Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
1801 results ✕ Clear filters

The effects of input control in a simple scheduling model

Journal of Operations Management 1984
Input control is a generic procedure for smoothing production workload by delaying work during intervals of heavy load. While input control techniques have several practical benefits, they also have an inherent disadvantage. By restricting the set of jobs available for scheduling, an input control procedure removes some of the scheduling options that would otherwise be available. This paper examines the impact of such a procedure in a simple simulation model. The simulation model represents a production shop in a simplified way, as a single machine, but the production control system has three distinct parts. The first part assigns due‐dates to customer orders, taking into consideration the size of each job and the workload in the shop. The second part is a job releasing rule that implements input control. The third part is a priority dispatching procedure that is aimed at meeting due‐dates. By representing this three‐part control system the model provides an opportunity to explore the interdependence between input control and other control procedures. Reinforcing previous research, the simulation experiments confirm that modified due‐date priorities perform more effectively than other basic priority rules when performance is measured by average tardiness. Moreover, the experiments indicate that performance under the modified due‐date regime is never improved by the use of input control. On the other hand, with dispatching rules that rely on shortest‐first or critical ratio priorities, the experiments indicate that input control is sometimes advantageous. The effects of input control on scheduling performance thus appear to be somewhat complicated, and further experiments were designed to explore some of the relationships involved. The principal finding, however, provides a warning that input control can be counterproductive.

DISPLAN: A multiproduct plant/warehouse location model with nonlinear inventory costs

Journal of Operations Management 1984 open access
DISPLAN is a large‐scale computer model used for the strategic planning of physical supply and distribution networks. This planning may involve the determination of the number, size, and location of plants, warehouses, inventories, terminals, and like facilities. Although a number of mathematical models exist to treat this problem, a unique feature of DISPLAN is its handling of nonlinear inventory costs. The proper economic analysis of network designs requires that all relevant costs be balanced to achieve the minimum cost configuration of facilities. These costs include facility inbound and outbound transportation costs, warehouse storage and handling costs, order processing costs, facility fixed costs, and inventory carrying costs. Among these costs, it is vital that inventory carrying costs be accurately described since they are a major factor determining the number of facilities in a network. Due to the limitations of many solution methods, inventory carrying costs are neglected or they are treated as a linear function of the number of facilities in the network. However, if a company's inventory policy is based on the concept of the economic order quantity, then the relationship between the number of facilities and the total inventory in the network is nonlinear, commonly referred to as the inventory consolidation effect. Inaccurate representation of this effect through linear approximation can lead to an incorrect number of facilities in the network. The methodology of DISPLAN is a heuristic procedure that uses the 3‐dimensional transportation algorithm of linear programming in an iterative fashion to converge on the minimum cost network configuration subject to facility capacity and customer service constraints. Warehouse fixed costs and inventory costs are recomputed on a per‐unit basis after each iteration, once the warehouse throughput has been established. These per‐unit costs can be added to the per‐unit transportation, handling, and order processing costs of the linear programming algorithm. The revised problem is resolved. The process is repeated until the best number, location, and size of warehouses are determined. Because of the nonlinear inventory cost curve, the procedure may terminate at a local optimum on the total cost curve. The stopping rule that terminates the procedure when the change in total costs between successive iterations is less than a given percentage is not absolute. Additional iterations may be computed to help assure that the global optimum is realized. Finally, a reconsideration routine is included in the computational procedure for those cases where fixed costs are a high proportion of total costs. The main heuristic may leave too many warehouses in the network and this routine explores a reduced number of warehouses. This assures that a substantial cost‐saving opportunity is not overlooked. The DISPLAN methodology has been applied to many network configuration problems in a variety of industries. Typical of these are retailing, manufacturing, and spare parts distribution. The method has shown modest computer running times that are linear with problem size.

