Journal of Operations Management 1982
Systems providing identical service to many population centers frequently face the issue of where to locate the next retail outlet, branch, store, etc. In such systems the demand for the facilities' service depends mainly on the distance between facilities and customers. It is assumed that there are already m facilities located on a network to respond to the demand at the nodes. The paper addresses the problems of finding a location on the network for the (m + 1)st facility corresponding to a given total expected demand and of determining which demand points will be served by which facility. Also the range of the total expected demand values that can be realized along each link in the m + 1 facility system is determined. Examples and a discussion of the results are provided.

Requirements planning systems in the health care environment

Journal of Operations Management 1982
An important problem confronting health care administration is cost containment in hospitals. Much of the current high costs can be traced directly to outdated procedures in materials management leading to waste, excessive inventory and unnecessary obsolescence of expensive short shelf life items. In this paper, we illustrate how a modern requirements planning system for surgical supplies was developed for a private hospital in Houston and used to effectively hold inventory levels to the minimum required to support a detailed schedule of surgical procedures. We also discuss some specific problems involved in the transfer of manufacturing technology to the hospital setting.

An experimental comparison of human schedulers and heuristic algorithms for the traveling salesman problem

Journal of Operations Management 1982
Vehicle routing and scheduling for laundry, courier, mail, and other service operations is a significant service industry problem. Several computer‐based heuristic algorithms have been developed to assist schedulers in developing efficient delivery (and pick up) vehicle routes. This paper reports the results of an experiment that compared the performance of inexperienced human schedulers and seven heuristic vehicle routing algorithms. A large set of traveling salesman test problems ranging in size from 10 to 80 customers was used in the experiment. The results of the experiment suggest that inexperienced, untrained human schedulers can consistently find traveling salesman solutions as good as or better than all but one of the seven heuristic algorithms tested (including the widely used ClarkeWright distance saved heuristic and the recently published largest‐angle insertion heuristic). The human schedulers found traveling salesman routes as good as the best heuristic tested (Lin's 3‐optimal) in 29 percent of the test problems. On average, the human schedulers' solution distances were only 2.8 percent above the 3‐optimal heuristic solution distances.

Emergency ambulance location using the contiguous zone search routine

Journal of Operations Management 1982
This paper reports on a study to select permanent emergency ambulance sites for the city of Austin, Texas. A facility location algorithm referred to as the contiguous zone search routine (CZSR) was developed to capitalize on the availability of a large data base of interzone travel times. This algorithm was coupled to an existing emergency medical system simulation model (CALL) to permit systematic evaluations of system performance directed at improving average response time. This combination of a simulation model and heuristicsearch routine permitted a degree of model realism not available with deterministic location algorithms currently in use. The output from the system simulation provided the city with a rich description of system performance to evaluate the desirability of locations selected by the heuristic search routine and a set of joint use sites selected by the city. A final analysis confined to the set of joint use sites identified, in priority order, twelve locations for EMS vehicles to be phased in over a five year period. The paper concludes with some observations on the process of public sector planning.

A lot sizing and sequencing algorithm for dynamic demands upon a single facility

Journal of Operations Management 1982
A heuristic algorithm is developed and applied to determine lot sizes and production sequence on a single facility. The various product demands are treated as deterministic and time varying (dynamic) over a finite planning horizon, such as that generated from a material requirements planning (MRP) system. In contrast to other approaches available, the algorithm considers the sequencing decision in each period by realistically assuming inventory holding cost occurrence in the period of production, and in addition, it is capable of considering set‐up times where such set‐up times consume available productive capacity. The ability to handle numerous products, and the capability of being able to specify maintenance time and holidays is an integral aspect of the algorithm. The results of an application of the algorithm in a medium size bearing company have shown very significant reduction in the controllable inventory holding cost while eliminating late deliveries. In an effort to cope with potential realistic schedule alterations, different solutions were developed for managerial evaluation providing greater flexibility but at a higher cost.

Capacity planning techniques for manufacturing control systems: Information requirements and operational features

Journal of Operations Management 1982
Substantial interest has been focused on techniques that determine the amount and timing of work center capacity to satisfy the master production schedule. Although several techniques have been developed for preparing work center capacity plans, very little analysis of the operational features and the application of these techniques has been reported. Four techniques, capacity planning using overall factors (CPOF), capacity bills, resource profiles, and capacity requirements planning (CRP), vary substantially in their complexity and the level of detail required to plan work center capacities. All four procedures require the use of the master production schedule to develop a capacity plan, but some have much more demanding data requirements. Important differences are the means by which capacity requirements are estimated by the techniques and the manner in which the bill of material, manufacturing lead time and inventory status information are incorporated into the capacity plan. The purpose of this paper is to describe the operational features of the four capacity planning techniques, the underlying data base requirements, and some key managerial issues in choosing among these techniques.

Case studies of computer integrated manufacturing systems: A view of uncertainty and innovation processes

Journal of Operations Management 1982
The adoption and implementation of new manufacturing processes are conceptualized in terms of coping with uncertainty. Manufacturing management opts for new equipment in order to reduce certain long run, nagging uncertainties, but at the expense of introducing considerable short run uncertainty associated with the innovation. Various coping strategies must be employed to deal with the situation. Our ideas are explored and developed by comparing how four firms in different countries adopted and implemented computer integrated manufacturing systems (CIM). Qualitative interviews with managers at different hierarchical levels and in different functions brought answers to the following questions: 1) What were the reasons for adopting a CIM? 2) What strategies were employed in order to facilitate the introduction of CIM's into the Firm? 3) What were the significant implementation problems that were encountered? In spite of cultural and other differences among the firms, coping with uncertainty explains significant aspects of their innovation processes.

Material requirements planning (MRP) and purchase discounts

Journal of Operations Management 1982
This paper reports the results of a simulation experiment that compares alternative procedures for determining purchase quantities in MRP systems when quantity discounts are available. The procedures are least unit cost (LUC), McLaren's order moment (MOM) and a “traditional” procedure that ignores the time‐phased information available from an MRP system. One of the factors in the experiment was requirement uncertainty, a factor heretofore not incorporated in MRP lot‐sizing research. The results of the experiment confirm MOM (and to a lesser extent LUC) as an effective lot‐sizing procedure. In addition, the work shows that the differences between the procedures tend to vanish as the amount of uncertainty in the requirements increases.

The impact of a rolling schedule in a multi‐level MRP system

Journal of Operations Management 1982
This paper presents a cost performance comparison of different lot‐sizing algorithms under multi‐level rolling schedule conditions. Most multi‐level studies have focused on fixed horizon problems, omitting an important characteristic of an operating MRP system. The results indicate that, under certain conditions, the computationally simple Silver‐Meal heuristic provides lower lot‐sizing costs than the Wagner‐Whitin algorithm. In addition, cost modifications are introduced which greatly enhance the multi‐level performance of these single‐level lot‐sizing heuristics.