The area of maintenace management has been placed under increasing pressure because of changes in the manufacturing production planning and control systems. In the last few years plant management has been asked to respond to productivity and quality challenges unmatched in business history. The maintenance department plays an important, indeed vital, role in the attainment of improved levels of productivity and quality. This article examines the relationship between production and maintenance management systems. A conceptual model is developed that integrates the preventive and corrective aspects of maintenance planning with the priority and capacity activities of the production planning system. The model assists management in scheduling maintenance craft labor for additional efficiency and effectiveness.
Just‐in‐time (JIT) manufacturing systems have found wide acceptance in the automotive industry as well as in other industries such as electronic assembly. One of the key features of JIT systems is frequent reliable deliveries from local vendors. This article considers two major points related to managing inbound transportation from these local vendors. The first point is that vendor delivery uncertainties can be reduced if the JIT manufacturer takes over the responsibility for inbound logistics from all JIT vendors. In other words, we are suggesting that the manufacturing firm (vendee) pick up raw materials and purchased parts from its vendors rather than having the vendors deliver. The second major point is that a simple economic analysis and a computer‐based decision support system (like that we propose in this article) could be used to help schedule the JIT pickups. The article begins with a description of why deliveries are critical in the JIT environment and why vendee pickup from local vendors can be a better alternative than vendor delivery. When a manufacturer manages its own inbound local deliveries it benefits from more timely information on upsets, reduced transportation costs, reduced transaction costs, and most importantly, reduced uncertainty in deliveries. We then turn to a model for how to schedule JIT pickups. This model addresses the following “JIT Vendor Pickup Problem”: For a given number of vehicles with limited capacity, find a one‐week JIT vendor pickup schedule that will minimize the total incremental carrying, travel, and pickup costs subject to the constraint that the vendee does not run out of any item from any vendor. In the above problem definition, the demand rates for all items are assumed to be constant over the short term. This model can be imbedded in a computer‐based decision support system to facilitate the daily scheduling of the pickups from the vendors. In the conclusion, we deal with the expected benefits to the vendee for managing its own incoming JIT pickups and then propose a model that could be used to implement this concept.
Over the last several years expert systems (ES) have gained almost sensational interest. Within business administration, production management might be one of the most fruitful application areas for ES. There already exist a number of interesting pilot systems, and reports of research projects are beginning to appear in the literature. The main goal of this study is to identify systematically those areas in production management where an ES approach might be most promising. This is important to both researchers and practitioners because it helps pinpoint where research and development resources would be best allocated. In this article the authors provide a taxonomy for production management activities. They then combine this taxonomy with a well‐known list of eight “expert tasks” to provide what they call an “applications map” to guide the discussion. After discussing existing research efforts and potential production management applications of expert systems, the authors employ a Likert scoring procedure to quantify their subjective ratings as to problem importance, potential for improved solution, and ease of development, for expert systems development efforts in a given production management decision situation. One conclusion here is that the applicability of expert systems to production management appears to be broadly based. This is particularly true for what the authors have labeled as “technological” activities. An interesting finding is the apparent lack of applicability of expert systems to inventory management. The authors found no existing system or research proposals applying expert systems to inventory management. Finally, systems that combine technological with logistical knowledge seem to be a fertile (but difficult) application area for ES.
Flexible manufacturing systems (FMS) increase the efficiency of operations by improving cost, quality, and lead time while decision support and expert systems (DSS&ES) improve the effectiveness of manufacturing by assisting the decision maker in coordinating all the elements and increasing the overall utilization of the factory, particularly in managing a complex system of flexible manufacturing. This article surveys a number of available decision support and expert systems applications in flexible manufacturing after reviewing the features of each one and then proposes additional potential applications. It appears that what is holding back the widespread use of FMS is not the technology, but is some management issues. Application of DSS&ES enables a manager to obtain a full flexibility of equipment in terms of machine flexibility, product flexibility, process flexibility, operation flexibility, routing flexibility, volume flexibility, expansion flexibility, and production flexibility. Many decisions are made in planning and operating FMS that can be categorized into three classes of strategic, tactical, and operational decisions. Each class can be further categorized into structured, semistructured, and unstructured decisions. The article provides examples of FMS decision in each of nine groups and show that use of DSS&ES can be productive. Illustrative cases are categorized into (1) DSS in FMS, (2) DSS in related manufacturing operations, (3) ES in FMS, and (4) ES in related manufacturing operations. The cases described include ICAM, REACT, KEE, PADMS, IMS, FADES, GARI, TOM, ISIS, and GENPLAN. The article finally provides hints for successful DSS and ES implementation. Subjects include getting management involved, choosing a key application, manage vendor involvement, paying attention to maintenance, assigning qualified personnel, paying attention to training, and always reviewing the results. FMS is basically a computer‐based system and so are DSS and ES. There is an increased trend of integrating independent computer‐based systems to take advantage of the possible synergy of such integration. At present, there is only a little evidence of DSS and/or ES applications in FMS. However, there is increasing evidence of applications in related manufacturing areas. Furthermore, the planning and operations of FMS require considerable expertise; DSS and ES techniques are aimed at supporting or even replacing such expertise. Therefore, it seems that there is a considerable potential for further application of DSS and ES in FMS.
