Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:

A note on “Stochastic unpaced line design: Review and further experimental results”

Journal of Operations Management 1989
Executive Summary A 1985 study in this journal examined the “bowl phenomenon” and claimed to demonstrate that Hillier and Boling's original results 1967 were due to an assumption of unrealistically large variations in processing times. A closer look at these findings reveals that they are derived from a flawed experiment that cannot possibly serve to verify whether or not average task times at work stations on an assembly line should be selected in a bowl distribution. We offer further arguments in clarification of Hillier and Boling's original work based both on our own simulation experiments as well as recent studies by other authors. We also comment on the need to orient future efforts toward practical integration of the bowl phenomenon result with other findings that relate to improving the throughput of unpaced assembly lines.

Tooling constraints and shop floor scheduling: A simulation study

Journal of Operations Management 1989
Research into the problems of job shop scheduling has dealt with two of three major categories of shop floor resources: machine capacity and labor. Generally ignored has been the impact of tooling constraints, the third form of shop floor resource, on the scheduling process. The impact of tooling is the focus of this study. Using a simple simulation model of a shop operating under varying levels of tooling availability, it is shown that the level of tooling availability has a significant impact on shop floor performance as measured in terms of mean flow time, mean tardiness, number jobs tardy and number of tool changes. Four different tooling assignment rules are evaluated and their effect on system performance is described. The results indicate that tooling assignment rules should consider both job priorities and tooling availability in order to achieve good shop performance. The paper concludes with general recommendations for the management of shop orders facing limited tooling availability.

Improved hierarchical production planning

Journal of Operations Management 1989
This article addresses an overview of development and application of an integrated production planning model within the fiberglas industry. The system described represents a second generation in the development cycle of hierarchically based models within this batch production industry. A number of salient issues that distinguish this modeling approach from previous ones are examined. Our contention is that the explicit treatment and integration of demand forecasts within the context of production planning models is a necessary condition for implementation and ongoing use of such systems. Further, due to the nature of practical disaggregate problems, oft cited linear programming (LP) models will be set aside by more flexible goal programming solutions that explicitly recognize the dynamics of variations in product mix, production rates and management objectives. Finally, the development, delivery and maintenance of these planning models will increasingly be performed on microcomputer‐based systems and software versus traditional mainframes.

Stochastic unpaced line design: A reply

Journal of Operations Management 1989
Executive Summary In the May 1985 issue of the Journal of Operations Management , we published a paper containing two major segments ( Smunt and Perkins (1985) ). The first segment provided a comprehensive review of previously published research on unpaced assembly lines. Two of the primary references in this review were path‐breaking studies by Hillier and Boling (1966) and Hillier and Boling (1979) . These studies introduced the idea of the “bowl phenomenon,” which suggests that line output can be increased (compared to a balanced line) by unbalancing the line with high service times placed at the beginning and end of the line and low service times placed in the middle of the line. This pair of studies also verified the existence of the bowl phenomenon for exponential and Erlang service times with line lengths up to five stations and buffer capacities between stations from zero to four units. The second segment of our 1985 paper reported on a set of experiments to investigate the “robustness” of the bowl phenomenon under varying service time and buffer capacity assumptions. We tested and confirmed three primary hypotheses: The use of the bowl distribution to unbalance an assembly line will not significantly increase the output rate as compared to a balanced configuration when normally‐distributed work station service times are employed with less variance than the exponential distribution. Minimal increases of buffer storage capacity will significantly reduce or will negate the benefit of using the bowl distribution. Output rate is not highly sensitive to moderate variations from optimal task time allocation for stochastic unpaced lines. In other words, we found that the bowl distribution does not have advantages over a balanced line if either more realistic normally‐distributed service times are used or larger buffer capacities are available. Thus the bowl phenomenon, while interesting, does not appear to exist in most real world unpaced lines. In the “Note” which immediately precedes this “Reply,” the authors take issue with our conclusions, based primarily on their view that our 1985 experiments were “flawed.” While the “Note” authors provide some valuable arguments and correctly point out a weakness concerning the number of simulation repetitions in our 1985 study, in general it is their arguments that are “flawed,” as we will establish in this paper. In responding to the preceding “Note,” we have conducted a very extensive simulation experiment—much larger than either our 1985 study or the small study conducted as part of the preceding paper. The results of this enhanced study provide strong support for the conclusions of our 1985 paper.

