Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:

Time‐dependent demand in requirements planning: An exploratory assessment of the effects of serially correlated demand sequences on lot‐sizing performa

Journal of Operations Management 1985
The problem of determining the appropriate stock replenishment quantity within a time‐phased requirements planning environment has received considerable research attention in recent years. Relative performance characteristics of lot‐sizing policies have been assessed as a function of the cost structure, the demand pattern, the product structure, forecast error, the length of the planning horizon, and the interaction between replenishment quantities and sequencing decisions. In particular, the relationship between lot sizing behavior and variability in the requirements profile has been intensely investigated. However, despite these efforts, the empirical evidence linking lotsizing performance with demand variability remains inconclusive. This article suggests that, in part, some of the ambiguity in the literature may be an artifact of a failure to adequately control for other important dimensions of simulated demand sequences. The features that have been thought to describe “lumpy” requirements profiles are discussed and the characteristic of periodicity or time‐dependency in the demand entries is identified as a variable that has been insufficiently controlled in prior work. A reanalysis of the demand sequences originally published by Kaimann, and subsequently used in a number of comparative lot‐sizing studies, reveals that the patterns differ not only in variability as measured by the coefficient of variation, but also in terms of correlation structure as described by the autocorrelation function. Alternative methods for simulating demand sequences are reviewed and a correlation transfer technique, which has the capability to simultaneously control both the degree of variability and correlation, is suggested as an improved method for the generation of synthetic sequences of “lumpy” demand. Using this technique, five of Kaimann's original sequences are rearranged, resulting in three sets of sequences differing only in the strength of serial correlation. Four lot‐sizing procedures are applied to each of these sets to discern if the correlation structure has any appreciable effect on lot‐sizing performance. Results indicate that, on average, higher total inventory costs are experienced when the demand environment is characterized by randomness. Economic order quantity and part‐period balancing achieve lowest average costs when confronted with highly autocorrelated demand or patterns of few runs; conversely, minimum cost per period and Wagner‐Whitin perform best under conditions of many runs. Both economic order quantity and part‐period balancing perform most favorably in comparison to Wagner‐Whitin when runs are few. In addition, there appears to be a potential interaction between the level of demand variability and the degree of serial correlation. This finding is somewhat disconcerting since high variability demand sequences used in some prior research were also characterized by relatively high levels of autocorrelation; hence it becomes most difficult to identify and decompose the unique influences of each demand pattern dimension on lot‐sizing behavior. Because of this phenomenon, it is suggested that future studies direct greater attention to the demand simulating methodology than has heretofore been accorded.

A heuristic algorithm for capacity sensitive requirements planning

Journal of Operations Management 1985
Available lot sizing rules for use in MRP (Material Requirements Planning) systems ignore capacity limitations at various work centers when sizing future orders. Planned order releases are instead determined by the tradeoff only between the item's set up and inventory holding costs. This limitation can cause unanticipated overloads and underloads at the various work centers, along with higher inventories, poorer customer service, and excessive overtime. This research explores one way to make MRP systems more sensitive to capacity limitations at the time of each regeneration run. A relatively simple heuristic algorithm is designed for this purpose. The procedure is applied to those planned order releases that standard MRP logic identifies as mature for release. The lot sizes for a small percentage of these items are increased or decreased so as to have the greatest impact in smoothing capacity requirements at the various work centers in the system. This algorithm for better integrating material requirements plans and capacity requirements plans is tested with a large scale simulator in a variety of manufacturing environments. This simulator has subsequently undergone extensive tests, including its successful validation with actual data at a large plant of major corporations. Simulation results show that the algorithm's modest extension to MRP logic significantly helps overall performance, particularly with customer service. For a wide range of test environments, past due orders were reduced by more than 30% when the algorithm was used. Inventory levels and capacity problems also improved. Not surprisingly, the algorithm helps the most (compared to not using it at all as an MRP enhancement) in environments in which short‐term bottlenecks are most severe. Large lot sizes and tight shop capacities are characteristic of these environments. The algorithm works the best when forecast errors are not excessive and the master schedule is not too “nervous.” This proposed procedure is but one step toward making MRP more capacity sensitive. The widely heralded concept of “closed‐loop” MRP means that inventory analysts must change or “fix up” parts of the computer generated material requirements plan. What has been missing is a tool for identifying the unrealistic parts of the plan. Our algorithm helps formalize this identification process and singles out a few planned order releases each week. This information comes to the analyst's attention as part of the usual action notices. These pointers to capacity problems go well beyond capacity requirements planning (CRP) and would be impossible without computer assistance. Our study produced two other findings. First, short‐term bottlenecks occur even when the master production schedule is leveled. The culprits are the lot sizing choices for items at lower levels in the bills of material. “Rough‐cut” capacity planning, such as resource requirements planning, therefore is not a sufficient tool for leveling capacity requirements. It must be supplemented by a way to smooth bottlenecks otherwise caused by shop orders for intermediate items. Second, the disruptive effect of large lot sizes is apparent, both in terms of higher inventories and worse customer service. Large lot sizes not only inflate inventories, but paradoxically hurt customer service because they create more capacity bottlenecks. The only reason why management should prefer large lot sizes is if set‐up times are substantial and cannot be efficiently reduced. This finding is very much in step with the current interest in just‐in‐time (JIT) systems.

