Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
26 results ✕ Clear filters

The retail inventory method: The third major costing system

Journal of Operations Management 1986
An organization that has but a single product would be a rarity in the United States today. While single‐product firms and tools such as break‐even analysis may have been in vogue at the turn of the century, today jointness pervades the scene. The bank that issues a mortgage to a customer also may have managed his or her checking account or granted a student loan to his or her daughter. The department store that sold a suit one week earlier may have attracted the customer with its furniture, toys, and cosmetics. The hospital whose obstetrical team delivered the baby may have been chosen because its excellent orthopedics department set the husband's broken leg three years prior. The sporting goods manufacturer may sell its golf clubs because of its reknown for skis and tennis rackets. It makes no difference whether it is products or services or departments; all share equipment, time, and reputation. The list goes on forever; jointness is the rule, not the exception. Management can pretend that there is only one product and attempt to isolate its effects, as if it were in a vacuum. However, pretending does not eliminate jointness and the purifying assumption is apt to mislead analysis. So how should jointness be treated? Other than the mathematical programming models of the last forty years, only one model for dealing with jointness has been widely adopted for most of the twentieth century; that model is the retail inventory method. The retail system typically is used by department stores to control inventories that consist of 100,000 or more items. The retail system recognizes costs and prices, inflation and obsolescence, mistakes and successes. It tracks purchases and sales, deals with discounts and transfers, and controls investment while providing an estimate of ending inventory. Fortunately, the retail system, the favorite of the department store and the boutique, could be used in the factory as well as in a variety of service and nonprofit organizations. This article briefly reviews the retail method and then uses linear programming (LP) and postoptimality analysis to modernize the traditional conceptions—to attempt to make a good system even better. Many constraints are studied including overlapping seasons, sales quotas, target inventories, product life cycles, and spatial and monetary limitations, among others. In the process, one comes to appreciate the size of the inventories being controlled, the human and departmental interactions, and the usefulness of the LP‐retail system (“knotty retail” is perhaps an appropriate name) not only to generate cash budget estimates and to manage stock levels, but also to select the most satisfying alterations of managerial policy. The article concludes by discussing further constraints and other types of organizations that might benefit from adapting the retail system.

On the retention of finished goods inventory when reorder‐occurrence is uncertain

Journal of Operations Management 1986
Finished goods inventory may accumulate for a variety of reasons in the production of lowdemand or slow‐moving items. In this article a simple model is developed and some results are presented to aid in making inventory retention decisions when there exists uncertainty about whether reorders for a slow‐moving item will be received in the future. In formulating the model, it is assumed that some excess inventory remains after filling a customer order and that a single reorder for the item is possible. The problem is to determine how long to retain the inventory before disposing of it. The relevant expected costs of retaining some quantity of inventory for a period of time consist of two types: (1) the inventory carrying cost less the salvage value from disposal; and (2) the future production cost incurred due to premature disposal. Using conventional optimization, a relationship for finding the optimal retention period is derived and conditions are identified that ensure that the optimal retention period can be obtained directly from the relationship. To determine the optimal retention period, probability distributions are required for the interarrival time until the reorder occurs and for the reorder quantity. While it seems logical to assume that each item would have its own distributions, this argument leads to a specification problem since the data needed to establish distributions for individual items will generally not be available for slow‐moving items. One approach used to overcome this problem in practice is to combine data for a selected group of items and use the combined data to obtain distributions useful for any or all of the items in the group. An example illustrating this approach is provided.

