Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
1801 results ✕ Clear filters

The interchangeability of safety stocks and safety lead time

Journal of Operations Management 1985
Due to the uncertainty in estimating both the demand for end products and the supply of components from lower levels, buffering techniques should be included before the loading of a material requirement planning (MRP) system. Safety stocks and safety lead time are two techniques of providing buffering for loading. There have been many studies made concerning the determination of the amount of safety stocks and safety lead time. Some guidelines for choosing between safety stocks and safety lead time for dealing with uncertainty in both demand and supply also have been established. Although these two different methods have been used successfully, it has not been documented that using these two methods in a given situation will yield essentially the same results; that is, the interchangeability of these two buffering techniques has not been explored quantitatively. Since the net influence of safety stocks and safety lead time and their quantitative interchangeability are of major interest, an analytical model is proposed for this study. The lead‐time offset procedure for components loading are represented by a matrix model that is based on a lot‐for‐lot lot‐sizing technique. This lead‐time offset matrix model is the product of the precedence matrix and the fixed‐duration matrix. The precedence matrix is formed according to the total requirement factor matrix and the duration matrix is formed by each component process time. Thus, the lead‐time offset matrix will generate the starting period of each component. When the lead‐time offset procedure is modeled, the net influence of buffering quantity can be analyzed. The planned safety stock that is normally used to accommodate unexpected demand, shortage in supply, and defects from the operation at each process can be combined with demand to form the master production schedule. The revised lead time due to the integration of the safety stocks can be calculated through the lead‐time offset model. The safety lead time may extend the component process time as well as overall production lead time if the designated safety lead time is longer than the available slack time in a fixed lead‐time loading system. When the proposed lead‐time offset model is further examined, it is found that planned safety stocks at the higher level can buffer the fluctuations of lower level components quantity as well as the fluctuations of same level components quantity. Safety stocks can also buffer shortages that are caused by the delay of raw material and manufacturing processes. Thus, safety stocks can be used to buffer unexpected delay time up to certain limits. A planned safety lead time at higher level component process can buffer the fluctuations of lower level components process time, as well as the same level component process time. The safety lead time can be used to produce additional products to meet unexpected excessive demand up to certain limits under the following conditions: 1. The excessive demand is known before the actual processing of the components in the lowest level. 2. The raw material at the lowest level is available. Although safety stocks and safety lead time are interchangeable in terms of the ability to buffer variations in quantity, the conditions for safety lead time are seldom met in actual practices. Thus, the slack time in a fixed lead‐time loading system cannot be considered as an effective measure to substitute safety stocks. However, all or part of the delay in manufacturing processes or the supply from the lower level components can be buffered by the safety stock and the MPS will still be met. From this study, it is obvious that the slack time can be reduced when safety stocks are planned for an MRP system. The reduction of fixed lead‐time duration will be beneficial to the overall planning and scheduling in MRP systems.

An evaluation of overtime policies for a repair shop

Journal of Operations Management 1985
This article presents the first attempt to develop and examine overtime policies for a repair shop environment. Overtime is used to augment repair capacity as needed to offset short‐term demand fluctuations. If overtime provides sufficient additional repair capacity, it may be possible to reduce investment in spare parts inventory. The use of overtime in a repair shop requires managerial attention to several issues. In this article, the following five issues are examined: The relationship between overtime policies and spares stocking levels The timing of overtime—reactive or proactive The amount of overtime to use The level in the product structure at which overtime is most beneficial The priority scheduling and labor assignment policies used Six overtime policies are developed that explore the above issues. These are examined using a simulation model of a hypothetical repair shop. Since the focus of the article is on overtime policies, a single labor assignment policy is used in conjunction with two priority scheduling rules. The results indicate that reactive overtime policies work well in this environment and overtime is most effective at the lowest level of the product structure, where repair times are relatively shorter. In addition, lowest level parts provide more usage flexibility to handle anticipated future failures.

