Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
1801 results ✕ Clear filters

Static vs. dynamic priority rules for check processing in multiple dispatch‐multiple branch banking

Journal of Operations Management 1982
This paper presents a study comparing the use of four static and two dynamic priority rules for sequencing bundled checks in the check clearing operations in a bank's back office. The six priority rules are tested in a controlled computer simulation experiment, where bank factors of check bundle size, check bundle value, transit deadlines (dispatches), and destination proportions are systematically varied over prescribed levels. The results indicate that priority rule performance, measured by reduced float, is significantly affected by bank factors. The test results indicate that the two dynamic priority rules performed statistically better than three of the four static rules tested. The study reported here should prove useful to bank operation managers. The sequencing rules investigated here influence the level of float for a bank faced with multiple dispatches during the day. The test environments duplicated a variety of operating conditions that can be present in commercial banks. Therefore, the robustness of the tested static and dynamic rules were observed in reducing float under different conditions. Dynamic rules require recomputing priorities to reflect changes in time and create greater implementation effort to use effectively. Static rules require only one priority computation, resulting in easier implementation. This study indicates that one of the static priority rules tested provides comparable performance to the two dynamic rules.

Application of work center control rules in a job shop environment

Journal of Operations Management 1982
Work center control rules, defined as a combination of job dispatch rules and short‐term work center capacity adjustments, are analyzed using queueing theory. Promising rules are evaluated with a job shop simulation model. Simulations comparing work center control rules to the critical ratio rule for job dispatching indicate that work center control can increase performance to customer due date while simultaneously reducing average work in process inventory. The work center control rules are easily implemented by shops currently using input/output control and daily dispatch lists.

A cost minimization production planning model for continuous process chemical plant operations

Journal of Operations Management 1982
The management of large continuous process chemical plants oftentimes must make operating decisions within a rapidly changing economic environment. This paper describes a decision making aid in the form of a production planning model which is immediately responsive to such changes. The model provides cost minimization solutions to “what if” questions of management through the use of linear programming. Implementation upon an interactive computer system provides a user oriented model. A specific type of chemical plant operation involving 13 decision variables illustrates the approach. Five example real‐world situations demonstrate the approach's capability.

EOQ application in a pharmaceutical environment: A case study

Journal of Operations Management 1982
This paper describes a successful application of classical inventory theory at a drug manufacturing plant located in Montreal that has resulted in annual savings in the order of $110,800 and assisted management in its decision to invest in larger production equipment. The basic assumptions underlying EOQ models are reviewed and dealt with. For instance, an algorithm was devised to handle the peaks in the demand of many A class items. Following the implementation of this algorithm, buffer stocks were reduced signifi cantly while maintaining the same high levels of service.

Simulation study of a closed‐loop job shop

Journal of Operations Management 1982
This study investigates the behavior of a job shop depicted as an integral component of a firm. A market places demands for the firm's products by dynamically evaluating the organization's quoted delivery times and actual delivery performance. The closed‐loop model simulated in this study is described and the salient research results are reported. These experimental outcomes suggest that other conventional open‐loop job shop studies tend to neglect important interactions with factors external to the shop itself.

Goal programming applied to police patrol allocation

Journal of Operations Management 1982
This paper describes the development of a decision‐making methodology to aid the police patrol planner in resolving the patrol allocation problem. The methodology developed provides information to assist in two major decision areas: staff sizing and vehicle requirement schedules. This research uses a queuing based simulation model to derive expected service levels for a number of different performance measures. Given these results, tradeoff curves are mapped between specified performance measures and utilization rates of patrol vehicles. With this information the patrol planner specifies limiting levels for both performance measures and other managerial constraints which, in turn, are inputted into a goal programming algorithm to determine appropriate staff sizes and vehicle requirements. The primary output provided the patrol planner is the required amount of patrol vehicle hours to allocate to each watch per day per precinct in order to satisfy a designated set of performance measure levels and managerial constraints. The methodology presented in this research was developed in conjunction with the Columbus, Ohio, Police Department with data being provided by the Research and Planning Division.

Research issues for multi‐level lot sizing in MRP systems

Journal of Operations Management 1982
What lot size model(s) to use in a Material Requirements Planning (MRP) system is an unresolved and often debated issue. The concept of dependent demand, the complex network defined by the product structure, the dynamics of an operating MRP‐based system, and the subsequent use of the planned order release schedule by other company subsystems represent a totally new environment for making and managing lot size decisions. The purpose of this paper is to identify and briefly examine ten research issues related to lot sizing in a dependent demand product structure. These ten issues expand the solution space for lot sizing in an MRP‐based system compared to a reorder point based system. Areas for further research are suggested.

Sequential facility location with distance dependent demand

Journal of Operations Management 1982
Systems providing identical service to many population centers frequently face the issue of where to locate the next retail outlet, branch, store, etc. In such systems the demand for the facilities' service depends mainly on the distance between facilities and customers. It is assumed that there are already m facilities located on a network to respond to the demand at the nodes. The paper addresses the problems of finding a location on the network for the (m + 1)st facility corresponding to a given total expected demand and of determining which demand points will be served by which facility. Also the range of the total expected demand values that can be realized along each link in the m + 1 facility system is determined. Examples and a discussion of the results are provided.

Requirements planning systems in the health care environment

Journal of Operations Management 1982
An important problem confronting health care administration is cost containment in hospitals. Much of the current high costs can be traced directly to outdated procedures in materials management leading to waste, excessive inventory and unnecessary obsolescence of expensive short shelf life items. In this paper, we illustrate how a modern requirements planning system for surgical supplies was developed for a private hospital in Houston and used to effectively hold inventory levels to the minimum required to support a detailed schedule of surgical procedures. We also discuss some specific problems involved in the transfer of manufacturing technology to the hospital setting.

An experimental comparison of human schedulers and heuristic algorithms for the traveling salesman problem

Journal of Operations Management 1982
Vehicle routing and scheduling for laundry, courier, mail, and other service operations is a significant service industry problem. Several computer‐based heuristic algorithms have been developed to assist schedulers in developing efficient delivery (and pick up) vehicle routes. This paper reports the results of an experiment that compared the performance of inexperienced human schedulers and seven heuristic vehicle routing algorithms. A large set of traveling salesman test problems ranging in size from 10 to 80 customers was used in the experiment. The results of the experiment suggest that inexperienced, untrained human schedulers can consistently find traveling salesman solutions as good as or better than all but one of the seven heuristic algorithms tested (including the widely used ClarkeWright distance saved heuristic and the recently published largest‐angle insertion heuristic). The human schedulers found traveling salesman routes as good as the best heuristic tested (Lin's 3‐optimal) in 29 percent of the test problems. On average, the human schedulers' solution distances were only 2.8 percent above the 3‐optimal heuristic solution distances.