Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:

Work force scheduling for arbitrary cyclic demands

Journal of Operations Management 1981
The problem considered here is the determination of the minimum full‐time workforce and corresponding work schedule to meet arbitrary cyclic staffing requirements where all workers are idle either one or two consecutive periods per cycle. Specialized algorithms are developed which are less complex and consequently more efficient than existing algorithms. The new algorithms are also compared with alternative algorithms on the basis of slack dispersion which is a criterion that has not been previously considered in the literature. The results suggested the existence of a trade‐off between the execution efficiency of the algorithms and their slack dispersion characteristics. Some initial framework required for future research is also provided.

Merging prescriptive and behavioral approaches for office layout

Journal of Operations Management 1981
Various approaches have emerged for designing office layouts and for better understanding their impact on employee attitudes and performance. They can be broadly categorized as either being prescriptive or behavioral. Prescriptive approaches are a collection of solution procedures and algorithms aimed at designing layouts around work flows and managerial preferences. While assisting with the combinatorial difficulties in layout planning, little thought is given to how individuals are influenced by spatial arrangements. The behavioral approach, on the other hand. consists of various theories and empirical studies of how spatial arrangements impact employee satisfaction and motivation. However, they pay little attention to translating such insights into workable layouts. The purposes of this paper are threefold. First, the disparate approaches to office layout are critically reviewed. Second, a new theory of spatial arrangements is proposed and tested in an exploratory fashion. Third, suggestions are made on future research and how prescriptive models can be reformulated to better handle the behavioral aspects of office layout.

Operations change interactions in a service environment: Attitudes, behaviors, and profitability

Journal of Operations Management 1981
An attitudinal and behavioral change program was developed and implemented in a service operations function. Changes were (1) stabilizing operations management (reducing turnover) and (2) improving attitudes and behaviors of employees with strong union affiliations in a common carrier trucking terminal when compared to similar employees in a control terminal undergoing no planned change. Management turnover was reduced. Other results from the eighteen‐month longitudinal study indicated that employee attitudes in both groups remained negative toward work, management, and the company throughout the study period. Behaviors relating to attitudes — particularly turnover, absenteeism, and accident rates—improved at the experimental terminal, even though expressed attitudes remained negative. Operating efficiencies and profitability improved at the experimental terminal. It was found that these employees, pick‐up and delivery drivers, retain positive attitudes toward customers and customers the same toward them, in spite of the drivers' negative attitudes toward the company. The operative service employee appeared to discriminate between attitudes toward the company and the customer; the drivers' negative attiudes toward most everything (except the customer) not affecting the customer's perceptions of the driver or the company.

Simple methods for uncapacitated facility location/allocation problems

Journal of Operations Management 1981
Facility location/allocation problems are encountered in many different areas of management science. The methods presented in the literature are complex and are not easily understood by practitioners who are not trained in the techniques of optimization. Simple heuristic methods are presented in this article. The methods are developed for three different types of uncapacitated problems: (1) unlimited facility capacity with no fixed cost; (2) unlimited facility capacity with a fixed cost for assignment; (3) multiperiod problems. Examples are included to illustrate the basic methods.

An empirical analysis of job shop dispatch rule selection

Journal of Operations Management 1981
Job shop scheduling usually includes the process of selecting dispatch rules for loading shops with work. Traditionally, dispatch rules have been formed on the basis of processing time, operating time, or queueing order. A job shop scheduling model was developed to include external factors (such as due dates), internal factors (e.g., capacity), as well as influence factors (e.g., job status). Based on the model developed in this report a survey of industrial engineers, shop foremen, and production control supervisors was undertaken to determine what dispatch rules experienced job shop schedulers would select and if the selection process could be influenced by schedule conditions (status) or other organizational factors. Results suggest that schedulers may be influenced by other factors. This article suggests a model for further research with respect to job shop scheduling.

Estimating and auditing aggregate inventory levels at multiple stocking points

Journal of Operations Management 1981 open access
Relatively little attention has been given to methods for estimating and auditing distribution network inventories in the aggregate. This article shows that a simple polynomial equation whose coefficients can be determined by means of regression analysis techniques is a good, basic tool for estimating overall inventory levels and can be used to provide insight into the effectiveness of inventory control policies at different stocking points. It also serves as the basis for auditing and controlling current inventory policies on an ongoing basis. Tests of the model in a number of actual cases revealed a predictable association between the inventory policy being used and the coefficient values in the polynomial equation.

A study of MRP benefits and costs

Journal of Operations Management 1981
This paper describes benefits and costs of MRP systems based on a large survey of MRP users. These users report they have achieved significant improvements in inventory turnover, delivery performance, and other benefits, and that further improvements are expected when their MRP systems are fully implemented. A series of regression models are also described in the paper which explain why some companies achieve more benefits from MRP than others. The models are not only fitted to the sample data, but they obtain good predictive results on a holdout sample. These models indicate that companies should stress a broad approach to implementation; there is no one overriding factor which guarantees MRP success.

The implementation of computer based systems

Journal of Operations Management 1981
The difficulty of implementing planned change in an organization is legend. In the last 20 years the implementation of computer based models and systems in particular has received a significant amount of attention in the form of hundreds of conference presentations, published case studies, and research reports. Yet, system implementation failures are still prevalent. p]This paper surveys the implementation literature primarily in three fields: management information systems, operations research/management science, and production‐inventory management. Common difficulties are identified and managerial proverbs, consultants' insights, statistically verified procedures, research conclusions. and other such documented wisdom for improving the chances of implementation are analyzed. p]A classification scheme is developed which divides this documented material into three diverse categories of pitfalls in implementation. These categories are then discussed from the perspective of providing managers with the information needed to analyze their own organization in terms of the likelihood of successfully implementing such computer based information systems as Material Requirements Planning (MRP).

An investigation of due‐date assignment rules with constrained tightness

Journal of Operations Management 1981 open access
We describe an experimental study of a single‐machine scheduling model for a system that assigns due‐dates to arriving jobs. The average lightness of the due‐dates is assumed to be governed by a policy constraint, which we link analytically to the parameters of the decision rules for due‐date assignment. We examine the use of different kinds of information in setting due‐dates, and we investigate the relationship between the due‐date assignment rule and the priority dispatching rule. On the basis of our results we identify situations in which the dispatching rule is critical to effective scheduling, others in which the due‐date assignment rule is critical, and still others in which the combination of the two rules is a critical design issue.

Precedence diagramming method: Some unusual characteristics and their implications for project managers

Journal of Operations Management 1981
The Precedence Diagramming Method, with its activity‐on‐node network and additional precedence relationships, offers an easier and more flexible network approach to modeling large projects than conventional PERT/CPM. But the new relationships (start‐to‐start and finish‐to‐finish constraints) can change some of the basic notions of critical path methodology, including the concept of a critical path itself. Calculations of early and late job start times are affected, along with total slack. Traditional methods of shortening a project by crashing jobs on the critical path can occasionally have anomalous effects. These little‐known characteristics of PDM are discussed, along with their implications for project managers, analysts, and other users of network methodology. Suggestions are made for improving the information available in computer printouts of PDM networks and for avoiding some of the anomalous effects. While PDM improves the project planner's ability to more simply and accurately model large projects, users should be aware of and able to effectively deal with its sometimes peculiar characteristics.