Short interval forecasting of emergency phone call (911) work loads

Journal of Operations Management 1985
There has been an increasing emphasis over the last 5 to 10 years to improve productivity in the Service Sector of the U.S. economy. Much of the improvement obtained by these managers has come about through better scheduling of the work force in these organizations. Effective scheduling of this personnel requires good estimates of demand, which may exhibit substantial variations between days for certain times of the year. The Indianapolis Police Department (IPD) Communications area is one such organization that exhibits varying workloads and is interested in improving staff scheduling of dispatch operators. This article explores the use of six different forecasting techniques for predicting daily emergency call workloads for the IPD's communications area. Historical call volume data are used to estimate the model parameters. A hold‐out sample of five months compares forecasts and actual daily call levels. The forecast system utilizes a rolling horizon approach, where daily forecasts are made for the coming month from the end of the prior month. The forecast origin is then advanced to the end of the month, where the current month's actual call data are added to the historical database, new parameters are estimated, and then the next month's daily estimates are generated. Error measures of residual standard deviation, mean absolute percent error, and bias are used to measure performance. Statistical analyses are conducted to evaluate if significant differences in performance are present among the six models. The research presented in this article indicates that there are clearly significant differences in performance for the six models analyzed. These models were tailored to the specific structure and this work suggests that the short interval forecasting problems faced by many service organizations has several structural differences compared to the typical manufacturing firm in a made‐to‐stock environment. The results also suggests two other points. First, simple modeling approaches can perform well in complex environments that are present in many service organizations. Second, special tailoring of the forecasting model is necessary for many service firms. Historical data patterns for these organizations tend to be more complex than just trend and seasonal elements, which are normally tracked in smoothing models. These are important conclusions for both managers of operating systems and staff analysts supporting these operating systems. The design of an appropriate forecasting system to support effective staff planning must consider the nature, scope, and complexity of these environments.

Estimating service level impacts from changes in cycle count, buffer stock, or corrective action

Journal of Operations Management 1985
Inventory managers, tasked with providing adequate levels of material support, need to be able to gain insights, in a computationally easy manner, to the magnitude of improvements in protection levels against stockouts that can be gleaned from the three mechanisms available to them—more buffer stock, more physical inventories, or more corrective action to eliminate or reduce the causes for the errors arising in the first place. Armed with quantitative conservative estimates of the types of improvements available from any of these three mechanisms or combinations of the mechanisms, and the relative cost of each, the manager is is a better position to select a cost‐effective, remedial course of action.

An investigation of labor assignment rules in a dual‐constrained job shop

Journal of Operations Management 1985
One of the management decisions required to operate a dual‐constrained job shop is the labor assignment rule. This study examines the effects of various labor assignment rules on the shop's performance. Eleven different labor assignment rules are simulated. A longest‐queue rule and the traditional counterparts of the first‐in‐system, first‐served, shortest operation time, job due date, critical ratio and shortest processing time dispatching rules are used to determine to which work center available workers should be transferred. Also tested are five new labor assignment rules that use an average of the priority values of all jobs in queue at a particular work center to determine whether that work center should receive the available worker. A SIMSCRIPT simulation program that models nine work centers provided the mechanism by which these rules were tested. Five dispatching rules, the counterparts of the five “traditional counterpart” labor assignment rules mentioned earlier, provided different shop environments. Also, the level of staffing of the work centers was altered to provide additional ship environments. Staffing levels of 50% and 67% were employed. The results show that none of the eleven labor assignment rules had a significant impact on shop performance. This is an important result because it implies that a manager can make the labor assignment decision based on other criteria such as ease or cost of application of the rules. These results were relatively insensitive to the shop environment, as represented by the dispatching rule and the staffing level.

