A study of MRP benefits and costs

Journal of Operations Management 1981
This paper describes benefits and costs of MRP systems based on a large survey of MRP users. These users report they have achieved significant improvements in inventory turnover, delivery performance, and other benefits, and that further improvements are expected when their MRP systems are fully implemented. A series of regression models are also described in the paper which explain why some companies achieve more benefits from MRP than others. The models are not only fitted to the sample data, but they obtain good predictive results on a holdout sample. These models indicate that companies should stress a broad approach to implementation; there is no one overriding factor which guarantees MRP success.

The implementation of computer based systems

Journal of Operations Management 1981
The difficulty of implementing planned change in an organization is legend. In the last 20 years the implementation of computer based models and systems in particular has received a significant amount of attention in the form of hundreds of conference presentations, published case studies, and research reports. Yet, system implementation failures are still prevalent. p]This paper surveys the implementation literature primarily in three fields: management information systems, operations research/management science, and production‐inventory management. Common difficulties are identified and managerial proverbs, consultants' insights, statistically verified procedures, research conclusions. and other such documented wisdom for improving the chances of implementation are analyzed. p]A classification scheme is developed which divides this documented material into three diverse categories of pitfalls in implementation. These categories are then discussed from the perspective of providing managers with the information needed to analyze their own organization in terms of the likelihood of successfully implementing such computer based information systems as Material Requirements Planning (MRP).

An investigation of due‐date assignment rules with constrained tightness

Journal of Operations Management 1981 open access
We describe an experimental study of a single‐machine scheduling model for a system that assigns due‐dates to arriving jobs. The average lightness of the due‐dates is assumed to be governed by a policy constraint, which we link analytically to the parameters of the decision rules for due‐date assignment. We examine the use of different kinds of information in setting due‐dates, and we investigate the relationship between the due‐date assignment rule and the priority dispatching rule. On the basis of our results we identify situations in which the dispatching rule is critical to effective scheduling, others in which the due‐date assignment rule is critical, and still others in which the combination of the two rules is a critical design issue.

Precedence diagramming method: Some unusual characteristics and their implications for project managers

Journal of Operations Management 1981
The Precedence Diagramming Method, with its activity‐on‐node network and additional precedence relationships, offers an easier and more flexible network approach to modeling large projects than conventional PERT/CPM. But the new relationships (start‐to‐start and finish‐to‐finish constraints) can change some of the basic notions of critical path methodology, including the concept of a critical path itself. Calculations of early and late job start times are affected, along with total slack. Traditional methods of shortening a project by crashing jobs on the critical path can occasionally have anomalous effects. These little‐known characteristics of PDM are discussed, along with their implications for project managers, analysts, and other users of network methodology. Suggestions are made for improving the information available in computer printouts of PDM networks and for avoiding some of the anomalous effects. While PDM improves the project planner's ability to more simply and accurately model large projects, users should be aware of and able to effectively deal with its sometimes peculiar characteristics.

A heuristic solution procedure for the multi‐item, single‐level, limited capacity, lot‐sizing problem

Journal of Operations Management 1981
The problem to be considered is that of determining lot‐sizes for a group of products which are produced at a single workcentre. It is assumed that the requirements for each product are known, period by period, out to the end of some common time horizon. (A reasonable assumption in a Material Requirements Planning context when we are dealing with components of one or more other items already scheduled.) For each product there is a fixed setup cost incurred each time production takes place. Unit production and holding costs are linear. The time required to set up the machine is assumed to be negligible. All costs and production rates can vary from product to product but not with respect to time. In each period there is a finite amount of machine time available that can vary from period to period. The objective is to determine lot‐sizes so that 1) costs are minimized, 2) no backlogging occurs and 3) capacity is not exceeded. An exact solution to this complex problem is out of the question. Therefore, a simple heuristic has been developed which guarantees a feasible solution, if one exists. Results of a large number of test problems, including three supplied by industrial sources, are presented. The results indicate that the heuristic will usually generate a very good solution with a relatively small amount of computational effort.

An optimal inventory model where resupply is possible but uncertain

Journal of Operations Management 1980
A model is formulated for computing the optimal stock quantity of an item when resupply is possible but uncertain. The distinguishing feature of the model is that the optimal stock quantity calculation takes into account the cost of resupply and the probability of stock arriving by a specified mode of transport in time for issue to customers. The model is then applied to the problem of determining a preferred mode of transport for an assumed set of parameters.

Priority rules for check processing in multiple branch banking: An experimental analysis

Journal of Operations Management 1980
The check‐processing activity represents a major function in a commercial bank. If checks are quickly processed through the bank, then funds will be transferred to appropriate accounts and the bank will experience minimum float. This paper discusses the use of priority rules to maximize the dollar value of checks processed each day. A series of experiments are developed to test a set of priority rules (heuristics) under different operating conditions of check processing capacity, transit dollar levels, and branch characteristics. The results indicate that significant differences in performance are present for different rules. Also, the usefulness of some rules are dependent upon the commercial bank's operating characteristics, which has important implications for operating managers.

A requirements planning system for the Space Shuttle Operations schedule

Journal of Operations Management 1980
The National Aeronautics and Space Administration (NASA) is charged with developing a Flight Operations Planning Schedule for Space Shuttle Operations in the 1980s. During this decade, NASA plans to launch up to thirty space shuttle flights per year when the program reaches the mature phase. Traditional planning techniques for space flights (PERT‐type models) are inadequate for this task because of their inability to resolve conflicts arising from multiple demands for limited resources generated by numerous simultaneous projects (space flights). This paper describes a requirements planning system developed by the authors and adopted by NASA for this resource constrained multiple project scheduling problem.