Optimum stock levels for excess inventory items

Journal of Operations Management 1984
Insufficient attention has been focused on the ubiquitous problem of excess inventory levels. This paper develops two models of different complexity for determining if stock levels are economically unjustifiable and, if so, for determining inventory retention levels. The models indicate how much stock should be retained for regular use and how much should be disposed of at a salvage price for a given item. The first model illustrates the basic logic of this approach. The net benefit realized by disposing of some quantity of excess inventory is depicted by the following equation: urn:x-wiley:02726963:joom245:equation:joom245-math-0001 This relationship can be depicted mathematically as a parabolic function of the time supply retained. Using conventional optimization, the following optimum solution is obtained: urn:x-wiley:02726963:joom245:equation:joom245-math-0002 where t 0 is the optimum time supply retained; P is the per‐unit purchase price; P s is the per‐unit salvage price; C is the ordering cost; Q is the usual item lot size; F is the holding cost fraction; and R is the annual demand for the item. Any items in excess of the optimum time supply should be sold at the salvage price. The second model adjusts holding cost savings, repurchase costs, and reorder costs to account for present value considerations and for inflation. The following optimum relationship is derived: urn:x-wiley:02726963:joom245:equation:joom245-math-0003 where i is the expected inflation rate and k is the required rate of return. Unfortunately this relationship cannot be solved analytically for t 0 ; Newton's Method can be used to find a numerical solution. The solutions obtained by the two models are compared. Not surprisingly, the present value correction tends to reduce the economic time supply to be retained, since repurchase costs and reorder costs are incurred in the future while salvage revenue and holding cost savings are realized immediately. Additionally, both models are used to derive a relationship to describe the minimum economic salvage value, which is the minimum salvage price for which excess inventory should be sold. The simple model, which does not correct for time values, can be used by any organization with the sophistication level to use an EOQ. The present value model which includes an inflation correction is more complex, but can readily be used on a microcomputer. These models are appropriate for independent demand items. It is believed that these models can reduce inventory investment and improve bottom line performance.

A cost‐effective approach to stochastic line balancing with off‐line repairs

Journal of Operations Management 1984
The layout of production facilities is an important determinant of the productivity potential of a manufacturing enterprise. It is particularly important in the design of assembly lines where the objective is to assign tasks to work stations in such a way as to minimize total variable production costs. Early approaches to the line balancing problem assumed known constant task times and sought a line layout which would produce the desired output with the fewest number of work stations, which is equivalent to minimizing idle time. Studies have shown that task times are random variables, therefore the cost of task incompletion must be considered a part of total production cost. Incompletion cost will be the cost of repairing or completing tasks which cannot be completed within the cycle time after the item has reached the end of the assembly line. This paper describes a methodology for designing approximately minimum cost paced assembly lines under conditions of random task times and off‐line repair of incompleted tasks. Task times are assumed to be normally distributed random variables with known means and variances. The methodology consists of heuristically identifying a large number of feasible balances for each of which total costs are computed. The line design with the lowest total is retained as the “best.” In order to evaluate candidate line layouts, a total cost model is developed. Total cost is the sum of normal operating cost—which is simply a function of the number of work stations—and the cost of repairing products containing incompleted tasks. Because this latter cost is a random variable for a given balance, the expected value is used to evaluate a candidate layout. The cost associated with one or more workers exceeding the cycle time is the product of the probability of this happening and the expected cost of off‐line repair. The heuristic method for generating feasible balances builds work stations from continually updated lists of precedence satisfying tasks. Qualifying tasks are added to the station as long as the probability of the station exceeding the cycle time remains below a pre‐specified threshold. The methodology requires systematically varying this threshold to permit a lowest total cost solution to emerge. The process of generating a large number of balances for a particular threshold is efficient. Evaluating the total costs of the resulting balances takes the majority of the computational time. An experiment was conducted in order to compare the above cost‐effective methodology with a purely deterministic approach and a commonly used industrial approximation method for dealing with task time variability. The experiment applied the three methods to four problems from the literature under a variety of repair cost and time variance conditions. In 21 of the 24 cases studied, the stochastic method produced a lower cost balance than the two alternatives. In the remaining 3 cases, the deterministic method also found the lowest cost balance. The stochastic method saved an average of 22.5 percent in total operating cost over the deterministic method and 8.4 percent over the industrial method. The experiment clearly showed the need to explicitly consider task time variability in arriving at a line balance. The stochastic approach of this paper offers large potential savings with no risk of obtaining a less desirable balance and so should be considered for implementation whenever there is a variation in task times. Even for large‐scale problems, the computational cost is infinitesimal in the context of assembly line balancing, where very small improvements in productivity can mean substantial increments to profitability.

