Knowledge that Transforms
To make high-quality research more accessible and easier to explore.
Fields:
30 results
✕ Clear filters
Instructions to authors
Capacitated heuristic program for multiactivity, multi‐facility system designs
Multi‐activity, multi‐facility design systems occur in a wide variety of industrial and service applications: e.g.: regional health care centers with configurations of activities at each center, and multi‐echelon inventory distribution systems. The problem in designing such systems is to determine from a candidate set of possible locations what facility locations should be opened and what types of activities should be carried out at each of the open facilities. This article presents an efficient heuristic procedure for such a problem. The heuristic procedure described can be used to solve both the uncapacitated and the capacitated problems where capacity is expressed in terms of the number of activities which can be supported by the facilities. Extensive computational experience with the heuristic is presented. The performance of the heuristic is compared against optimal solutions and the results look very encouraging.
On the natural cycle time of assembly lines
Heavy products such as airplanes are assembled in an assembly line fashion. These assembly lines are designed to complete a unit every few hours and up to a few days. The size of the product and the limited space available for work stations motivate the operation of such lines in two or three shifts. The objective of this research is to analyze the effects of multiple shifts on production scheduling of assembly lines in heavy industry. Two effects are: 1. On learning and improvement of performance as a function of experience and 2. On the production control system. The use of shifts causes a synchronization problem when the cycle time and the length of each shift do not have some special attributes; this problem can be solved by using parallel assembly line operating at their “natural cycle time.” A procedure for calculating the natural cycle time is suggested. The effect of parallel assembly lines on the expected labor cost of the line was checked by designing a set of randomly generated problems. The simulation study suggests that the parallel line configuration does not change significantly the total number of workers in the production system when facility layout cost is kept constant. The major conclusion of this study is that management should consider parallel line configuration whenever a synchronization problem exists and causes difficulties in production control as well as reduction in the learning effect.
Two heuristics for the deterministic, single operator, multiple machine, multiple run cyclic scheduling problem
The semiautomatic nature of machinery often makes it economical to assign more than one machine to a single operator. Multi‐machine assignments are common in the textile, tooling and molding industries. They are also found where numerically controlled (NC) machinery are used and, more recently, where flexible manufacturing systems (FMS) are employed. Previous work on deterministic cyclic scheduling models has focused on determining the optimal number of usually identical machines with single runs to assign to an operator. In practice, the schedules are represented by man/machine charts. When, due to production requirements, we mix different types of runs with known times on non‐identical machines, we have the deterministic, single operator, multiple machine, multiple run, cyclic scheduling problem. We present two heuristics for solving this more realistic generalization of earlier problems. For the nonidentical, multiple run case, the scheduling of the runs is crucial in minimizing the cycle time of the system. The integer programming formulation of small problems is large, and solving it directly could require excessive computation time on a large mainframe computer. Heuristic 1 selects the next machine run to schedule by minimizing the total immediate waiting cost of the operator and machines. The hourly machine costs reflect the relative merit of utilizing certain machines over others. Heuristic 2 first schedules the machine with the longest automatic processing time of run one. It then follows Heuristic 1 until the long processing time of the first run has ended. The next available run with the longest automatic processing time is then scheduled, and the process repeats. The underlying notion is that many short runs may be performed during the long automatic run of a machine. The heuristics are polynomially bounded, can be easily implemented on a mini‐ or micro‐computer and in practice should be much faster than integer programming methods. In addition to the heuristics, we compute a lower bound on the cycle time. We use this bound as a measure of the effectiveness of a solution. If for a given schedule, the cycle time equals its lower bound, then the solution is optimal. Both heuristics were coded in FORTRAN on a CDC‐6600 computer. An interactive version was also developed for a DEC PDP11/70. A detailed computational study is presented. In it, both heuristics solved 50 machine, 5 run problems in less than 10 CPU seconds on the CDC‐6600. Computational experience indicates that the heuristics are efficient and often find schedules which have cycle times within 10% the lower bound.