A vacation scheduling algorithm for military flight crews: Maximizing satisfaction while maintaining military preparedness

Journal of Operations Management 1985
This article develops a quantitative method of assigning leave to crewmembers in an operational military flying squadron. The objective of the assignment process is to maximize crew preferences. This objective is limited by manning constraints which limit the number of crews that can be on leave at the same time. The basis of the assignment process is a point system which allows each crew to bid for the periods they prefer. The periods are then assigned to the highest bidder. In this way, each crew is assured of an influence in the leave assignment process, and the results are entirely in the hands of the crews themselves. The method now used to assign leave was developed and refined during a three year period from 1981 to 1983. The 1983 method includes a two‐phase partially open bidding system. In Phase I, crews signed up on a posted calendar for the periods they wanted, but they did not assign points to the periods. During this phase, crews could change their period request as they saw what other crews requested. This allows crews to sequence themselves to avoid conflicts. At the end of Phase I, the juggling process was closed, and crews could no longer change their period request. Crews were given a week between the close of Phase I and the start of Phase II to see how many other crews they were competing with. Then in Phase II, they submitted their points via closed bid. This system was very effective in both distributing the demand and preventing “gaming.” There was a strong disincentive from changing a period request at the last minute. If they did, the competition had a week to see whom they were competing with and could then bid accordingly. It was to everyone's advantage to avoid competition. Statistical analysis and positive feedback from crews and scheduling personnel have proven this method to be significantly superior to the former system.

Optimal inventories for repairable redundant systems with aging components

Journal of Operations Management 1985
Complex systems that are required to perform very reliably are often designed to be “fault‐tolerant,” so that they can function even though some component parts have failed. Often fault‐tolerance is achieved through redundancy, involving the use of extra components. One prevalent redundant component configuration is the m‐out‐of‐n system, where at least m of n identical and independent components must function for the system to function adequately. Often machines containing m‐out‐of‐n systems are scheduled for periodic overhauls, during which all failed components are replaced, in order to renew the machine's reliability. Periodic overhauls are appropriate when repair of component failures as they occur is impossible or very costly. This will often be the case for machines which are sent on “missions” during which they are unavailable for repair. Examples of such machines include computerized control systems on space vehicles, military and commercial aircraft, and submarines. An interesting inventory problem arises when periodic overhauls are scheduled. How many spare parts should be stocked at the maintenance center in order to meet demands? Complex electronic equipment is rarely scrapped when it fails. Instead, it is sent to a repair shop, from which it eventually returns to the maintenance center to be used as a spare. A Markov model of spares availability at such a maintenance center is developed in this article. Steady‐state probabilities are used to determine the initial spares inventory that minimizes total shortage cost and inventory holding cost. The optimal initial spares inventory will depend upon many factors, including the values of m and n, component failure rate, repair rate, time between overhauls, and the shortage and holding costs. In a recent paper, Lawrence and Schaefer [4] determined the optimal maintenance center inventories for fault‐tolerant repairable systems. They found optimal maintenance center inventories for machines containing several sets of redundant systems under a budget constraint on total inventory investment. This article extends that work in several important ways. First, we relax the assumption that the parts have constant failure rates. In this model, component failure rates increase as the parts age. Second, we determine the optimal preventive maintenance policy, calculating the optimal age at which a part should be replaced even if it has not failed because the probability of subsequent failure has become unacceptably high. Third, we relax the earlier assumption that component repair times are independent, identically distributed random variables. In this article we allow congestion to develop at the repair shop, making repair times longer when there are many items requiring repair. Fourth, we introduce a more efficient solution method, marginal analysis, as an alternative to dynamic programming, which was used in the earlier paper. Fifth, we modify the model in order to deal with an alternative objective of maximizing the job‐completion rate. In this article, the notation and assumptions of the earlier model are reviewed. The requisite changes in the model development and solution in order to extend the model are described. Several illustrative examples are included.