In this article, we study production planning for a rolling horizon in which demands are known with certainty for a given number of periods in the future (the forecast window M). The rolling horizon approach implements only the earliest production decision before the model is rerun. The next production plan will again be based on M periods of future demand information, and its first lot‐sizing decision will be implemented. Six separate lot‐sizing methods were evaluated for use in a rolling schedule. These include the Wagner‐Whitin algorithm, the Silver‐Meal heuristic, Maximum Part‐Period Gain of Karni, Heuristics 1 and 2 of Bookbinder and Tan, and Modification 1 to the Silver‐Meal heuristic by Silver and Miltenburg. The performance of each lot‐sizing rule was studied for demands simulated from the following distributions: normal, uniform (each with four different standard deviations); bimodal uniform (two types); and trend seasonal (both increasing and decreasing trends). We considered four values of the setup cost (leading to natural ordering cycles in an EOQ model of three, four, five, and six periods) and forecast windows in the range 2 ⩽ M ⩽ 20. Eight 300‐period replications were performed for each combination of demand pattern, setup cost, and lot‐sizing method. The analysis thus required consideration of 2304 300‐period replications (6 lot‐sizing methods × 12 demand patterns × 4 values of setup cost × 8 realizations), each of which was solved for nineteen different values of the forecast window M. The performance of the lot‐sizing methods was evaluated on the basis of their average cost increase over the optimal solution to each 300‐period problem, as though all these demands were known initially. For smaller forecast windows, say 4 ⩽ M ⩽ 8, the most effective lot‐sizing rules were Heuristic 2 of Bookbinder and Tan and the modified Silver‐Meal heuristic. Rolling schedules from each were generally 1% to 5% in total cost above that of the optimal 300‐period solution. For larger forecast windows, M ⩾ 10 or so, the most effective lot‐sizing method was the Wagner‐Whitin algorithm. In agreement with other research on this problem, we found that the value of M at which the Wagner‐Whitin algorithm first becomes the most effective lot‐sizing rule is a decreasing function of the standard deviation of the demand distribution.
This article presents a model for scheduling activities that are required to manufacture a product batch in a multistage process. The activities include setups, operations, and load movements between operations. In this model, setups may or may not require a unit from the preceding operation; each operation must be performed continuously on the batch once it has started, and capacity constraints apply to transportation activities. Within this context, two productivity‐related objectives are sought. The primary objective is to minimize the total production time for the batch; the secondary is to minimize the number of load movements. Considering the capacity constraints, a maximum number of units per load is specified for each “vehicle” and one vehicle is dedicated to each transportation activity. The simplicity of the vehicle restriction facilitates the examination of scheduling interactions among activities, and the results of the research into this model may serve as a foundation for treating more general representations of capacity constraints. The model is used to investigate the scheduling implications of capacity‐constrained load movements. It brings into focus interactions between these movements and the other activities in the process. After each operation, units must be grouped and moved in the fewest loads that permit the succeeding operation to begin as soon as possible, while observing setup and continuity requirements for this operation. Further, the departure times of loads depend on the availability of units and the vehicle. The formation of loads that must conform with the vehicle's capacity limit affects the times at which the loads are ready for movement, while the scheduling of previous movements from the operation affects the times at which the vehicle is available. A procedure is developed for scheduling activities that have this complex set of interactions. Computational requirements on test problems indicate that practical‐sized applications can be handled with this procedure. These applications would be designed to assist in making production planning decisions by experimenting with factors such as vehicle capacity limits and sequencing of operations to determine their effect on production time requirements and numbers of load movements. The article develops a branch‐and‐bound routine to solve subproblems of scheduling transportation activities. The efficiency of this routine that results from exploiting the specific structure of the subproblems is critical for the success of the overall procedure. While the subproblems can be solved as zero‐one mixed‐integer programs, this approach is too computationally burdensome for all but the smallest of problems.
Many factory managers are hesitant about implementing a just‐in‐time system due to concern about the dip in productivity that occurs. Here, a simple analytic model is used to study the trade‐off between disruption and learning/improvement on a production line. While simple, the model is shown to capture many of the effects of just‐in‐time mentioned in the literature. Using insights from the model, an attempt is made to identify those factors to which successful implementation of just‐in‐time is most sensitive.