An application of the survey‐feedback method in a service operation
As the nature of the U.S. economy has become more service oriented, the field of operations management has broadened to address the unique problems of managing service operations. Most service operations are highly labor intensive, and efforts to improve system performance cannot ignore the attitudes and behaviors of the workers. The survey‐feedback method is a potentially promising technique for operations managers to gauge the attitudes of workers and to allow workers to provide input for solving problems. This paper provides evidence of the usefulness of survey‐feedback techniques for operations managers by describing an application in an actual operating environment. The survey‐feedback process involves (1) administering a survey instrument to the workers in order to assess their attitudes, (2) conducting feedback sessions to discuss work attitudes and ways of improving performance, and (3) implementing operating changes based on the input provided by the workers. This research involved a two‐year project in a major electrical utility where the survey‐feedback process was used to reduce the nonproductive time of traveling work crews engaged in repair and maintenance tasks. Prior to the study, a disturbing upward trend existed in the nonproductive time of the work crews. A survey instrument was designed to assess worker attitudes in five areas believed to be related to the problem of time utilization: communication, organizational rewards, job scheduling, supervision, and job satisfaction. Feedback sessions were held in which the summarized survey responses were presented, and potential causes for the high nonproductive time were discussed. Based on the suggestions of the workers, management made a number of operating changes involving equipment maintenance and required training for workers and supervisors. Nonproductive time was monitored by the use of direct observation time study at regular intervals both before and after the changes were made. Also, the survey instrument was administered again at the end of the two‐year period to see if the expressed worker attitudes had improved. To provide a basis for comparing performance, a control group of workers was established that participated in the surveys, but these workers were excluded from the feedback sessions and had no input into the operating changes that were made. The results showed that a dramatic downturn in nonproductive time occurred during the two‐year study period. The downturn occurred after the operating changes were made, and it was observed in both the test and control groups. The improvement in nonproductive time is related directly to the operating changes made by management. Despite the fact that these changes were based on input provided by the workers, no positive changes in worker attitudes were observed on the survey variables over the two‐year period. The results provide evidence that the survey‐feedback process can be effective in changing the behavior of workers in a service operation, but not necessarily their attitudes. These results are very similar to the findings of another major study of the survey‐feedback method which was done in a completely different operations environment.
Scheduling independent jobs on nonuniform, unequal processors
The problem of scheduling n independent jobs on a single processor to minimize the total tardiness of the assignment has attracted much attention. Solution algorithms, both exact and approximate, have been reported, but no polynomial time exact algorithm has yet been found, nor has the problem been proven NP‐complete. In this paper we consider the more general case of scheduling n independent jobs on m unequal processors to minimize total tardiness. Since this problem is more complex than the corresponding single‐processor problem, no polynomial‐time algorithm is in sight. For problems of this nature, approximate algorithms may be more valuable than exact algorithms in terms of applications. A heuristic algorithm is developed to solve the multiple‐processor problem. Computational experiments show that the heuristic algorithm is efficient, fast, and easy to implement.
The subassemblies problem: Make to stock or combine?
In intermittent manufacturing of complex, assembled products, subassemblies are commonly produced on separate production orders, stored, and withdrawn as needed to make higher level assemblies. An alternate procedure is to make subassemblies as a set of operations on the production orders for their parent assemblies. If the latter method is employed, we say the subassemblies are combined. Whether subassemblies are made to stock or combined affects the number of production orders issued, the amount of stockkeeping and materials handling, the number of setups, and the size of the inventory investment. As a result, the impact on manufacturing costs can be substantial. In earlier work, the author developed and applied cost minimization methods for making these decisions in a preMRP, order point‐order quantity environment. In this paper these methods are extended so that they are applicable to computer‐based MRP systems. The proposed decision‐making strategy is to select a product line and establish the set of subassemblies within the line which could be either made to stock or combined. A typical master production schedule is selected and requirements are determined for the level 1 assemblies. Each level 1 assembly is analyzed to determine the cost associated with combining it or not combining it with each of its parents. The minimum cost alternative is selected and the process is repeated for the level 2 assemblies and so forth until all levels have been analyzed. A number of numerical examples are presented including cases where subassemblies are common to multiple parents, multiple units of a subassembly are used in one parent, and subassemblies have repair demand. Also a method is developed and illustrated for making decisions where learning affects the cost of assembly operations and must be taken into account. Analysis of product structure to determine whether subassemblies should be made to stock or combined offers the possibility of substantial cost savings. This paper presents a simple, straight forward method for making the analysis in an MRP environment.