Planning a successful robotics implementation

Journal of Operations Management 1985
Technological advances in areas such as machine vision systems are accelerating the penetration of industrial robots into the U.S. workplace. Recent forecasts suggest that there may be as many as 315,000 robots in use in American industry by the close of this century. Affected managers need to design a robotics planning and implementation process compatible with their organizational climate and strategic plan. Based on a series of preliminary discussions with trade specialists, consultants, and vendors, 50 industrial firms were contacted to determine if they had implemented robotics technology. Of the 23 that had robotics on‐line, nine agreed to participate in the study. All participants were personally interviewed using an open‐ended questionnaire. The respondents were management or engineering personnel directly involved in the implementation process within their firm. After obtaining a description of the affected manufacturing process, the interviews focused on the factors influencing the adoption decision. Key data collected included the characteristics of the planning and adoption cycle, as well as the favorable impacts resulting from the implementation. Several important personnel‐related issues, such as change in operator skill level, were discussed at length. The similarities of the respondents' planning and adoption cycles included the following: Improving the firm's competitive position was consistently cited as the principal reason for the implementation. Top management both initiated and supported the introduction in all cases. The adoption cycle focused on a gradual implementation. A robotic form consisting of an arm attached to a stationary base was the only type implemented. The workers' response was judged to be positive, although several different patterns emerged. All made extensive use of vendor training. The two motivating factors for the implementation were a desire to either update process technology or expand production capacity. All of the replaced operators were cross‐trained in other production areas or utilized as process monitors. Quality improvement was mentioned as a benefit by seven respondents; the remaining two use robots exclusively for loading/unloading. A diverse set of other benefits was described, while the financial payback averaged one and one‐half years for the five reporting firms. Selected technical implementation factors were also collected and analyzed. For example, eight respondents retrofitted the robotics technology, while seven required either upgrading or downgrading the robots' capabilities to better match the users' needs. The two respondents that did not support an inhouse awareness program did not have any human interfaces with the robots. The only respondent who did not maintain an ongoing evaluation of the new technology was the lone participant who decided against any future implementations. The analysis of the data collected lead to a series of management guidelines for planning a successful robotics implementation. These guidelines include: the need for an automation strategic plan, top management interest and support, a gradual implementation process, monitoring affected personnel, and an information system for planning and control.

Comparison of exact and approximate methods of solving the uncapacitated plant location problem

Journal of Operations Management 1985
This study was prompted by a recently published article in this journal on facility location by D. R. Sule. We show that the claim made by Sule of a novel and extremely simple algorithm yielding optimum solutions is not true. Otherwise, the algorithm would represent a breakthrough in decision‐making for which a number of notoriously hard problems could be efficiently recast as location problems and easily solved. In addition, several variants of common location problems addressed by Sule are reviewed. In the last twenty years, many methods of accurately solving these problems have been proposed. In spite of their increased sophistication and efficiency, none of them claims to be a panacea. Therefore, researchers have concurrently developed a battery of fast but approximate solution techniques. Sule's method was essentially proposed by Kuehn and Hamburger in 1963, and has been adapted many times since. We exhibit several examples (including the one employed by Sule) in which Sule's algorithms lead to nonoptimal solutions. We present computational results on problems of size even greater than those utilized by Sule, and show that a method devised by Erlenkotter is both faster and yields better results. In a cost‐benefit analysis of exact and approximate methods, we conclude that planning consists of generating an array of corporate scenarios, submitting them to the “optimizing black box,” and evaluating their respective merits. Therefore, much is to be gained by eliminating the vagaries of the black box—that is, by using an exact method—even if the data collection and the model representation introduce sizable inaccuracies. Ironically, large problems (those that typically require most attention) cannot be solved exactly in acceptable computational times. Pending the imminent design of a new generation of exact algorithms, the best heuristics are those that guarantee a certain degree of accuracy of their solutions.

Maintenance management: Keeping up with production's changing trends and technologies

Journal of Operations Management 1985
Current trends in manufacturing have led to reduced levels of work‐in‐process inventory and increased levels of automation and machine complexity. These changes have two important implications for maintenance management. First, machine breakdowns not only cause a loss of output from the down machine, but also result in lost production on downstream machines. This occurs because of the elimination of buffer stock between workstations. Second, the gap between the technological expertise of the operators and the technological sophistication of their machines has widened. This gap decreases the ability of operators to make adjustments and minor repairs to their own machines. These two factors cause an increase in maintenance costs associated with machine downtime and maintenance labor. Historically, the proportion of preventive and corrective maintenance has attempted to balance these costs. As buffer stock is reduced and more machines are coupled, the costs of downtime will increase, increasing the need for preventive maintenance and decreasing its cost compared to the cost of lost production. Increases in the use of computer‐based planning systems have resulted in the development of computerized preventive maintenance systems that have proven to be successful in planning for maintenance labor and materials. Integrating planning methods with corrective maintenance tasks will help reduce breakdowns, make more efficient use of maintenance craft labor, and provide information for inventory control of maintenance, repair, and operating (MRO) materials. This article examines methods of reducing machine downtime costs, maintenance labor costs, and MRO inventory costs in today's changing production environment. Techniques for reducing these costs are explored in the areas of maintenance planning, maintenance methods improvement, and MRO inventory control.

Explaining productivity differences in North Carolina factories

Journal of Operations Management 1985
Using detailed survey data collected from 95 large factories in North Carolina, this article examines the reasons why some factories are more productive than others. Six distinct measures of productivity are used as independent variables in the regression analyses reported. The results suggest five major themes that are shared by the most productive plants: simpler flow of materials through the process, valuing people, attending to quality, investing in hardware, and accounting for the industry's productivity growth. Several factors such as size and unionization are of no apparent importance to an explanation of cross‐factory productivity differences.