Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
1801 results ✕ Clear filters

A review of cellular manufacturing assumptions, advantages and design techniques

Journal of Operations Management 1984
For years the industrial job shop has faced an increase in complexity and a decline in productivity due in part to an increase in part mix, volume of parts, plant size, machine production rates, and part complexity. One result of the increased complexity and reduced productivity is the development of Group Technology and cellular manufacturing which seek to eliminate or minimize complexity and to improve or maximize productivity. Group Technology can be defined as bringing together and organizing (grouping) common concepts, principles, problems, and tasks (technology). Cellular manufacturing is the physical division of the functional job shop's manufacturing machinery into production cells. Each cell is designed to produce a part family. A part family is defined as a group of parts requiring similar machinery, machine operations, and/or jigs and fixtures. The parts within the family are normally transformed from raw material to finished part within a single cell. For the successful implementation of cellular manufacturing, a set of assumptions should be adhered to. These assumptions are related to the design, operation and control of the system. There are numerous advantages associated with cellular manufacturing: – Reduced material handling – Reduced tooling – Reduced set-up time – Reduced expediting – Reduced in-process inventory – Reduced part makespan – Improved human relations – Improved operator expertise. There are also some disadvantages associated with cellular manufacturing: – Increased capital investment – Lower machine utilization. Numerous techniques are available to configure or reconfigure a cellular manufacturing system. Interestingly, nearly all published techniques come from Great Britain and Europe. Mitrofanov, in Russia, was an early proponent of cellular manufacturing with his composite component approach. J. L. Burbidge's Production Flow Analysis (PFA) was one of the first methodologies developed and subsequently published in the free world. It is also probably the most well known and most widely accepted method. In the last few years, Burbidge's PFA has undergone considerable revision and updating in an attempt to eliminate much of the original manual sorting and calculations. Computerization has been applied in an attempt to determine the key machines. Burbidge has termed this new concept nuclear synthesis [4]. El-Essaway and Torrance incorporated many of Burbidge's material flow simplification concepts in their computerized Component Flow Analysis. V.B. Solaja and S.M. Urosevic have developed a method in which cells are designed based on optimizing three criteria: Maximizing machine utilization, minimizing the part operation time, and minimizing capital invested. In 1972, McAuley presented a method of creating cells based on part classification and coding and on a similarity coefficient. A.S. Carrie and J. Mannion reported in 1975 on a cell design procedure which is based on forcing the cell to resemble a flow shop. There have been several other design techniques presented in the open literature. Each technique has specific capabilities and limitations. In summary, there are numerous techniques developed to form a traditional job shop into a cellular manufacturing system. But, there are very few documented applications or techniques based on optimal seeking analytical development. It is apparent that although techniques are known, they have not been developed for easy industrial application and in many cases do not have a strong enough analytical base to warrant implementation. Therefore although obvious advantages to Group Technology and cellular manufacturing exist and methods to create a cellular manufacturing system are available, these methods are problematic because design or redesign of a job shop to a cellular manufacturing system remains rather difficult and theoretical.

A simulation analysis of due date assignment rules

Journal of Operations Management 1984
In the job shop scheduling literature, due dates, when considered, are treated in one of two ways: 1) externally imposed or 2) internally set. Externally imposed due dates are outside the control of the scheduler and are assumed to be set by an order entry or marketing department in agreement with the customer. In this situation, current shop status information is not normally considered in setting the date. Research in this setting has focused on the identification of those priority (dispatching) rules which yield good “due date performance.” Due date performance is usually measured by job lateness, job tardiness, and/or proportion of jobs tardy. Internally set due dates are established by the scheduler as each job arrives. Using job characteristics and/or shop status information, the scheduler estimates the job flow time for each job and sets the due date accordingly. The early research in this setting did not focus explicitly on predicting individual job flow times, but rather on identifying simple due date assignment heuristics which provide good due date performance in concert with a variety of priority rules. More recent researchers have included shop status information in setting due dates. This article reports on a study of eight different rules for specifying due dates in a job shop and the evaluation of their performance. A series of tests is conducted with a computer simulation model utilizing three different dispatching rules to control the sequencing of work. Mean tardiness, mean absolute missed due dates, and standard deviation of lateness data are collected to measure each rule's performance. This study reports the first comparative analysis of various due date assignment rules that have been mentioned in the literature by different authors. The findings reported here provide some useful insight into past and future research. First, both job characteristic and shop status information should be used to develop due date assignment rules. Second, the dispatching rule used to sequence jobs at work centers influences shop performance. Third, information about work center congestion along a job's routing is more useful information than general shop conditions. And fourth, the use of more detailed information in predicting flow time provides only marginal improvement in performance over other rules that use more aggregate information.

Manual versus automated check encoding in commercial banks

Journal of Operations Management 1983
Despite moves toward electronic funds transfer systems, the financial community must continue to cope with the labor‐intensive paper processing requirements associated with a payments mechanism still heavily reliant upon checks. An attempt to eliminate the labor intensity is the recent development of optical scanning capture equipment which “reads” printed or handwritten documents. Mathematical programming models are used to compare the manual and the automated processing systems on a cost basis and to identify the kind of environment suitable for automation.

A note on stopping rules for rolling production scheduling

Journal of Operations Management 1983
Instead of solving fixed horizon production scheduling problems with specified terminal inventory conditions, we use forecasting to extend the problem horizon until stopping rule conditions are met. Major questions for this procedure relate to how to provide data for the extended problem and when to stop the process. We provide extensive computational results indicating that relatively simple methods perform quite well.

Full fixed cost recovery lot sizing with quantity discounts

Journal of Operations Management 1983
Purchasers must often make lot sizing decisions when facing price schedules of price‐quantity discounts. It is important to determine the supplier's pricing philosophy when establishing a solution procedure. One approach is to evaluate total costs at all of the appropriate break points. This offers limited information: a lot size and a set of total costs. This is especially true in the case of full fixed cost recovery pricing. In actual practice price schedules can be extremely lengthy: indeed, it may be in the supplier's best interests to offer comprehensive discount schedules. This situation complicates the purchaser's decision making process. An efficient alternative, which solves the price‐quantity discount problem when the supplier insists on a full fixed cost recovery schedule, is presented. Computations are reduced to a few simple steps; the result is a least total cost lot size for a simple linear package price model given parameters obtained by an appropriate analysis of the supplier's price‐quantity discount schedule. A starting point is determined and the choice of the lot size is made using a simple criterion. Rapid convergence is assured, given a reasonably well‐behaved schedule.

An empirical investigation of different strategies for material requirements planning

Journal of Operations Management 1983
Master production scheduling, component lot sizing, and capacity requirements planning represent three important modules of material requirements planning (MRP) systems. Coordinating these three modules has been largely dependent on managerial judgment and experience. In this research, five different strategies for integrating these modules are empirically investigated. These strategies differ mainly in the extent to which the modules are coordinated. The impact of the shop, product, component and cost characteristics is measured by varying ten experimental factors. The research findings so obtained provide several guidelines on the effectiveness of each strategy in different environmental settings.

Queue control using a historically developed stochastic model

Journal of Operations Management 1983
This paper applies a stochastic model to determine the optimal or ideal average planned queue level. The ideal average planned queue level is defined to be the minimum average queue level necessary to ensure that in the long run the probability of work center idle time over a specified planning horizon is no greater than some value α chosen by management. Also discussed is the usefulness of the ideal planned queue level, not only for controlling work‐in‐process inventories, but also for obtaining better work center lead time estimates.