Exponentially smoothed regression analysis for demand forecasting

Journal of Operations Management 1986
This article proposes a new technique for estimating trend and multiplicative seasonality in time series data. The technique is computationally quite straightforward and gives better forecasts (in a sense described below) than other commonly used methods. Like many other methods, the one presented here is basically a decomposition technique, that is, it attempts to isolate and estimate the several subcomponents in the time series. It draws primarily on regression analysis for its power and has some of the computational advantages of exponential smoothing. In particular, old estimates of base, trend, and seasonality may be smoothed with new data as they occur. The basic technique was developed originally as a way to generate initial parameter values for a Winters exponential smoothing model [4], but it proved to be a useful forecasting method in itself. The objective in all decomposition methods is to separate somehow the effects of trend and seasonality in the data, so that the two may be estimated independently. When seasonality is modeled with an additive form (Datum = Base + Trend + Seasonal Factor), techniques such as regression analysis with dummy variables or ratio‐to‐moving‐average techniques accomplish this task well. It is more common, however, to model seasonality as a multiplicative form (as in the Winters model, for example, where Datum = [Base + Trend] ∗ Seasonal Factor). In this case, it can be shown that neither of the techniques above achieves a proper separation of the trend and seasonal effects, and in some instances may give highly misleading results. The technique described in this article attempts to deal properly with multiplicative seasonality, while remaining computationally tractable. The technique is built on a set of simple regression models, one for each period in the seasonal cycle. These models are used to estimate individual seasonal effects and then pooled to estimate the base and trend. As new data occur, they are smoothed into the least‐squares formulas with computations that are quite similar to those used in ordinary exponential smoothing. Thus, the full least‐squares computations are done only once, when the forecasting process is first initiated. Although the technique is demonstrated here under the assumption that trend is linear, the trend may, in fact, assume any form for which the curve‐fitting tools are available (exponential, polynomial, etc.). The method has proved to be easy to program and execute, and computational experience has been quite favorable. It is faster than the RTMA method or regression with dummy variables (which requires a multiple regression routine), and it is competitive with, although a bit slower than, ordinary triple exponential smoothing.

The use of simulation in system design: A case study using the precision location strike system

Journal of Operations Management 1986
The purpose of the article is to illustrate the use of computer simulation study and modeling in the design of complex systems. When new systems are designed, decision‐makers rely heavily upon judgment, intuition and experience. The method discussed is intended to enhance these executive attributes by providing a vehicle with which the decision‐maker may be proactive before implementing the system rather than being solely reactive after implementation. The application of a method known as the “systems science paradigm” is discussed and illustrated using the U.S. Air Force's Precision Location Strike System. The problem was to design a logistical support structure for the Strike System. The three major options proposed were to locate repair and resupply structures at the point of equipment use in Europe, to have a mixed system, or to locate support at a base in the continental United States. The research employed the paradigm suggested to develop an experimental Q‐GERT simulation model of the processes and structures envisioned. Data development for abstract systems is illustrated and methods to experiment with alternate structures are developed and discussed. The concept of multiechelon inventory and repair are addressed within the problem's context. A proposed design alternative resulted from application of the process. Methods, other than cost effectiveness, to evaluate the system are also suggested. Implementing the design process for ill‐defined systems appears to be an effective method for dealing with such design problems.

A reformulation of the aggregate planning problem

Journal of Operations Management 1986
This article proposes a reformulation of the aggregate planning problem which more closely agrees with situations frequently encountered in practice. The proposed reformulation assumes that a firm's production planners want to determine the expected service and inventory levels for a given production profile in the face of uncertain seasonal demand. By using several different production profiles that are each consistent with the firm's staffing, subcontracting, and overtime policies, it is possible to pick the profile that best meets the firm's preferences for service level and inventory turns. Actually, the trade‐offs between inventory and service levels are examined so that an informed choice can be made by all of those concerned. One of the advantages of the proposed model is that communications can be established among production, marketing, and finance managers who often have conflicting goals. Also, levels for inventory turns, service, and production can be set that are consistent with each other. Furthermore, several alternative production profiles can be examined in a relatively short time through the use of the simulation model proposed. An application of the model to the Wagner Spray Tech Company, a producer of painting equipment, is presented. In this particular case, where forecasting errors are quite high, some of the potential uses of the model are presented. Also, reasons are given why this particular reformulation of the aggregate planning problem was found to be useful.

Staffing and equipment decisions for services: An experimental analysis

Journal of Operations Management 1986
Many service‐oriented firms face demand/work load variations that occur both within and between days, and seasonally during the year. These service firms tend to develop staffing plans based on peak periods, resulting in substantial idle time during low demand periods. To counter this, some firms hire part‐time employees to work peak periods to improve productivity. In this way, the cost per customer/transaction (unit) can be reduced. However, the staffing decision is more complex than just determining the number and timing of the work force. The development of good staffing plans must consider the impact of available work stations like telephone consoles and data entry terminals. To use effectively more personnel during peak periods, the firm must have sufficient work stations to assign this work force. Effective staff scheduling must consider simultaneously the work load variations, employ capabilities, and equipment requirements. This article presents a model that incorporates these factors into the decision‐making process and examines their interaction. The model analysis illustrates how uncertainty in work load forecasts and staffing flexibility influence expected cost performance and equipment requirements. A set of computer simulation experiments are conducted using operating data from the proof and encoding departments for Ohio National Bank and Chemical Bank. The results suggest that increased staffing flexibility reduces the needed equipment investment, since part time staff can be scheduled more conveniently to meet varying work loads. Also, basing capital equipment decisions on peak work load levels can substantially increase total operating costs. With these costs explicitly estimated, managers can weigh them against desired service level goals to determine the appropriate balance.