Sequencing rules, progress milestones and product structure in a multistage job shop

Journal of Operations Management 1989
Manufacturing products which include the assembly of components requires knowledge of both the resources required to manufacture that part, as defined in the product routing sheet, and the relationship of components to be assembled at successive stages as defined in the product structure, or Bill of Materials (BOM). Job shops in which this type of manufacturing is done are generally referred to as multistage assembly job shops. Scheduling a multistage assembly job shop requires the proper coordination of materials flow through the various stages necessary to complete a product. It requires considering the time a product may have to wait for its parallel components before the required assembly operation can begin, as well as the waiting time required for a particular machine. Consequently, multistage assembly job shop scheduling is a much more complex problem than that of scheduling a single‐stage job shop. This paper examines several important issues in shop floor control in a multistage assembly job shop, namely: 1. Which sequencing rules are most appropriate for a multistage assembly job shop? 2. Do progress milestones improve the performance of the sequencing rules? 3. Are the various sequencing rules and progress milestones sensitive to product structure? Although an MRP system is not used specifically in this research, questions related to MRP implementation, such as the practice of using component or assembly due dates, are examined. The objectives of the study are to determine the appropriate combinations of sequencing rules and progress milestones for multistage assembly job shops and to evaluate the sensitivity of sequencing rules and progress milestones to the complexity of product structure. This research examines the performance of fourteen due date oriented sequencing rules in a simulated ten‐machine multistage job shop having one assembly work center. Due date based sequencing rules are utilized since previous research has indicated that such rules generally resulted in better shop performance than other types of rules tested. Although the focus of this research is on multistage job shops, the sequencing rules tested are inclusive of those due date oriented rules found to be successful in both single‐stage and multistage job shops. Each sequencing rule is tested using three methods of setting due date milestones to control the progression of a job toward completion. These methods are: (1) job due dates, (2) assembly due dates, and (3) operation due dates. Again, the use of these three methods of setting progress milestones is based on the findings of previous research. Both the sequencing rules and progress milestones are evaluated with respect to the complexity of the product's structure. Herein, the product structures used in the study represent flat products (many components at few levels) and tall products (few components at many levels). Five separate BOMs are employed for each of the two product structures, to examine the sensitivity of the sequencing rules and type of progress milestones to product structure. Also, the logical extremes of flat and tall BOMs are selected to better assess the impact of product structure on sequencing rule performance. The findings indicate that the practice of using component due dates to sequence jobs as done in many MRP environments may not be appropriate. In fact, the use of progress milestones worsened the performance of the fourteen dispatching rules for all performance criteria collected. Three of the fourteen dispatching rules tested were found to result in consistently poorer performance than the remaining eleven rules. Very little difference was found between the performance of these other eleven dispatching rules. Also, the sequencing rules were found to perform equally well in a shop characterized by tall BOMs as in a shop characterized by flat BOMs.

Due date based scheduling in a general flexible manufacturing system

Journal of Operations Management 1989 open access
Dynamic scheduling of manufacturing systems for due date based objectives has received considerable attention from practitioners and researchers due to the importance of meeting due dates in most industries. Research investigations have focused primarily on the relative effectiveness of various dispatching rules in job shops. These rules operate by prioritizing jobs using a “criticality index” based on job and system status. Jobs are then scheduled from most critical to least, with the indexes typically being updated as the system changes. This study considers two important issues which have not been addressed previously in the literature. First, we investigate the impact of unequal machine workloads on the relative effectiveness of dispatching rules. This is significant because workloads are likely to be unbalanced in most real systems. While it is clear, intuitively, that this imbalance in machine workloads is likely to deteriorate system performance, it is not obvious whether the superiority of certain dispatching rules established in earlier studies for balanced workloads is carried forward to this case. We show that the performance of different dispatching rules does indeed depend upon the degree of workload imbalance. We also propose and test a scheduling procedure which performs well in both balanced and unbalanced systems. Next, we develop a scheduling approach which shows promise as being an improved alternative to the use of dispatching rules. This approach decomposes the dynamic scheduling problem into a series of static problems. These static problems are then solved using an optimum‐seeking method, and the solutions are implemented on a rolling basis. We show through a simulation experiment that adopting this approach over dispatching rules leads to an improvement in the overall solution quality, even in a dynamic environment. The two very practical implications of our study are: (1) that commonly used dispatching rules in job shops or automated manufacturing systems may not be the best approach when capacity utilization is unbalanced (2) a job shop or automated manufacturing system would likely benefit from implementing optimal‐seeking scheduling rules instead of the traditional job dispatching rules.

