Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:

An effective mixed‐model assembly line sequencing heuristic for just‐in‐time production systems

Journal of Operations Management 1993
The commonly accepted objective of sequencing a mixed‐model assembly line for a Just‐In‐Time (JIT) production system is to keep part usage rates at the assembly line close to constant. Sumichrast and Russell evaluated four existing sequencing methods and showed that the best method in achieving this objective is Miltenburg's algorithm 3 using heuristic 2 (M‐A3H2). This paper presents a much simpler heuristic procedure compared to M‐A3H2. The experiment on 9 problem sets conducted by Sumichrast and Russell is repeated for the new heuristic procedure and M‐A3H2. The results show that the new heuristic procedure is as good as M‐A3H2 in solution quality regarding the mean squared and absolute deviations and much more efficient in computation time. It is further noticed that the computation time required by M‐A3H2 increases much faster than the new heuristic procedure as the number of products increases. Nevertheless, the most important benefit of this new heuristic procedure is its simplicity which should make it very desirable for practitioners.

The relative significance of forecast errors in multistage manufacturing

Journal of Operations Management 1993
It is intuitive that controlling forecast errors should result in better customer service and lower inventories. But forecast errors come from various sources. Multistage manufacturing experiences supply and lead‐time uncertainties as well as demand uncertainties, and manufacturing has more than one lever to pull when addressing these uncertainties. The relationship of forecast errors to manufacturing performance is not clear. Furthermore, the pursuit of forecast accuracy may not be the best use of managerial resources. In this study, using a many‐factored manufacturing simulation, we examine two components of forecast errors, the mix of special and standard products, lot‐sizing, and buffering policies as they affect inventories and customer service. Although most conclusions are situation dependent, reducing forecast bias is shown to be much preferred to reducing forecast variability, bias management is more important to on‐time delivery than to inventory reduction, and the value of such reductions is particularly important in situations where there are large lot‐sizes and small buffers.

Orderbook models for priority management: A taxonomy of data structures

Journal of Operations Management 1993
In the 1980's a research team from London Business School designed and installed information systems in a number of UK batch manufacturing companies. The companies had little formal manufacturing planning and control (MPC), and the volatile market and complex production situation of each led to a highly rapid response orientation we characterize as priority management. This style was appropriate for the situation of these companies and the systems designed for them were intended to support their approach, not to replace it with a more formal prescriptive system. After initial projects with no preconceived framework, the focus emerged on the appropriate data structure for order progressing — or order‐book model — as the central need of such companies. Orderbook models were then designed for all subsequent companies (17 in total), many of whom still use these models. The article describes the preconditions for priority management by summarizing the sources of complexity — variety, variation, and volume — found in the collaborating companies. These conditions preclude tight formal planning and control, and require data structures which give vision over the relative merits of different priority choices. The orderbook models, designed to give such vision, are not purely company specific but can be classified into types. The classification scheme has three main dimensions: capacity commitment (make‐to‐stock, etc), product structure/assembly form, and the style of progressing orders through all their different stages. The options within each dimension give a total of 48 possible configurations of orderbook model. These concepts were developed using action research: practical application came first, and theory was developed by generalizing from the experience. This is a non‐traditional research methodology in operations management (OM), but will in the future be increasingly important if OM research is to meet the needs of practitioners for relevance as well as the needs of the research community for rigor.

A comment on Gerchak and Gupta's “On apportioning costs to customers in centralized continuous review inventory systems”

Journal of Operations Management 1993
In their recent article, Gerchak and Gupta discuss four different schemes for allocating joint inventory control costs. They demonstrate the benefits of consolidating inventories and note that allocating costs in proportion to the customers' stand‐alone costs ensured that each customer was always better off as part of the group. Their basis of allocation does not always distribute the benefits of consolidation; some customers may be worse off when new customers join up. This note applies the theory of the core from game theory to find a region of “fair” cost allocations in which no one is worse off after consolidation. The Shapley Value is computed as the center of this region.