The cost of inflated planned lead times in MRP systems

Journal of Operations Management 1985
Much of the current literature in the field of production and inventory control systems stresses the need to revise traditional forms of thinking regarding production processes, the role of inventories for work in process, and the need for reduced lead times or flow times. Group technology, manufacturing cells, and other means of incorporating repetitive manufacturing techniques into traditional job‐shop settings constitute the leading edge in system development. Still, there is resistance to these dramatic changes, and traditional “business as usual” methods still predominate. This study attempts to illustrate graphically the cost justification associated with reduction in lead times which generally results from these new concepts. In most job shops today, lead times are much longer than they need to be due to inflation of lead time estimates. Actual lead times for the manufacture of fabricated and assembled products have been shown to be a direct consequence of the planning lead times used in the MRP planning process—a form of self‐fulfilling prophesy. The research employs a simulation model of a factory using MRP as a planning tool in a multiproduct, multilevel production environment. Manufacturing costs constitute the dependent variable in the experiments, defined as the sum of material costs (including expedite premiums), direct labor costs (including overtime premiums), inventory carrying costs, and overhead costs. The independent variable being manipulated is the planned lead time offset used in the MRP planning process. Twenty values of planned lead time are evaluated ranging from a value that includes no slack time at all (pure assembly line) up to a value that allows 95% slack (queue) time which, unfortunately, is not uncommon in many job shops today. Stochastic variables in the model include customer demand and actual processing times—the sum of set‐up and run times. The result of the study is a cost curve formed over the range of independent lead time variables that is constructed using nonlinear regression techniques. The conclusions from the resultant graph clearly indicate the cost consequences of long lead times, with exponential cost increases beyond the 80–90% queue time level. Total costs are 41% higher at the maximum lead time allowance compared to the minimum. Clearly, this study demonstrates the need for lead time reduction, either through downward adjustment of MRP planned lead times or by introducing new manufacturing concepts.

Multiproject scheduling: Analysis of scheduling strategies under unequal delay penalties

Journal of Operations Management 1985
The multiproject scheduling problem is investigated under the assumption that delays corresponding to different projects carry different penalties. Five penalty functions are introduced that simulate typical business behavior. These are: 1) assigning the highest penalty to the project requiring the greatest amount of resources; 2) assigning the highest priority to the longest project; 3) assigning the highest priority to the project requiring the least amount of resources; 4) assigning the highest priority to the shortest project; and 5) random assignment. Justification for each case is provided. Two powerful project summary measures were used to generate the test problems. The first measure, average resource load factor (ARLF), identifies whether the location of the peak requirement of all (i.e., combined) resources is in the first or second half of the project's critical path. If each resource is expressed in terms of dollars, then ARLF identifies the location of the peak cash requirement. Since in practice the choice of the scheduling strategy is influenced by the location of the peak cash requirement, performance of the scheduling strategies is analyzed with respect to values of this measure. The second measure, average utilization factor (AUF), calculates the ratio of resource requirements to availabilities. It is shown that problems tested must have different AUF values in order to be classified different for purposes of experimental design. Thus a factorial model of the form, y = Strategy + Penalty + ARLF + AUF + ϵ was used to generate 385 problems, each requiring 2 to 4 resources, containing 3 to 5 projects and 34 to 63 activities. The computer program used in the study is based on a parallel method of scheduling in which priorities of the activities are determined when the activity is considered for scheduling. Ten scheduling strategies are tested. Some important ones are: 1) to schedule the shortest activity first; 2) to schedule the activity with minimum slack first; 3) to schedule the activity with maximum work content first (i.e., from the project with highest work content); 4) to schedule the shortest activity from the shortest project first; and 5) to schedule the activity with maximum penalty first. Shortest activity first and minimum slack first are popular strategies introduced by other researchers. Using number of times ranked first as our criterion, scheduling the activity with maximum penalty first provides the best results followed by the strategy of scheduling the activity with maximum work content. But when these results are analyzed with respect to existence of a very expensive project (i.e., dominance) in the problem, performance of the maximum penalty strategy improves. When the overall results are analyzed with respect to values of ARLF, a different picture emerges. Then the strategy of scheduling the activity with the highest penalty first provides the best results if the peak requirement is early. When the peak requirement is toward the middle of a project's unconstrained critical path, scheduling the activity with the highest work content provides the best results. When the peak requirement is late in a project's life, scheduling the shortest activity from the shortest project is the best strategy to adopt. These findings were tested for statistical significance by using nonparametric testing procedures and were found to be significant.