A heuristic programming approach to the employee scheduling problem and some thoughts on “managerial robots”

Journal of Operations Management 1984
We describe a system for the automatic scheduling of employees in the particular setting in which: the number of employees wanted on duty throughout the week fluctuates; the availabilities of the employees varies and changes from week to week; and a new schedule must be produced each week, by virtue of the changing demand for service. The problem which we address appears in a variety of settings, including: airline reservation offices; telephone offices; supermarkets; fast food restaurants; banks and hotels. Previous approaches to the problem have relied chiefly on formal methods, generally involving one or another variation of linear or integer, mathematical programming. We suggest that except in cases involving very small problems (only a handful of employees) that those approaches have not proven promising, especially where union rules and management requirements impose complex constraints on the problem, and that a heuristic approach has proven to be substantially superior. We set forth the general features of our heuristic approach, which we see as an application of artificial intelligence; we show how, in contrast to other approaches, which design shifts as if employees were always available and try to fit those shifts to employees who are not always available, our system design shifts with deference to the employees' limited availabilities; we suggest that, for a given service level, our system produces schedules with a better “fit”—number of employees actually on duty comparing more favorably with the number wanted; and we state that while, for a given service level, a ‘manual scheduler’ may take up to 8 hours each week to prepare a good schedule, our system, on most micro computers, routinely produces better schedules involving up to 100 employees in about 20 minutes. The scheduling of employees is generally considered to be a managerial function, in the setting of the problem we address. When a craft employee is replaced on an assembly line by a machine which performs the same function, we speak of the replacing mechanism as an industrial robot. We suggest that systems like that which we describe deserve a name, to distinguish them from comparable, computer based systems which do not replace, but rather supplement a manager, and we suggest the name ‘managerial robot’ for such systems. We set forth the characteristics which we feel would justify applying the term ‘managerial robot’ to a computer based system, and suggest that classification is basic to understanding and communication and that just as terms such as decision support systems and expert systems prove useful in our increasingly advanced, technological society, so also the term managerial robot has a place in our scheme of things. Decision support systems do not qualify as managerial robots for the reason that managerial robots don't simply support the decision making process, but rather replace the manager in his performance of a function which, when performed by a human being, is considered a managerial function. Nor do we consider managerial robots to qualify as expert systems. While our scheduling system contains an inference mechanism, and could be enhanced to improve the quality of its schedules thru ‘experience’ (and thus to ‘learn’?), that—lacking a knowledge base in the sense of expert systems‐and most of all in replacing rather than supporting the decision maker, the managerial robot needs a term of its own. We elaborate, in this paper, a specific application of our system, and show how the design of shifts, and the placement of breaks, serve to yield a fit whose quality no human scheduler can duplicate.

Resolving uncertainty in manufacturing systems

Journal of Operations Management 1984
This paper examines the effectiveness of three commonly practiced methods used to resolve uncertainty in multi‐stage manufacturing systems: safety stock under regenerative material requirements planning (MRP) updates, safety capacity under regenerative MRP updates, and net change MRP updates, i.e., continuous rather than regenerative (periodic) updates. The use of safety stock reflects a decision to permanently store materials and labor capacity in the form of inventory. When unexpected shortages arise between regenerative MRP updates, safety stock may be depleted but it will be replenished in subsequent periods. The second method, safety capacity, overstates the MRP capacity requirements at the individual work centers by a prescribed amount of direct labor. Safety capacity either will be allocated to unanticipated requirements which arise between MRP regenerations or will be spent as idle time. The third method, net change, offers a means of dealing with uncertainty by rescheduling instead of buffering, provided there is sufficient lead time to execute the changes in the material and capacity plans. Much of the inventory management research has addressed the use of safety stock as a buffer against uncertainty for a single product and manufacturing stage. However, there has been no work which evaluates the performance of safety stock relative to other resolution methods such as safety capacity or more frequent planning revisions. In this paper, a simulation model of a multi‐stage (fabrication and assembly) process is used to characterize the behavior of the three resolution methods when errors are present in the demand and time standard estimates. Four end products are completed at an assembly center and altogether, the end products require the fabrication of twelve component parts in a job shop which contains eight work centers. In addition to the examination of the three methods under different sources and levels of uncertainty, different levels of bill of material commonality, MRP planned lead times, MRP lot sizes, equipment set‐up times and priority dispatching rules are considered in the experimental design. The simulation results indicate that the choice among methods depends upon the source of uncertainty, and costs related to regular time employment, employment changes, equipment set ups and materials investment. For example, the choice between safety stock and safety capacity represents a compromise between materials investment and regular time employment costs. The net change method is not designed to deal effectively with time standard errors, although its use may be preferred over the two buffering alternatives when errors are present in the demand forecasts and when the costs of employment changes and equipment set ups are low. The simulation results also indicate that regardless of the method used, efforts to improve forecasts of demands or processing times may be justified by corresponding improvements in manufacturing performance.