Accounting for the multi‐period impact of service when determining employee requirements for labor scheduling

Journal of Operations Management 1993
Providing good customer service, inexpensively, is a problem commonly faced by managers of service operations. To tackle this problem, managers must do four tasks: forecast customer demand for the service; translate these forecasts into employee requirements; develop a labor schedule that provides appropriate numbers of employees at appropriate times; and control the delivery of the service in real‐time. This paper focuses upon the translation of forecasts of customer demand into employee requirements. Specifically, it presents and evaluates two methods for determining desired staffing levels. One of these methods is a traditional approach to the task, while the other, by using modified customer arrival rates, offers a better means of accounting for the multi‐period impact of customer service. To calculate the modified arrival rates, the latter method reduces (increases) the actual customer arrival rate for a period to account for customers who arrived in the period (in earlier periods) but have some of their service performed in subsequent periods (in the period). In an experiment simulating 13824 service delivery environments, the new method demonstrated its superiority by serving 2.74% more customers within the specified waiting time limit while using 7.57% fewer labor hours.

A comparison of resource allocation and activity scheduling rules in a dynamic multi‐project environment

Journal of Operations Management 1993 open access
The use of a dual‐level structure in managing the use of resources in a multi‐project environment involves two sets of decisions. Resource allocation decisions, usually controlled by a central authority, determine the allocation of resources among projects such that resources are allocated to the critical projects. Once assigned to a project, the resources are managed by an independent project manager who schedules the activities within his project using only the resources assigned to him. This paper evaluates the relative performance of four resource allocation priority rules and six resource transfer rules in conjunction with two activity scheduling rules. The results show that the First in System First Served resource allocation priority rule dominates over the other three proposed resource allocation priority rules with the lowest project tardiness, flowtime, and lateness standard deviation. Further evaluation of the resource transfer rules shows that additional resources should only be transferred into a project just‐in‐time of expected use, and idle resources which are expected to be utilized within a time period of not longer than two times the resource transfer time should be retained within their assigned project. The minimum late finish activity scheduling rule is also shown to perform better than the minimum slack activity scheduling rule.

Mixing static and dynamic flowtime estimates for due‐date assignment

Journal of Operations Management 1993
Prediction of job flowtimes is important from the perspectives of both providing internal control and customer satisfaction. More specifically, accurate and precise flowtime prediction can facilitate proper timing for the release of materials and resources, improved accuracy of delivery dates to customers, and identification of jobs that require expediting. The objective of this paper is to introduce a new approach to flowtime prediction which improves performance quality over that found in existing dynamic flowtime estimation models. This new approach, mixed flowtime estimation, incorporates both static and dynamic flowtime estimates into a single, flowtime prediction model. In this investigation, mixed and dynamic models are compared experimentally using computer simulation of a job shop under various congestion conditions and dispatching heuristics. The results of this investigation reveal that the mixed flowtime prediction models provide significant improvements in job shop due‐date estimation performance. Statistically significant performance improvements are obtained in both the average lateness and fraction tardy jobs for mixed estimates. Specifically, average lateness is reduced by 25% in the balanced shop and 40% in the bottleneck shop. This improvement enables a corresponding increase in the accuracy of job flowtime estimates, and, hence, due‐date assignment accuracy. Due‐date performance improvements are observed for each scheduling heuristic investigated.

Freezing the master production schedule for material requirements planning systems under demand uncertainty

