Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
35 results ✕ Clear filters

Multiplant MRP

Journal of Operations Management 1985
Many manufacturing firms have multiple manufacturing plants, located in geographically diverse parts of the world. This situation is becoming more common, as firms establish new plants in foreign countries to take advantage of low labor cost. In such cases, it is not unusual for the firm to retain production capability of certain key parts in a backup plant, with the necessary equipment and trained workforce in place. High volume production could be obtained relatively quickly from the backup plant in case of an emergency at the main supplying plant. In such multiplant settings, the transportation costs are significant. Throughout this paper, we use the term “multisourced parts” to describe parts produced in more than one location. Material Requirements Planning (MRP) is the component of a total manufacturing control system that is designed to manage inventory and plan orders for parts and material with dependent demand (demand derived from the demand of other items). Most of the literature on MRP systems discusses MRP methodology in a single‐plant environment. Most MRP software systems in use today are single‐plant systems. Currently, it is common for firms with multiple plants treated as cost centers to use an independent single‐plant MRP system for each and handle the transshipment problems manually. Because of lack of coordination of production schedules between supplying and demanding plants, those firms hold more inventory and experience longer lead times than necessary to compensate for uncertainties in schedules and supply policies. The purpose of this article is to enhance single‐plant MRP systems for coping with multiplant situations in which: the plants are regarded as cost centers, there exist multisourced parts, and the transportation costs are significant. The multiplant MRP system should recognize that parts are produced in different plants, make offset calculations for in‐transit lead times, and consider transportation costs when establishing production requirements and shipping routes for multisourced parts. The objective is, beginning with the corporate‐determined master schedule for finished products, to communicate in one planning cycle time‐phased planned order release schedules and shipping/delivery schedules to each manufacturing plant producing components for the finished products. We first present a simplified framework for the multiplant MRP system, where a transportation algorithm is incorporated into the MRP logic. Then we refine this simplified framework to handle more complex aspects of a multiplant network. These complexities include the treatment of requirements that are not shipped on time and the regeneration of new MRP schedules. We also observe that the solution to the transportation problem described above is affected by the lot‐sizing rules employed. In addition, we discuss several important issues and decisions that confront a firm when implementing a multiplant MRP system.

Capturing judgments to clarify production strategy and policy

Journal of Operations Management 1985
Recent years have brought a reawakening of the importance of shaping the operations function to support the broader strategy of each organization. Doing so, however, can be a complex, controversial, and highly subjective matter. Determining production's relationships to marketing, engineering, and finance requires executive‐level judgments on the relative emphases among these policy areas. Other judgments about internal capabilities, external factors, and production policies are also involved. Assessing these relationships is a subjective process that is often subtle and usually hidden. For managers, these judgmental areas are sources of disagreement, confusion, and controversy in policy determination. Within this context, the authors applied a judgment‐capturing process, called ProPol ( Production Policy ), to reveal and clarify managers' judgmental processes. The procedure uses correlational methods to identify where and how managers diverge from a common policy focus. The application settings were two executive development programs—one in manufacturing and the other in the public utility industry. Grouped into teams, the executives competed in week‐long computer simulation games. ProPol was introduced to assist in clarifying their production policies and strategies. In the manufacturing setting, five general policy areas—marketing effort, cost efficiency of production, R&D effort, product pricing, and service flexibility—were identified as salient variables prior to the simulation. We sought to reveal managers' subjective views on the appropriate balance among these variables. The variables were scaled and embedded within questionnaires to present alternative strategy and policy postures within the context of the simulated organizations. From analyzing the resulting judgments, ProPol served the following purposes: (1) to reveal to each manager his own decision structure; (2) to permit intermanager comparisons of decision structures among team members; (3) to provide explicit bases for focused discussions on overall strategy agreement/disagreement within teams; and (4) to serve as the basis for determining a consensus strategy by each team. The managers' judgment processes were compared in terms of judgmental consistency, complexity, and espoused versus in‐use importances of the policy variables. Consistency, the amount of uniformity in the manager's decision structure, varied widely among team members and across teams. While some executives held firm, consistent views of policy‐outcome relationships, others applied their structure inconsistently or shifted from one relationship structure to another in making their judgments. Judgmental complexity also varied widely within and across teams. The judgmental structures for most managers were simple linear relationships. Several, however, used more complex quadratic and interactive structures in relating the policy areas to overall effectiveness. Even when individuals were identically complex, however, they differed as to which policy variables were significant. Furthermore, although every manager espoused that all five variables were important, they were not all significantly used. The discovery of these discrepancies had a surprise affect: managers became aware of their personal inconsistencies and were stimulated toward understanding why they occurred. The group judgments, in contrast to the individuals, were more consistent and the espoused versus empirically‐derived importances were more in agreement. This occurred from group interactions following individual feedback. The feedback clarified specific areas of policy agreement, provided a productive way for resolving basic policy differences, and facilitated the groups in clarifying their strategic directions. In the utility environment, executives participated in a decision‐making simulation of a consumer‐owned electric utility. As before, five key policy variables for this industry were chosen. Some of the five policy variables are indirectly related to operations (e.g., rate setting and employee relations), while others are more specifically related to operations (e.g., cost efficiency, dependability, and flexibility). Analyses of the judgments revealed characteristics similar to those in the manufacturing environment. Overall, however, utility executives displayed somewhat more complex judgment structures than did manufacturing executives. As a result, there seemed to be more common ground for intrateam policy agreement. For eight of the nine teams, the group consistency exceeded the average of their members' individual consistencies. Otherwise the various teams displayed diverse functional forms for their strategy and policy judgments, and they were relatively consistent in doing so. These results indicate that ProPol can help managers clarify specific directions for the production function. By doing so, a more focused production thrust, one that is clearly and explicitly articulated, will enhance any organization's competitive strategy and provide clear guidance for subsequent decisions.

