The effects of work‐in‐process inventory considerations on learning curve construction

Journal of Operations Management 1982
Learning curves have been used since the 1930's as a tool to aid in the functions of cost estimating and production planning / control. While there has been much data collected to construct learning curves for airplanes, extensive coll ection of data to construct curves for electronic equipment has been limited. Further, virtually all published analyses to date have implicitly ignored the effects of work‐in‐process inventories on curve construction. This paper examines these effects through the historical construction of learning curves using actual industrial data. Work‐in‐process effects are considered through the use of linear and bilinear manufacturing progress functions. Degradation in the accuracy of curve construction is determined through the completion of a sensitivity analysis considering varying degrees of work‐in‐process activity. The results of the analysis show that work‐in‐process consideration affects the improvement curve percentage obtained. The method of work‐in‐process consideration is found to be less critical than the basic inclusion of this parameter in curve construction by one of several straightforward mathematical methods.

Static vs. dynamic priority rules for check processing in multiple dispatch‐multiple branch banking

Journal of Operations Management 1982
This paper presents a study comparing the use of four static and two dynamic priority rules for sequencing bundled checks in the check clearing operations in a bank's back office. The six priority rules are tested in a controlled computer simulation experiment, where bank factors of check bundle size, check bundle value, transit deadlines (dispatches), and destination proportions are systematically varied over prescribed levels. The results indicate that priority rule performance, measured by reduced float, is significantly affected by bank factors. The test results indicate that the two dynamic priority rules performed statistically better than three of the four static rules tested. The study reported here should prove useful to bank operation managers. The sequencing rules investigated here influence the level of float for a bank faced with multiple dispatches during the day. The test environments duplicated a variety of operating conditions that can be present in commercial banks. Therefore, the robustness of the tested static and dynamic rules were observed in reducing float under different conditions. Dynamic rules require recomputing priorities to reflect changes in time and create greater implementation effort to use effectively. Static rules require only one priority computation, resulting in easier implementation. This study indicates that one of the static priority rules tested provides comparable performance to the two dynamic rules.

Application of work center control rules in a job shop environment

Journal of Operations Management 1982
Work center control rules, defined as a combination of job dispatch rules and short‐term work center capacity adjustments, are analyzed using queueing theory. Promising rules are evaluated with a job shop simulation model. Simulations comparing work center control rules to the critical ratio rule for job dispatching indicate that work center control can increase performance to customer due date while simultaneously reducing average work in process inventory. The work center control rules are easily implemented by shops currently using input/output control and daily dispatch lists.

A cost minimization production planning model for continuous process chemical plant operations

Journal of Operations Management 1982
The management of large continuous process chemical plants oftentimes must make operating decisions within a rapidly changing economic environment. This paper describes a decision making aid in the form of a production planning model which is immediately responsive to such changes. The model provides cost minimization solutions to “what if” questions of management through the use of linear programming. Implementation upon an interactive computer system provides a user oriented model. A specific type of chemical plant operation involving 13 decision variables illustrates the approach. Five example real‐world situations demonstrate the approach's capability.

EOQ application in a pharmaceutical environment: A case study

Journal of Operations Management 1982
This paper describes a successful application of classical inventory theory at a drug manufacturing plant located in Montreal that has resulted in annual savings in the order of $110,800 and assisted management in its decision to invest in larger production equipment. The basic assumptions underlying EOQ models are reviewed and dealt with. For instance, an algorithm was devised to handle the peaks in the demand of many A class items. Following the implementation of this algorithm, buffer stocks were reduced signifi cantly while maintaining the same high levels of service.

Simulation study of a closed‐loop job shop

Journal of Operations Management 1982
This study investigates the behavior of a job shop depicted as an integral component of a firm. A market places demands for the firm's products by dynamically evaluating the organization's quoted delivery times and actual delivery performance. The closed‐loop model simulated in this study is described and the salient research results are reported. These experimental outcomes suggest that other conventional open‐loop job shop studies tend to neglect important interactions with factors external to the shop itself.

Goal programming applied to police patrol allocation

Journal of Operations Management 1982
This paper describes the development of a decision‐making methodology to aid the police patrol planner in resolving the patrol allocation problem. The methodology developed provides information to assist in two major decision areas: staff sizing and vehicle requirement schedules. This research uses a queuing based simulation model to derive expected service levels for a number of different performance measures. Given these results, tradeoff curves are mapped between specified performance measures and utilization rates of patrol vehicles. With this information the patrol planner specifies limiting levels for both performance measures and other managerial constraints which, in turn, are inputted into a goal programming algorithm to determine appropriate staff sizes and vehicle requirements. The primary output provided the patrol planner is the required amount of patrol vehicle hours to allocate to each watch per day per precinct in order to satisfy a designated set of performance measure levels and managerial constraints. The methodology presented in this research was developed in conjunction with the Columbus, Ohio, Police Department with data being provided by the Research and Planning Division.

Research issues for multi‐level lot sizing in MRP systems

Journal of Operations Management 1982
What lot size model(s) to use in a Material Requirements Planning (MRP) system is an unresolved and often debated issue. The concept of dependent demand, the complex network defined by the product structure, the dynamics of an operating MRP‐based system, and the subsequent use of the planned order release schedule by other company subsystems represent a totally new environment for making and managing lot size decisions. The purpose of this paper is to identify and briefly examine ten research issues related to lot sizing in a dependent demand product structure. These ten issues expand the solution space for lot sizing in an MRP‐based system compared to a reorder point based system. Areas for further research are suggested.