function of the cost structure, the demand pattern, the product structure, forecast error, the length of the planning horizon, and the interaction between replenishment quantities and sequencing decisions. In particular, the relationship between lot sizing behavior and variability in the requirements profile has been intensely investigated. However, despite these efforts, the empirical evidence linking lotsizing performance with demand variability remains inconclusive. This article suggests that, in part, some of the ambiguity in the literature may be an artifact of a failure to adequately control for other important dimensions of simulated demand sequences. The features that have been thought to describe “lumpy” requirements profiles are discussed and the characteristic of periodicity or time‐dependency in the demand entries is identified as a variable that has been insufficiently controlled in prior work. A reanalysis of the demand sequences originally published by Kaimann, and subsequently used in a number of comparative lot‐sizing studies, reveals that the patterns differ not only in variability as measured by the coefficient of variation, but also in terms of correlation structure as described by the autocorrelation function. Alternative methods for simulating demand sequences are reviewed and a correlation transfer technique, which has the capability to simultaneously control both the degree of variability and correlation, is suggested as an improved method for the generation of synthetic sequences of “lumpy” demand. Using this technique, five of Kaimann's original sequences are rearranged, resulting in three sets of sequences differing only in the strength of serial correlation. Four lot‐sizing procedures are applied to each of these sets to discern if the correlation structure has any appreciable effect on lot‐sizing performance. Results indicate that, on average, higher total inventory costs are experienced when the demand environment is characterized by randomness. Economic order quantity and part‐period balancing achieve lowest average costs when confronted with highly autocorrelated demand or patterns of few runs; conversely, minimum cost per period and Wagner‐Whitin perform best under conditions of many runs. Both economic order quantity and part‐period balancing perform most favorably in comparison to Wagner‐Whitin when runs are few. In addition, there appears to be a potential interaction between the level of demand variability and the degree of serial correlation. This finding is somewhat disconcerting since high variability demand sequences used in some prior research were also characterized by relatively high levels of autocorrelation; hence it becomes most difficult to identify and decompose the unique influences of each demand pattern dimension on lot‐sizing behavior. Because of this phenomenon, it is suggested that future studies direct greater attention to the demand simulating methodology than has heretofore been accorded.
A heuristic algorithm for capacity sensitive requirements planning
Available lot sizing rules for use in MRP (Material Requirements Planning) systems ignore capacity limitations at various work centers when sizing future orders. Planned order releases are instead determined by the tradeoff only between the item's set up and inventory holding costs. This limitation can cause unanticipated overloads and underloads at the various work centers, along with higher inventories, poorer customer service, and excessive overtime. This research explores one way to make MRP systems more sensitive to capacity limitations at the time of each regeneration run. A relatively simple heuristic algorithm is designed for this purpose. The procedure is applied to those planned order releases that standard MRP logic identifies as mature for release. The lot sizes for a small percentage of these items are increased or decreased so as to have the greatest impact in smoothing capacity requirements at the various work centers in the system. This algorithm for better integrating material requirements plans and capacity requirements plans is tested with a large scale simulator in a variety of manufacturing environments. This simulator has subsequently undergone extensive tests, including its successful validation with actual data at a large plant of major corporations. Simulation results show that the algorithm's modest extension to MRP logic significantly helps overall performance, particularly with customer service. For a wide range of test environments, past due orders were reduced by more than 30% when the algorithm was used. Inventory levels and capacity problems also improved. Not surprisingly, the algorithm helps the most (compared to not using it at all as an MRP enhancement) in environments in which short‐term bottlenecks are most severe. Large lot sizes and tight shop capacities are characteristic of these environments. The algorithm works the best when forecast errors are not excessive and the master schedule is not too “nervous.” This proposed procedure is but one step toward making MRP more capacity sensitive. The widely heralded concept of “closed‐loop” MRP means that inventory analysts must change or “fix up” parts of the computer generated material requirements plan. What has been missing is a tool for identifying the unrealistic parts of the plan. Our algorithm helps formalize this identification process and singles out a few planned order releases each week. This information comes to the analyst's attention as part of the usual action notices. These pointers to capacity problems go well beyond capacity requirements planning (CRP) and would be impossible without computer assistance. Our study produced two other findings. First, short‐term bottlenecks occur even when the master production schedule is leveled. The culprits are the lot sizing choices for items at lower levels in the bills of material. “Rough‐cut” capacity planning, such as resource requirements planning, therefore is not a sufficient tool for leveling capacity requirements. It must be supplemented by a way to smooth bottlenecks otherwise caused by shop orders for intermediate items. Second, the disruptive effect of large lot sizes is apparent, both in terms of higher inventories and worse customer service. Large lot sizes not only inflate inventories, but paradoxically hurt customer service because they create more capacity bottlenecks. The only reason why management should prefer large lot sizes is if set‐up times are substantial and cannot be efficiently reduced. This finding is very much in step with the current interest in just‐in‐time (JIT) systems.
A vacation scheduling algorithm for military flight crews: Maximizing satisfaction while maintaining military preparedness
This article develops a quantitative method of assigning leave to crewmembers in an operational military flying squadron. The objective of the assignment process is to maximize crew preferences. This objective is limited by manning constraints which limit the number of crews that can be on leave at the same time. The basis of the assignment process is a point system which allows each crew to bid for the periods they prefer. The periods are then assigned to the highest bidder. In this way, each crew is assured of an influence in the leave assignment process, and the results are entirely in the hands of the crews themselves. The method now used to assign leave was developed and refined during a three year period from 1981 to 1983. The 1983 method includes a two‐phase partially open bidding system. In Phase I, crews signed up on a posted calendar for the periods they wanted, but they did not assign points to the periods. During this phase, crews could change their period request as they saw what other crews requested. This allows crews to sequence themselves to avoid conflicts. At the end of Phase I, the juggling process was closed, and crews could no longer change their period request. Crews were given a week between the close of Phase I and the start of Phase II to see how many other crews they were competing with. Then in Phase II, they submitted their points via closed bid. This system was very effective in both distributing the demand and preventing “gaming.” There was a strong disincentive from changing a period request at the last minute. If they did, the competition had a week to see whom they were competing with and could then bid accordingly. It was to everyone's advantage to avoid competition. Statistical analysis and positive feedback from crews and scheduling personnel have proven this method to be significantly superior to the former system.