Selecting master slab width(s) for continuous steel casting
This research investigates a production planning problem faced by one of the largest companies in the steel industry. The company constructed a continuous caster capable of producing slabs of steel from 92 to 104 inches wide. The planning decision is to select the most economical master slab width(s) from this range. Embedded in this production planning problem is a short‐term scheduling problem. Because master slabs are wider than customer requirements and wider than the equipment which processes them, they must be ripped longitudinally. Before selecting the master slab widths, a procedure must be developed to combine various customer order widths to obtain minimum losses when the master slabs are ripped. The author presents a mathematical programming formulation developed to solve this short‐term scheduling problem, and then demonstrates its use in solving the production planning problem of selecting the master slab width(s). While the actual results may not be directly applicable to different sets of circumstances, the methodology and its use are important, as demonstrated by the fact that the results obtained from the study have been implemented by the company.
Shared capacity resource reallocation in a decentralized service system
Short‐term capacity sharing on an occasional basis is a production planning strategy that is particularly attractive to managers of service organizations that employ relatively standardized resources within a highly unpredictable business environment. These resources may or may not be scarce and/or mobile, e.g., medical diagnostic equipment versus rental vehicles. This scheme implies cooperation in setting up the necessary administrative procedures. Beyond that, however, the participants are free to initiate resource transfers under almost purely competitive conditions, i.e., without the intervention of a higher level authority. An example is an industry‐wide computer system, operated since the late seventies by the American Trucking Association, which enables common carriers to reduce empty or partially loaded mileage. This paper is an initial investigation into the factors which affect the efficiency and effectiveness of decentralized resource reallocation schemes. Two groups of experimental factors are examined. The first group is comprised of features of the decison‐making processes of the independent managers while the second refers to characteristics of the organizational and operational arrangements. The model is a significant abstraction of the problem. For instance, all managers use the same process which is based upon simple feedback control upon the utilization factor at each service organization. However, they do not share information nor do they interact with one another. Instead they deal with a central depot which acts as a neutral “traffic policeman” of sorts. Requests for resources wait at this depot until available resources arrive from other organizations. Service at the depot is FCFS while transportation times between the eight service organizations and the depot are fixed and the same for all. Demand (and service) at each organization observes the same stationary Poisson (and Erlang‐k, respectively) distribution. Furthermore, the total number of resources remains fixed. Simulation was the research method employed. Sixty‐four simulation runs (i.e., experiments) were conducted. This number was a one‐half factorial design of seven experimental factors each at two levels. The first group consisted of two factors measuring the sensitivity of the upper and lower control limits and two factors measuring the dependency of the decision‐making process upon the status of the depot before as well as after a resource request was issued. The second group consisted of factors representing the number of organizations, the transportation time interval, and the homogeneity of the demand distributions at the organizations. Three classes of operational criteria were used: customer service (three criteria), resource utilization (seven criteria), and resource request service at the depot (six criteria). All the criteria refer to total, not individual organization performance. Analysis of variance for each performance criterion was conducted through the use of an additive linear regression model. Coefficients for two‐ and three‐way factor interactions were ignored. In general it was found that the generic decision‐making process was too simple and rigid to have a noticeable effect upon performance (particularly customer service). Still, the results suggest that the design of the decision‐making process is more important than the design of the organizational structure. Since the long‐term behavior of the depot can not be known beforehand, adaptive control limits appear to be a sensible approach. It was also found that some information about the status of the depot should be incorporated in the process. In terms of structure it was determined that a relatively small, compact, and balanced configuration has a favorable impact upon performance.