Scheduling operating room surgical procedures with early and late completion penalty costs

Journal of Operations Management 1984
This work explores the impact of a statistical scheduling technique on two classes of idle times in hospital operating suites. Initially, a mathematical model designed to minimize a weighted sum of the two types of idle time was constructed and optimized. However the minimum solution obtained presented large inequities in the distribution of idle time costs. An example demonstrates the disproportionately high waiting time costs found for one type of waiting cost relative to the other idle time cost. Because the two types of costs were to be absorbed by two different groups, this type of optimal solution was deemed to be unacceptable. For this reason, an “equalizing” solution approach was developed. To provide a realistic basis for the model, over 2,000 actual surgical procedure times were used to model the operation of an operating room suite. The operation was then simulated using a two‐stage Monte Carlo method to approximate the distribution of times and procedure types. Idle time functions for early and late completion were then statistically fitted to obtain estimates of the expected idle times as a function of the amount of time scheduled by procedure type. Both types of solution, the optimizing and the equalizing, were examined. By using the ratio of the two types of idle time costs, we were able to avoid the problem of having to attach specific numerical values to the individual waiting time costs. Both solutions provided capacity/utilization ranges for effective scheduling to either minimize or equalize the two types of costs. Suggestions for implementation using computer‐assisted scheduling methods are discussed.

Progress toward the “factory of the future”

Journal of Operations Management 1984
Despite the considerable attention being placed on the potential payoff's from programmable manufacturing technologies, remarkably little systematic research has been conducted on organizational plans, decisions, and associated actions. The 1982‐83 factory automation surveys project of the Boston University Manufacturing Roundtable reported on here was designed to develop a broad managerial view of computer‐aided manufacturing processes in the US. Our purpose was to create a body of information, drawn from the recent experience of leading‐edge practitioners, that would begin to describe the range of behaviors accompanying the adoption and implementation of automation technologies, such as advanced numerical control, CAD/CAM and robots, which may be combined to form the “factory of the future”. In short, we wanted to identify the kinds of progress being made by these manufacturers and the barriers that they, and those who are contemplating such process innovations, will face in the future. In each of our three surveys we had a specific target population in mind. The “user” survey was aimed at discrete‐part manufacturing organizations that were leaders in adopting factory automation technologies. This survey was designed to address “best practice” at the level of a single strategic business unit and deals with specific automation projects. Our “supplier” survey was aimed at the major producers of each of the various factory automation technologies. Here we sought the observations and opinions of senior marketing executives in those firms with the most success (and therefore experience) in supplying computer‐based manufacturing technologies. Finally, our “expert” survey was designed to test some of our preliminary findings from the users and suppliers, including insights gathered from in‐depth follow‐up telephone interviews with respondents to those two surveys. We intentionally tried to identify a broad sample of individuals whose views would be based on extensive factory automation experience in different capacities. Respondents to our three surveys consisted of 57 users, 38 suppliers and 64 experts. Findings from the three surveys form certain patterns that transcend the isolated facts commonly presented in the literature. The dominant impressions that emerged from the data were: Leading‐edge users of computer‐aided manufacturing processes believe in learning by doing . Most have proceeded in an incremental fashion to develop an internal base of experience with factory automation technologies. They tend to have supportive management and a sense of where they are heading. Their current measurement capabilities, however, restrict the basis for making adoption decisions as well as the subsequent evaluation of impacts from recent technological innovations. These users usually rely heavily on outside suppliers for critical technical assistance and consider reliability factors to be more important than price in selecting a vendor. They generally feel they cannot afford to postpone decisions until improved technologies become available. Current leadingedge users will strongly affect the future direction of these technologies. Suppliers claim that most manufacturers are not sophisticated customers . They would like potential users to be more aware of their needs for improved manufacturing processes and to be more interested in the long‐term strategic benefits of computer‐aided manufacturing technologies already on the market. A classic dilemma seems to have arisen: decisions to adopt expensive factory automation technologies are often made by managers who lack the background to assess technological options, while staff familiar with the new technologies are less able to appreciate associated strategic dimensions. A likely outcome is a decision that is either short‐sighted or misguided. Suppliers with limited direct experience in new applications of their technologies and little indepth knowledge of the business situations of their customers cannot be expected to help users avoid such errors. The most difficult problems in achieving computer integrated manufacturing are managerial rather than technical. Manufacturers contemplating factory automation face different issues depending on whether they adopt a retrofit strategy using existing production systems or whether they attempt to make a fresh start as new facilities are brought on stream. In either case, they often have inadequate internal technical resources, strong barriers to communication across traditional functional lines, and a reward structure that does not encourage risk‐taking in the interest of long‐term strategic gains. Manufacturing organizations that do not deal directly with these kinds of managerial problems are not likely to succeed in factory automation, even if appropriate technological options exist. These functions suggest that manufacturing managers ought to reflect on their organization's current strengths and weaknesses as they formulate a strategy for factory automation. In particular, they should begin with a healthy concern for the adequacy of their current base of knowledge, mix of human resources and formal measurement systems. They should also refine their expectations for integrated factory automation applications, to be sure that general goals such as “enhanced flexibility” have explicit operational meanings. Finally, they should improve their organization's ability to identify types of indirect costs, as well as benefits, that are implicit in such goals. These prescriptions apply to manufacturers just beginning to adopt programmable manufacturing technologies, as well as to those who are well along this path. Further in‐depth research is needed if the progress being made by leading‐edge users is to serve as a basis for more widespread attempts to move toward the “factory of the future”.

