Emergency ambulance location using the contiguous zone search routine

Journal of Operations Management 1982
This paper reports on a study to select permanent emergency ambulance sites for the city of Austin, Texas. A facility location algorithm referred to as the contiguous zone search routine (CZSR) was developed to capitalize on the availability of a large data base of interzone travel times. This algorithm was coupled to an existing emergency medical system simulation model (CALL) to permit systematic evaluations of system performance directed at improving average response time. This combination of a simulation model and heuristicsearch routine permitted a degree of model realism not available with deterministic location algorithms currently in use. The output from the system simulation provided the city with a rich description of system performance to evaluate the desirability of locations selected by the heuristic search routine and a set of joint use sites selected by the city. A final analysis confined to the set of joint use sites identified, in priority order, twelve locations for EMS vehicles to be phased in over a five year period. The paper concludes with some observations on the process of public sector planning.

A lot sizing and sequencing algorithm for dynamic demands upon a single facility

Journal of Operations Management 1982
A heuristic algorithm is developed and applied to determine lot sizes and production sequence on a single facility. The various product demands are treated as deterministic and time varying (dynamic) over a finite planning horizon, such as that generated from a material requirements planning (MRP) system. In contrast to other approaches available, the algorithm considers the sequencing decision in each period by realistically assuming inventory holding cost occurrence in the period of production, and in addition, it is capable of considering set‐up times where such set‐up times consume available productive capacity. The ability to handle numerous products, and the capability of being able to specify maintenance time and holidays is an integral aspect of the algorithm. The results of an application of the algorithm in a medium size bearing company have shown very significant reduction in the controllable inventory holding cost while eliminating late deliveries. In an effort to cope with potential realistic schedule alterations, different solutions were developed for managerial evaluation providing greater flexibility but at a higher cost.

Capacity planning techniques for manufacturing control systems: Information requirements and operational features

Journal of Operations Management 1982
Substantial interest has been focused on techniques that determine the amount and timing of work center capacity to satisfy the master production schedule. Although several techniques have been developed for preparing work center capacity plans, very little analysis of the operational features and the application of these techniques has been reported. Four techniques, capacity planning using overall factors (CPOF), capacity bills, resource profiles, and capacity requirements planning (CRP), vary substantially in their complexity and the level of detail required to plan work center capacities. All four procedures require the use of the master production schedule to develop a capacity plan, but some have much more demanding data requirements. Important differences are the means by which capacity requirements are estimated by the techniques and the manner in which the bill of material, manufacturing lead time and inventory status information are incorporated into the capacity plan. The purpose of this paper is to describe the operational features of the four capacity planning techniques, the underlying data base requirements, and some key managerial issues in choosing among these techniques.

Case studies of computer integrated manufacturing systems: A view of uncertainty and innovation processes

Journal of Operations Management 1982
The adoption and implementation of new manufacturing processes are conceptualized in terms of coping with uncertainty. Manufacturing management opts for new equipment in order to reduce certain long run, nagging uncertainties, but at the expense of introducing considerable short run uncertainty associated with the innovation. Various coping strategies must be employed to deal with the situation. Our ideas are explored and developed by comparing how four firms in different countries adopted and implemented computer integrated manufacturing systems (CIM). Qualitative interviews with managers at different hierarchical levels and in different functions brought answers to the following questions: 1) What were the reasons for adopting a CIM? 2) What strategies were employed in order to facilitate the introduction of CIM's into the Firm? 3) What were the significant implementation problems that were encountered? In spite of cultural and other differences among the firms, coping with uncertainty explains significant aspects of their innovation processes.

Material requirements planning (MRP) and purchase discounts

Journal of Operations Management 1982
This paper reports the results of a simulation experiment that compares alternative procedures for determining purchase quantities in MRP systems when quantity discounts are available. The procedures are least unit cost (LUC), McLaren's order moment (MOM) and a “traditional” procedure that ignores the time‐phased information available from an MRP system. One of the factors in the experiment was requirement uncertainty, a factor heretofore not incorporated in MRP lot‐sizing research. The results of the experiment confirm MOM (and to a lesser extent LUC) as an effective lot‐sizing procedure. In addition, the work shows that the differences between the procedures tend to vanish as the amount of uncertainty in the requirements increases.

The impact of a rolling schedule in a multi‐level MRP system

Journal of Operations Management 1982
This paper presents a cost performance comparison of different lot‐sizing algorithms under multi‐level rolling schedule conditions. Most multi‐level studies have focused on fixed horizon problems, omitting an important characteristic of an operating MRP system. The results indicate that, under certain conditions, the computationally simple Silver‐Meal heuristic provides lower lot‐sizing costs than the Wagner‐Whitin algorithm. In addition, cost modifications are introduced which greatly enhance the multi‐level performance of these single‐level lot‐sizing heuristics.

A study of the MRP implementation process

Journal of Operations Management 1982
This paper reports on a large‐scale survey of companies involved in MRP implementation. Survey responses are used to develop a profile of problems typically encountered during the implementation process. Discriminant analysis is used to determine which of those problems, and additional factors, appear to affect the success or failure of MRP implementation. Finally, comparisons are made between the problems encountered during implementation and problems which were found to significantly discriminate between successful and unsuccessful MRP implementors.

The service sector: Challenges and imperatives for research in operations management

Journal of Operations Management 1982
The United States has undergone a transformation from an industrial society to the first postindustrial society. Consequently, the service sector has outstripped manufacturing in its contribution to the GNP and in employment. This paper discusses the challenges and imperatives for research in service operations management (SOM). Service operations have unique characteristics that must be considered in developing research strategies. Recent attempts at evolving a general theory of service organizations are reviewed, and it is suggested that these conceptual models provide a unifying framework for the study of SOM. Research in SOM requires a broad perspective that includes the customer and the interactions with other functional areas. It requires an integration of conventional production concepts with behavioral and marketing considerations.

Hierarchical integration in production planning: Theory and practice

Journal of Operations Management 1982
This paper discusses the issue of integrating various decision levels in hierarchical production planning systems. First the theory is briefly reviewed and then two case studies are presented. It is argued that it is not sufficient to have a good decision model at every level of the decision hierarchy. The different models should be carefully integrated. The potential problems resulting from a lack of integration are discussed. These problems are then illustrated in two case studies in order to be able to focus on actual managerial issues. It is shown how different decision levels supported by decision models were integrated in these two applications. Two important features are the crucial role of crossfunctional managerial committees in the integration process and the introduction of slack to avoid disaggregation problems. We do not claim to be exhaustive in presenting the problems related to integration nor do we claim that the solutions to the cases are the best possible ones. We do, however, hope that this paper motivates production managers to take a serious look at their hierarchical planning procedures.