A heuristic algorithm for managing inventory in a multi‐echelon environment

Journal of Operations Management 1989
The proper management of finished goods inventory in a multi‐echelon environment is an extremely difficult problem to solve. Optimization approaches for solving this problem are intractable, and currently available heuristic techniques have serious deficiencies. Pull systems and independent demand based push systems do not adequately deal with the lumpy demand caused by the dependent relationships of stocking locations in a multi‐echelon environment. Although distribution requirements planning (DRP) can be modified to handle uncertainties by adding safety stock, the process of deriving demands at lower echelons implicitly assumes deterministic conditions. In addition, no heuristic method directly considers the capacity of transportation and storage resources, or includes transportation costs. The incorporation of these additional complexities is left to the discretion of management. This study introduces a new heuristic algorithm that addresses these additional complexities. The algorithm is an improvement heuristic that can be implemented as an add‐on module to a DRP system. At the core of this heuristic are two search routines ( Savings and Change ) for improving an initial solution determined by the DRP explosion process. We demonstrate this heuristic algorithm with two simple problems to provide some insight concerning its operation. The heuristic algorithm is then tested against an alternative rolling horizon mixed‐integer linear programming (MILP) procedure that solves each linkage between locations optimally for each planning horizon. The example scenario used in this research consists of four distribution centers ordering from two regional warehouses, which in turn order from a central warehouse. Computer simulation is used to compare the two alternative procedures with rolling horizons and demand uncertainty. The performance of the procedures is compared for total costs, customer service, and the number of orders placed by locations within the control of the model. Multivariate analysis of variance (MANOVA) techniques are used to analyze these performance measures. The experimental results suggest that the heuristic algorithm performs extremely well when compared to the MILP based procedure. Demand uncertainty is found to have a significant effect on customer service performance, but safety stock can be added to distribution centers in actual applications to control this situation. In addition, a qualitative comparison between the MILP approach and the heuristic algorithm in this study suggests that the introduction of demand uncertainty has the effect of reducing the experimental differences between the two techniques. This result suggests that the heuristic algorithm presented in this research works best (relative to the MILP approach) in the actual environments for which it is intended. This study is of considerable value to managers concerned with the management of finished goods in a multi‐echelon environment. It represents an initial step toward the development of a heuristic algorithm that incorporates additional real‐world complexities and is tractable for realistically large problems. The findings from this study provide encouragement that similarly designed heuristics can be implemented within multi‐echelon inventory control systems in the future.

The behavior of lot‐sizing procedures in the presence of forecast errors

Journal of Operations Management 1989
Executive Summary This paper discusses lot‐sizing in time‐phased order point systems under three different conditions: with no forecast errors present, with forecast errors present but no safety stocks, and finally, with forecast errors present but with safety stocks introduced to counter the effects of the demand uncertainty. Fourteen different single stage lot‐sizing procedures have been observed during simulation experiments where each of these operating environments have been modeled. The existence of forecast errors radically affects the behavior of the lot‐sizing procedures compared to situations without forecast errors. For example, forecast errors not only lead to stockouts, they also induce larger inventories. Introduction of safety stocks, in turn, generates even larger inventories and also more orders. These environments, therefore, are so different, as are the associated lot‐sizing performances, that the relevance of previous research which has not considered stochastic environments must be questioned. One must conclude that, despite the enormous interest in lot‐sizing research over the years, the “scientific” body of knowledge, as it can be applied in practice, remains relatively undeveloped. Few guidelines with respect to lot‐sizing can, therefore, be offered to the practitioner by the research community. More relevant, i.e., more realistic, lot‐sizing research should alleviate such a situation.

Job release and labor flexibility in a dual resource constrained job shop

Journal of Operations Management 1989
Most of the past research in the area of job shop scheduling have used a model that simply equated job arrival with the release of the job to the shop floor for processing. Another common characteristic of this research is that it has ignored the worker altogether or confined the worker to a single type of machine. This study examines the role of labor flexibility in conjunction with the shop's ability to regulate the type and number of jobs active on the shop floor for processing. The release mechanisms that regulate the jobs on the shop floor consider both job and shop information in determining when a job should be released for processing. Labor flexibility, such as might be achieved through worker cross‐training, enables workers to operate more than one type of machine without any loss in productivity. Two release mechanisms with three levels of labor flexibility and two labor assignment rules are simulated in this study using two levels of job due date tightness. The shop performance is measured using several of the traditional measures as well as incremental and total cost. Results presented using statistical and graphical analysis show that there is no statistically significant difference in the performance using finite loading and infinite loading release mechanisms. Also, the inclusion of the minimum increment of labor flexibility produces the maximum performance improvement. Succeeding increases in labor flexibility show a diminishing return in shop performance.