Optimal technology choice in a dynamic‐stochastic environment

Journal of Operations Management 1986
The issue of technology management has become particularly relevant to operations planners as a result of the introduction of new, computer‐aided process technologies in recent years. At the same time, the fields of economics and management science have developed a number of models and paradigms for technology management and equipment replacement. In this article we present a model structure that builds on this theory and that is directed toward providing insights into the particular issues associated with fixed versus variable cost trade‐offs. A fairly general, dynamic, stochastic model is presented. This model links production planning with technology selection in a direct manner. The model computes optimal production plans in the face of uncertain demand in the course of evaluating the costs and benefits of each technology alternative. The key result of the article concerns conditions for the optimality of moves to lower variable cost technologies.

Research needs in managing factory automation

Journal of Operations Management 1986
The subject of factory automation is a critical one for all business functions, with the potential of creating an entire upheaval in the fields of accounting, finance, marketing, general management, and most significantly, operations management. Totally new ways of managing a business are likely, but it is not yet clear what these ways may be. In spite of the tremendous implications of these new technologies, little research is being conducted in this area. A panel session exploring this topic was thus offered at the 1984 Toronto meeting of the American Institute for Decision Sciences. This article presents the results of that session. The intent of the article is to foster research interest in this area and identify the extensive opportunities available. The article reviews the extant literature concerning the management of factory automation and identifies the gaps in our knowledge where research is needed. Factory automation as defined here is intended to include the areas of both hard automation (CAD/CAM, robotics, FMS, etc.) and soft automation (such as MRP II, group technology, MAP, data networking). Research issues are divided into three major topic areas for ease of discussion: strategic issues, justification issues, and implementation issues. The strategic area encompasses the subjects of corporate strategy and its tie with manufacturing strategy, firm characteristics of leading‐edge users of automation, the effect of learning and experience with automation, the concept of “synergy” among automation technologies, technology transfer, and implementation strategy. The justification issues are divided into benefit, cost, and risk aspects. The present inadequacy of economic justification techniques for automation systems and the pros and cons of alternative approaches are explored. The consideration of differing types of automation and their possible need for differing justification techniques is also discussed. For both benefits and costs, the quantification problem is a major issue, particularly with benefits believed to improve the effectiveness of operations, rather than their efficiency (a major advantage of the automation technologies, it is often claimed). Another major issue here is the pre‐ and postautomation comparison, requiring accurate and thorough manufacturing audit techniques. The risks in automation can be tremendous. Whether this can be reduced through incremental automation, or other approaches, is a very important question. The nature of the risks‐technological, financial, sociological—is also an important subject for research, as well as methods to deal with each type. Topics in the implementation area include procedural aspects, human aspects, interface/infrastructure aspects, and measurement and reward aspects. In general, the nature of the automation implementation process, and its solution, is a critical research area that is confounded with multiple factors. There is a need for research to determine if such a thing as a “best” implementation path exists for specific technologies and firms. How does a firm know if it is “ready” for automation, and which automation technology to start with? The effect of automation on workers and management is an important research question. And in addition, what are the effects of these employees on the implementation process? And it will be necessary to know how jobs change under automation, for both line and staff. Research is also needed to determine how automation will affect the way the firm does business, how interdepartmental coordination will be affected, and whether there will even be departments. If automation is implemented piecemeal, can the pieces later be tied together? What will be the problems? Managers need to know if new measurement and reward systems will be needed for workers, or perhaps even more important, for the managers. Will incentives need to be increased, or changed in some other fashion, for managers to be willing to take the risks involved in automation? Last, some advice is given to the potential researcher in this area. Approaching this subject in a way that yields meaningful research, helpful to real managers currently struggling with these problems, is important since real firms are our primary research laboratories in this field. For example, case studies, interviews, surveys, and conceptual development are important early tools in this area compared to the traditional model building and analysis techniques that have historically characterized operations management.