Journal of Operations Management 1993
Freezing the master production schedule (MPS) is one of the commonly used methods to reduce schedule instability or nervousness in material requirements planning (MRP) systems. However, the impact of MPS freezing parameters in multilevel MRP systems has not been fully understood. This paper investigates the impact of MPS freezing parameters on the total cost, schedule instability and service levels in multilevel MRP systems under demand uncertainty conditions. The MPS freezing parameters included in this study are: (1) planning horizons; (2) freezing proportions; (3) freezing methods; and (4) replanning periodicity. The paper also examines the impact of forecasting errors on the selection of MPS freezing parameters and system performance. A model was built to simulate forecasting, master production scheduling and material requirements planning operations in a manufacturing company. The company is assumed to produce two end items with no component commonality. The company operates in a make‐to‐stock environment. No back orders are allowed and thus any shortage will become a loss of sales. Through a comprehensive simulation experiment and statistical analysis, the study arrived at the following findings: (1) Forecasting errors significantly increase total costs and schedule instability, and reduce the service level in multilevel MRP systems. The selection of forecasting models has a significant impact on system performance. In addition, forecasting errors also influence the selection of some MPS freezing parameters. (2) A planning horizon of four natural ordering cycles results in a lower total cost and schedule instability and a higher service level than a planning horizon of eight natural ordering cycles under demand uncertainty condition, but a higher total cost and schedule instability under deterministic demand conditions. Thus the prolongation of the planning horizon can actually worsen MRP performance under demand uncertainty conditions while it improves MRP performance under deterministic demand conditions. (3) A higher freezing proportion results in a lower total cost and schedule instability, and does not influence the service level under deterministic demand conditions. Therefore, freezing the entire planning horizon is the best option in this case. However, a higher freezing proportion often results in a higher cost, and a lower service level, while reducing schedule instability under demand uncertainty conditions. As a result, the choice of freezing proportion should be based on the required trade‐offs among the three performance criteria under demand uncertainty conditions. (4) The order‐based freezing method results in lower total costs than the period‐based method in most cases. In terms of schedule instability, the period‐based method with freezing proportion of 1.0 performs the best. In terms of service level, the period‐based method with freezing proportion of 1.0 performs the worst; the period‐based method with freezing proportion of 0.25 performs the best. The selection of the freezing method should be considered in combination with the freezing proportion to achieve the required trade‐offs among the performance criteria of total costs, schedule instability, and service level. (5) A higher replanning periodicity results in a lower total cost, schedule instability, and a higher service level under both deterministic and stochastic demand conditions. Thus, less frequent replanning improves system performance. These conclusions may help MRP practitioners to select MPS freezing parameters in multilevel MRP systems.

Viable theoretical forms of synchronous production innovation

Journal of Operations Management 1993
Knowing what theoretical forms might best describe the relationships among administrative innovation, technological innovation and organizational performance can help production managers improve performance. Managers may adopt either administrative or technological innovation depending on how they perceive the form of these relationships. Alternatively, managers can plan for and implement synchronous innovation aiming at its synergistic effects on organizational performance. Defined as the coincident‐in‐time adoption of compatible technological and administrative innovations, “synchronous” innovation is emerging as a response to the increased rivalry from offshore competitors. Prevailing theoretical forms of synchronous innovation emerge from the administrative and technological research perspectives of organizational innovation. Yet, it is the perceived form of synchronous innovation which determines where in its causal network of relationships production managers intervene to improve performance. Assuredly, performance improvements may require a detailed inquiry into a firm's specific situation. Depending on the situation, the relationships among administrative innovation, technological innovation and organizational performance can yield alternative or complementary forms of synchronous innovation. Production managers and researchers encounter such forms in various organizational settings. Exploring several perceived forms of synchronous innovation is therefore pertinent to production research and practice. To examine production managers' perceptions of synchronous innovation, this paper combines the administrative and technological perspectives of organizational innovation into four descriptive models of synchronous innovation. Drawing upon a diverse sample from the organizational innovation literature, each model incorporates both administrative and technological innovation dimensions, organizational performance dimensions and the causal interconnections among these three constructs. Thirty‐five plant managers' perceptions of the relationships underlying synchronous innovation provide data suitable for testing the viability of the four models. The data show how administrative and technological innovation dimensions interact with, intervene among or moderate the contributions of each other on organizational performance, rendering their independent effects negligible without synchronous innovation. Firms may improve performance significantly by emphasizing either administrative or technological innovation alone. Yet, our results support the necessity of adopting a fine‐grained approach to organizational innovation research and practice. Understanding the effects of innovation on organizational performance requires scrutinizing the effects of administrative innovation when predicting the effects of technological innovation, and vice versa.

An evaluation of labor assignment rules when workers are not perfectly interchangeable

Journal of Operations Management 1993
The dual resource constrained job shop research has considered the issue of labor flexibility. However, labor flexibility has been defined as the ability of the worker to transfer from work center to work center. A more encompassing definition used in this research is that labor flexibility is worker efficiency at each work station. With workers not equally capable at every center, assignments of different workers to the same work center results in different capacity requirements for the same job. The research here examines how to assign labor to work centers when these differences exist. The traditional labor assignment rules, when to move and where to move, are tested against rules that are created to incorporate worker efficiency information. These rules are first evaluated and then subsequently tested on differing matrices representing other labor efficiencies and with alternative dispatching rules. Results of this research indicate a departure from previous results in the dual resource constrained job shop. The research shows that selection of the rule that governs where the worker should move is the most important choice.