Stochastic unpaced line design: Review and further experimental results

Journal of Operations Management 1985
Previous design studies of unpaced assembly lines that exhibit stochastic task times indicate that an unbalanced allocation of task times results in optimal output rates. In this article, we present a comprehensive review of the previous literature on this topic and discuss the results of simulation experiments that test the bowl distribution for unbalancing unpaced lines. The simulation experiment was designed to test the bowl distribution in more realistic environments than previously tested and illustrates that a balanced line configuration is as good as or better than an unbalanced line configuration when task times are modeled with more typical values of variance. Stochastic unpaced assembly line research employs both simulation and analytical approaches to test the allocation of buffer capacity and task times to work stations. Analytical models are utilized to investigate simple line designs with exponential or Erlang task time distributions. Simulation is used for longer lines and for normal task time distributions. From the review of the previous research using both approaches, we note five major findings: 1) unbalancing task time allocation is optimal when task time variation is large; 2) unbalanced allocation of buffer storage capacity improves line output rate when task time variation is large; 3) output rate of an unpaced line decreases as the number of sequential workstations increases; 4) output rate increases as more buffer storage capacity is available; and 5) output rate decreases as the task time variation increases. Most of the previous research on unpaced lines investigated lines with few workstations and large task time variation. Empirical research by Dudley (6) suggests that variation of task times in practice is much less than variations employed in previous unpaced line studies. We present the results from simulation experiments that model longer unpaced lines with lower levels of task time variance of the magnitude that is likely to occur in practice. The results of our simulation experiments verify the benefits of using the bowl distribution for task time allocation when line lengths are short and task times experience large variance. However, when line lengths are extended or task time variation is reduced, the use of the bowl distribution for unbalancing the line degrades the line's efficiency. In these situations, the optimal task time allocation is a balanced line. Two important implications for managers follow from the results of our experiments: 1) that unpaced line output rate is relatively insensitive to moderate variations from optimal task time allocations when buffer storage is limited; and 2) that perfectly balanced line designs are optimal for most cases in practice.

Safety stocks and component commonality

Journal of Operations Management 1985
In the implementation of an MRP‐based planning system it is often desirable to hold safety stocks at the component level. This approach is typical of a system that assembles finished products to order but builds components to a forecast. The same approach makes sense when end‐item buffers would be prohibitively expensive to maintain, or when there is significant spares demand for the components. The existing theory for sizing component safety stocks is little more than an application of the principles governing single‐level inventory decisions. The standard deviation of the distribution for demand is the key parameter. A multiple of this standard deviation, called the safety factor, is set by management policy. This safety factor determines the size of the safety stock. In simple cases there is a direct relationship between the safety factor and the level of customer service. Component commonality refers to a situation in which one component is common to more than one end item. The presence of commonality makes it difficult to determine safety stocks accurately. The existing theory, which is reviewed briefly, examines the effects of commonality on the component's safety factor. However, commonality destroys the relationship between safety factor and service level. This article introduces a simple example to illustrate this fact. The example suggests some problems that must be addressed if the theory is to encompass commonality. Among these are the need to develop service level measures for multiple products and to analyze the relationship between safety stock and service level.

An efficient implementation of the Wagner‐Whitin algorithm for dynamic lot‐sizing

Journal of Operations Management 1985
We consider an N‐period planning horizon with known demands D t ordering cost A t , procurement cost, C t and holding cost H t in period t. The dynamic lot‐sizing problem is one of scheduling procurement Q t in each period in order to meet demand and minimize cost. The Wagner‐Whitin algorithm for dynamic lot sizing has often been misunderstood as requiring inordinate computational time and storage requirements. We present an efficient computer implementation of the algorithm which requires low core storage, thus enabling it to be potentially useful on microcomputers. The recursive computations can be stated as follows: urn:x-wiley:02726963:joom229:equation:joom229-math-0001 where M jk is the cost incurred by procuring in period j for all periods j through k, and F k is the minimal cost for periods 1 through k. Our implementation relies on the following observations regarding these computations: urn:x-wiley:02726963:joom229:equation:joom229-math-0002 Using this recursive relationship, the number of computations can be greatly reduced. Specifically, additions and multiplications are required. This is insensitive to the data. A FORTRAN implementation on an Amdahl 470 yielded computation times (in 10 −3 seconds) of T = −.249 + .0239N + .00446N 2 . Problems with N = 500 were solved in under two seconds.