The trade‐off between the net present cost of a project and the probability to complete it on schedule

Journal of Operations Management 1986
In this article we consider the probability of not completing a project on schedule (or the risk of delays) and its effect on the net present cost of the project. We propose an efficient frontier that points out to management the trade‐off between low risk, early start schedules and high risk, late start schedules. Early start schedules minimize the risk of delays at the cost of early investment in project activities and material. Late start schedules delay capital outlays while increasing the risk of not completing the project on its due date. The methodology developed in this study is aimed at strategic level decision making. At this level, decisions are based on incomplete information that calls for stochastic analysis and the introduction of uncertainty. Uncertainty in project management is introduced through stochastic activity duration and stochastic lead times of resources required for the project. The commonly used CPM analysis ignores those aspects of uncertainty. PERT analysis does consider the stochastic nature of activity durations but computes only the probability to complete the project on a given date for a single schedule. A crucial decision at the strategic level of project management is when to schedule activities with high value‐added. The decision makers have to trade‐off the advantages of delaying such activities, thus reducing the net present cost of the project, with the disadvantages associated with increasing the probability of not completing the project on time. The number of feasible schedules in a real project is typically large and exact analysis of all possible schedules is difficult to perform, if not impossible. This article presents a heuristic procedure that generates an efficient frontier representing the risk of delays versus the net present cost of the project. The efficient frontier is a decision aid for the manager who has to choose the appropriate schedule for the project. Most computer packages for project management are based on CPM (especially packages for personal computers). Our heuristic procedure is designed to be used as an extension to CPM analysis. The procedure starts with the early start schedule developed by CPM and, using the computed slacks, tries to delay activities with high value‐added one at a time. At each iteration a Monte‐Carlo‐type simulation is used to approximate the probability of not completing the project on time. This probability is stored along with the net present cost of the project. The result of the analysis is a set of points on the plane representing the probability of not completing the project on time versus the net present cost of the project. Each point corresponds to a specific schedule. Management can choose the most appropriate schedule for implementation based on its attitude towards risk and its financial policy. A simple example is used to illustrate the heuristic procedure. In the example, a project with six activities and two types of resources is analyzed. Five schedules are generated with net present cost ranging from $45,000 to $8,191,000 and the probability of not completing the project on time ranging from 0.0001 to 0.75. Our experience with a real project of 400 activities is reported as well. The heuristic procedure can be implemented easily on advanced “Fourth Generation” packages for project management such as IBM's Application System (AS) or Metier's Artemis system. The heuristic procedure can also be implemented on personal computers by processing the output of any CPM package by the special subroutine that is developed in this study.

Manufacturing lead time accuracy

Journal of Operations Management 1986
This article addresses the question of accuracy of planned lead times (PLTs) that are used with a material requirements planning system. Lead time error is defined as the difference between an item's PLT and the actual lead time (flow time) of an order to replenish the item. Three related topics are discussed: the relationship between system performance and average lead time error, the transient effect on work‐in‐process (WIP) inventory of increasing PLTs, and the relative accuracy of three methods of determining PLTs. A distinction is made between available and WIP inventory. The former includes any purchased item, fabricated part, assembly, or finished good that is in storage and available for use or delivery. WIP denotes materials associated with open orders on the shop floor. It was concluded that average lead time error has a considerable affect on system performance. PLTs that are on average too long or too short increase available inventory; and the further the average error is from zero, the more pronounced the increase. Contrary to conventional wisdom, increasing PLTs will increase the service level (decrease backorders), unless PLTs are already severely inflated and MPS uncertainty (forecast error) is small. If PLTs are inflated, decreasing them will decrease the number of setups per unit time in the case of considerable demand uncertainty. Contrary to conventional wisdom, increasing PLTs causes only a transient rise WIP inventory. The fact that the average lead time error has a significant effect on the three areas of system effectiveness mentioned above does not imply that a given order's lead time should be managed in a way that forces its actual lead time to match the PLT. Stated another way, the material planner may use the latest information to manage a given order's lead time; however, if the average discrepancy between the actual and planned lead times is large, system performance can be improved by changing the PLTs to approximate the average flow times. Three methods that have been proposed for determining PLTs are compared. They are historical averages of the actual flow times, calculated lead times based on standard times and historical averages of the queuing time at the appropriate work centers, and the QUOAT lead time proposed by Hoyt. The third was found to perform poorly unless the work content of all operations is identical. With one exception, no differences were found between the first two methods. The simpler historical average method was superior to the calculated lead time in the case where the work content of each operation varies and when considerable demand uncertainty exists. The results are based on simulation experiments employing a generalized MRP/Job‐Shop stochastic simulation model. The program launches orders based on standard MRP logic, reschedules open orders by moving the due date in or out to coincide with revised need dates, moves manufacturing orders through a job shop, schedules the delivery of purchase orders, and updates inventory levels. The product structure tree contained eight distinct items, with four levels and one end item. There is no reason to believe that the conclusions would be any different had a larger system been studied.