Constrained resource project scheduling subject to material constraints

Journal of Operations Management 1984
Constrained resource project scheduling techniques schedule project activities subject to finite constraints on the availability of non‐storable resources such as labor and equipment without consideration of constraints resulting from material requirements. Projects are frequently delayed and resources are wasted when project activities are delayed due to material shortages. A heuristic procedure is presented here for scheduling large projects subject to the availability of all necessary resources, including materials, manufactured components, facilities, equipment and labor as well as the acquisition lead times required by these resources. Results are listed for tests involving both benchmark and actual problems.

Assemble‐to‐order manufacturing: Implications for materials management

Journal of Operations Management 1984
A company's manufacturing is often characterized as either make‐to‐stock (MTS), make‐to‐order (MTO), or assemble‐to‐order (ATO). This classification relates to the degree of interaction between the technological core and the market, with MTS involving the least amount of interaction and MTO the highest degree of contact. ATO represents a hybrid manufacturing strategy for which parts and subassemblies are made according to forecasts while the final assembly of the products is delayed until customer orders have been received. It is evident that each manufacturing philosophy has strategic as well as operational implications. This paper focuses on ATO manufacturing and, in particular, on the design and operation of the manufacturing planning and control system. The relative differences between MTO, ATO, and MTS strategies, and the reasons why a company may decide to be an ATO manufacturer, are discussed first. Several problem areas, which must be addressed by a company that chooses this form of manufacturing, are then identified. It is found that the ATO philosophy requires special system design considerations, particularly in the areas of master scheduling, bills of material structuring, order entry/order promising, final assembly scheduling, and buffering against demand uncertainty. Examples of important issues discussed are the selection of appropriate master schedule units and the associated consequences for the structuring of the bills of material; the choice of efficient procedures for reliable order booking using the combined information from forecasts, confirmed orders, and the master schedule; the relationship between the final assembly schedule and the master schedule; and various techniques that can be used to counter the effects of forecast errors related to the demand for customer options. Following the discussion of all the issues raised above and the presentation of some common solutions, actual industry applications taken from several companies are used to illustrate various aspects of ATO manufacturing. These case illustrations complement the other material since many of them were chosen to reflect alternative procedural approaches to some ATO‐related problems. Finally, areas for future research into the design and operation of ATO manufacturing systems are suggested. It is particularly noted that few normative models for systems design exist in this area.