A generalized lot sizing model for the process cycling problem

Journal of Operations Management 1980
Most scheduling/lot sizing models for the single‐machine problem assume that aggregate demand equals aggregate production; and that backorders are to be avoided. Where working inventories are low, the scheduler may wish to avoid short production runs and willingly incur some backorder penalties so as to increase the length of production runs and reduce setup costs per unit of time. The model proposed here identifies optimal lot sizes with respect to the backorder/setup cost relationships. Use of the model will result in an optimally balanced inventory even when aggregate inventory levels are changing.

A simulation study of smoothing constant limits for an adaptive forecasting system

Journal of Operations Management 1980
A set of computer simulation experiments were designed to investigate the use of Winters' forecasting models with the adaptive system of Trigg and Leach for short term forecasting. These two methods are popular and effective methods used for short term forecasting, but no systematic study of their joint usage has been reported. The results provide a set of smoothing constant limits which yielded accurate forecasts for the experimental conditions investigated. The experimental conditions were designed to cover as wide a range of situations as possible to maximize potential usefulness to practitioners.

A comparison of MRP lot sizing methods considering capacity change costs

Journal of Operations Management 1980
Capacity management is the planning and leveling of resources required (load) against the resources available (capacity). In this study, the lot size models used by Material Requirements Planning (MRP) had a major effect on the work center load profiles generated by Capacity Requirements Planning (CRP). Therefore, the selection of lot size models for MRP systems is an important decision for capacity management as well as materials management. The results of this study highlight the operating characteristics of specific lot size models considering setup, inventory carrying, and capacity associated costs. For example, the Economic Order Quantity model and the Lot‐For‐Lot model in certain situations can help level load. The Periodic Order Quantity and Least Total Cost models especially for high cost structure ratios tend to result in erratic and lumpy work center load profiles. The reasons for such operating behavior are examined. Other concepts and relationships important to capacity management are discussed.

Improving fuel utilization in steel mill operations using linear programming

Journal of Operations Management 1980
This paper describes the use of linear programming to improve the fuel utilisation at a major Midwestern steel mill. In particular, linear programming is used to determine an efficient fuel allocation plan for this steel mill, which reduces the total fuel costs for the steel mill operations. The efficient fuel allocation plan that is developed utilises two externally purchased fuels: natural gas and fuel oil, and two gases: blast furnace gas and coke plant gas, which are internally generated as natural by‐products of the production process. Test results from the application of the linear programming model are presented and discussed, and indicate that considerable cost savings can be achieved by utilizing a fuel allocation plan which more effectively utilizes the by‐product gases which are produced within the steel making process.

An expectancy‐equity model of productive system performance

Journal of Operations Management 1980
Although numerous behavioral variables (e.g., personality traits, incentives, nature of supervision) have documented relationships with quantity and quality of output, i.e., performance, in production systems, existing production and operations management models are dominated by technological variables. The article addresses three questions: 1. Which technological and behavioral variables influence productive system performance? 2. How do behavioral and technological variables interact? 3. Which variables are most important under different circumstances in determining performance? An expectancy‐equity model, patterned on research by Lawler [22], presents proposed relationships among variables in production systems, which are classified along a continuum from high to low process predictability. Predominant determinants of performance in various types of systems (e.g., continuous process, job shop, R&D project) are considered in light of the model. Implications for designers and analysts of productive systems and for future research are discussed.

Improving perishable product inventory management using goal programming

Journal of Operations Management 1980
The multiple objectives of perishable product inventory management are examined in this paper. These objectives include: (1) satisfying demand by carrying sufficient inventories, (2) holding down inventory carrying costs, (3) keeping the amount of product spoilage (outdating) at an acceptable level, and (4) maintaining quality by using the product while it is still fresh, and (5) keeping the cost of rotation low. Some of the above objectives are in conflict. Thus, certain redistribution policies may help attain one or more of these objectives to a greater extent. Redistribution involves the transfer of the product from outlets where demand is low to outlets where demand is high. A goal programming model for solving redistribution problems is presented. An example is provided and sensitivity analysis is performed in order to determine when redistribution is advantageous. Applicability of the model is discussed.

Designing production planning and control systems

Journal of Operations Management 1980
This paper presents a contingency model designed to explain aggregate differences in the specifications for production planning and control systems across firms. The specifications for a firm's system, stated broadly in terms of the investment in information processing systems and organizational integrativeness, are related to that firm's competitive strategy and environment. An analysis of data from a limited sample of companies, and a panel of managers, provides insights into the applicability of the concepts used in the model, and its potential usefulness.

A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning

Journal of Operations Management 1980
A hybrid model combining the critical path method (CPM) with material requirements planning (MRP) has been suggested (Aquilano) as a more robust method for scheduling projects and resources. The primary advantage of this technique is that resource acquisition lead times as well as inventory records are integrated into the process of computing the project schedule. This paper presents a set of formal CPM/MRP algorithms that may be used to compute the early and late start schedules as well as the critical sequence. A number of modifications have been incorporated into the CPM/MRP technique to improve the viability of CPM/MRP as a tool for application to actual project scheduling problems. A simple example project is used to demonstrate the CPM/MRP model. The CPM/MRP technique is designed to overcome a basic shortcoming of previously suggested project scheduling methodologies. CPM was initially designed to schedule projects subject to technological constraints only. Later, additional techniques were introduced to consider constraints upon various aspects of resource availability (Davis). None of the suggested techniques attempted to integrate resource acquisition lead time with the generation of requirements for resources. Obviously such a technique would require the integration of inventory records into the scheduling technique. The combination of CPM and MRP provides a possible vehicle for overcoming this drawback in CPM. Both CPM and MRP are linear models that generate schedules based upon precedence relationships. An integrated approach is useful since activities could be scheduled subject to information about the inventory position. An activity may be scheduled as soon as all resources are on hand. It is only delayed by those resources which must be acquired and activities which proceed it in the project network. CPM/MRP also shows promise as an aid to constrained resource scheduling since computations regarding resource availability are an integrated part of the technique. The effect of resource allocation decisions is immediately evident in the MRP‐type time phased records. Results of the tests run on short projects of up to 300 activities and resources have shown that the program does work satisfactorily. Execution time for a 300 item network tested was approximately ten seconds on a CYBER 175.

A classification and evaluation of research in operations management

Journal of Operations Management 1980
It is important that the first issue of a new journal devoted to research in a given subject area examine the general nature of research in the field at present, and indicate what type of research might be beneficially undertaken in the field in the future. It is also desirable for a new journal to consider the ways in which it will judge the general quality of its articles in the aggregate, relative to established journals in similar disciplines. That is, what criteria can and should be used, say five years hence to determine if the journal is a strong one? It is the purpose of this paper to consider these distinct, but interrelated questions. This will be done by classifying some recent OM research, commenting on what appear to be broad areas where more work might be done, and then suggesting some measures we might want to think about for evaluating papers published by the JOM in the future.