Materials management: The key is people management (five brief case histories)

Journal of Operations Management 1985
This article outlines the basic functions of materials management and then comments on the state of affairs as currently experienced by companies around the world. It also points out that the findings of past research have not been very helpful to the practicing managers. Nearly 80% of the companies remain frustrated with problems in their materials flow systems in spite of their concentrated efforts and huge expenditures on consultants, employee training, and computers and software. The author of this article puts forth a hypothesis that “All the problems of materials management have their roots in management of people.” He attempts to prove this hypothesis with the help of five case studies in which he has participated himself as a consultant. A brief description of each of these is provided, and certain descriptive analyses and arguments are presented to indicate that in every case, the root cause of failure of the materials management function could be attributed directly to loose discipline, poor employee training, ineffective reward systems, lower caliber of personnel, bad habits, misdirected motivations, or negative attitude of employees in general. The first case illustrates an irresponsible behavior of an outgoing plant manager that led to many headaches and serious problems related to materials. The succeeding plant manager had to deal with a real mess that could have been avoided had the outgoing plant manager or the top management of the company handled the situation in an intelligent, scientific, and disciplined way. The second case study is about an intelligent, aggressive, but dishonest pharmacist who used the sanctity of the garb of a medical man to cheat his hospital of substantial sums of money. He did not even hesitate in stealing costly, illegal drugs from the pharmacy for which he was supposed to be the protector and caretaker. He brilliantly succeeded in finding certain suppliers who joined hands with him and shared the booty. He could do all this because he succeeded in hiring the weak and the incompetent staff and because he could hide his real self by maintaining meticulous inventory records on paper. The third situation involved a large hotel's nutritionist, again an intelligent, aggressive, and ambitious person but a believer in personal gains no matter through what means. This person used the well‐respected technique of forecasting and the related forecast errors to his advantage. He hired only the meek, inexperienced, and marginal personnel to look after the flow of materials. Using a front of an excellent analyst and efficient manager, he was actually taking kickbacks from the raw food suppliers. The fourth company used a highly sophisticated software package for managing its purchase, storage, and inventory control functions, but the employees utilizing this package were not following any of the prescribed procedures and disciplined approaches required for continually updating the computer memory records. The bad habits of employees were causing all the materials management problems one could imagine. The fifth case study deals with a small company. This company was trying to use a highly complex and sophisticated software package for managing materials. The employees working with this package did not understand the logic behind the computer‐generated reports; for them it was a black box. They constantly disagreed with the action items and recommendations of the computergenerated reports. It was a total mess. After a great deal of hassle, the automated materials control system was replaced with a simple, transparent, easily understood “Kardex” system, and soon after most of the problems disappeared. In conclusion, we can emphatically say that it is the people (employees), their understanding of the methods, procedures, and installed systems, and their sincerity and motivation that make or break a materials management system. So far, as top management is concerned, the system (irrespective of its complexity and sophistication) is only a tool and in no way a remedy. Only the people can make it work and provide the desired results.

A polynomial goal programming approach to a class of quality control problems

Journal of Operations Management 1985
The traditional quality control approach based on statistical tools has been very useful and effective when output and input qualities can be denned in terms of a single characteristic. However, in process industries such as paper, the output quality is denned in terms of two or more distinct characteristics; hence, reducing the deviation of one output characteristic from its permissible limits could result in forcing other output and/or input characteristics to deviate from their respective limits. Compounding this phenomenon is the fact that most of these industries produce substantial amounts of pollutants whose characteristics are a function of the input and output characteristics. Thus, with increasing costs of waste treatment and stringent pollution standards, there arises a notion of a trade‐off between attaining market specified output characteristics and meeting federally regulated pollution standards. In this article a general process quality control problem has been formulated that reflects the above trade‐off both in terms of a linear and a polynomial goal programming problem. Major advantages and differences between the two formulations are highlighted and illustrated with a practical example drawn from the paper industry. Three separate cases each with different priorities assigned to the output, pollutant and input characteristics are developed and solved under both formulations. Based on the analysis it is observed that the different solutions that result are contingent on the assumptions concerning the priorities associated with each goal and the manner by which one chooses to incorporate tradeoffs between goals in the objective function. Additionally, it is found that the solutions obtained under polynomial goal programming formulation are more conducive for implementation in practical quality control contexts.