Group technology is a manufacturing philosophy that attempts to provide some of the operational advantages of a line layout while maintaining some of the strategic advantages of the job shop layout. In designing a productive process that will adopt this manufacturing strategy, one of the primary problems encountered is the formation of component families and production cells. The production cell is a group of machines or processes of functionally dissimilar types that are placed together and dedicated to the manufacture of a specific range of component families. Several researchers in operations management have proposed methods of forming production cells and component families. These methods differ in terms of information requirements and also in terms of the final cell design. Furthermore, the objectives for each method are quite different and it thus seems that the focus has been on the method rather than its appropriateness in a particular situation. This article reviews some of the most publicized methods of group formation and analyzes the type of cells that could be formed using these methods. Subsequently, an evaluative framework is presented where the relative advantages of each type of production cell are discussed in terms of several strategic and operational factors. This framework is of particular use as it highlights the fact that in implementing a cellular manufacturing system, most organizations will face a trade‐off of strategic and operational “costs.” Finally, the appropriateness of the cell types with respect to the degree of customer interaction is also discussed.
Lead times in MRP systems represent the planned amount of time allowed for orders to flow through the manufacturing system. Setting lead times is a major issue in the operation of MRP systems. There exists, however, very little documentation on just how lead times should be set. This study examines the effects lead times have on MRP‐based manufacturing logistics systems. In particular, it examines the effects that lead times have on backlogs, order tardiness, and finished component inventories. A major finding is that changes to the level of planned lead times have both transient and steady state effects that may not necessarily operate in the same direction. A simple methodology is presented for setting the level of planned lead times when the criterion is finished component inventory.
Material requirements planning (MRP) is a planning and information system that has widespread application in discrete‐parts manufacturing. The purpose of this article is to introduce ideas that can improve the flow of material through complex manufacturing systems operating under MRP, and that can increase the applicability of MRP within diverse manufacturing environments. MRP models the flow of material by assuming that items flow from work station to work station in the same batches that are used in production. That is, once work starts on a batch of a certain item at a certain work station, the entire batch will be produced before any part of the batch will be transported to the next work station on its routing plan. Clearly, efficiency can be increased if some parallelism can be introduced. The form of parallelism investigated here is overlapping operations. Overlapping operations occurs when the transportation of partial batches to a downstream work station is allowed while work proceeds to complete the batch at the upstream work station. The potential efficiencies to be gained are the following: Reduced total lead time Reduced work‐in‐process inventory Reduced floor space requirements Reduced size of transfer vehicles Additional costs may accrue through additional cost of transportation of partial batches and through additional costs of control. Some MRP software vendors provide the data processing capability for overlapping operations. However, the user is given little or no guidance on overlapping percentages or amounts. It is our intent to provide a simple, robust technique to MRP users who would like to overlap operations and gain some or all of the above efficiencies. An optimal lot‐sizing technique is derived by considering a generic two work station segment of a manufacturing system. Under the assumptions of constant demand and identical production rates, a cost function that considers setup costs, inventory holding costs and transportation costs is derived. This cost function is minimized subject to the constraint that the production batch is an integer multiple of the transfer batch. We solve for the optimal production batch, the optimal transfer batch, and the integer number relating them. Solutions are obtained as closed form, easy to‐evaluate formulas. By introducing more parallelism, overlapping operations can reduce lead time. However, this will not happen without modification of MRP logic to accommodate such reduced lead time. We derive a formula that shows how a significant lead time compression can easily be obtained and implemented in MRP. We consider an example to illustrate the application of the technique on typical data from the electronics industry. The outcome showed a cost savings of approximately 22.5% over the standard MRP approach. Overlapping operations allows the applicability of MRP to an increasing number of situations that are not modeled faithfully by conventional MRP logic. Three such situations that occur often are the following: Limited floor space prohibits storage of production batches in work station output buffers. Limited size of transfer vehicles dictate that several transfers should be planned. Lead time requirements prohibit nonoverlapped operations. Our analysis suggests how to accommodate these difficult practical situations into MRP. Overlapping operations in material requirements planning provides an enhancement that allows wider applicability, shortened lead times, and lower total costs. It may be applied selectively to any two work stations where it is deemed appropriate. Due to the structure of the cost function, it is possible to make the transfer lot‐sizing decisions independent of the production lot‐sizing decisions. Therefore, significant improvements can be made through overlapping with minimum disruption to the existing MRP system machinery. It is our conviction that overlapping operations is an important concept that can and will impact MRP. We suggest the approach presented here as a systematic way to implement overlapping.