Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
23 results ✕ Clear filters

The effects of lot sizing and dispatching on customer service in an MRP environment

Journal of Operations Management 1993
Results are presented of a simulation analysis of a hypothetical fabrication and assembly shop controlled by material requirements planning. The purpose of the study is to investigate the impact of lot sizing on the customer service performance of dispatching techniques in an MRP‐controlled assembly job shop operating near capacity. Six dispatching techniques are compared based on the tardiness of customer orders under four lot‐sizing techniques, two levels of demand, and two levels of nervousness. The study is conducted with a stable product mix, limited production capacity, and fixed routings. Random shifts in short‐term product mix cause short‐term bottlenecks, but one of the 15 work stations has less than 10% idle time and is the most commonly encountered bottleneck. The interaction of lot‐sizing and dispatching techniques was found to be a function of capacity utilization, a factor influenced by demand and nervousness level. Under low demand, earliest job due date yielded the best performance with regard to the percentage of tardy orders, average order tardiness, and maximum order tardiness. Under high demand, earliest job due date performed best with respect to average order tardiness and maximum order tardiness, but the best dispatching technique with respect to percentage of tardy orders depended on the lot‐sizing technique and the nervous‐ness level. Under high demand and high nervousness, effective capacity decreased and queues increased with economic order quantity, period order quantity, or least total cost. Economic order quantity generated the smallest batches. Period order quantity and least total cost generated extra set‐ups under high nervousness. Use of either of the three lot‐sizing techniques at high demand and high nervousness forced a choice between a dispatching technique that yields a low percentage of orders tardy (earliest modified operation due date) and one that generates low maximum order tardiness (earliest job due date). The Silver‐Meal heuristic consumed less effective capacity than the other lot‐sizing techniques. Using Silver‐Meal at high demand and nervousness, earliest job due date performed best with respect to each tardiness measure. The bottleneck causes the plant to behave like a single machine shop. Since large queues are maintained at the bottleneck, that is where the choice of dispatching technique is critical. Earliest due date minimizes the percentage of tardy orders. Earliest modified operation due date, operating like the shortest processing time rule, minimizes the percentage of tardy orders, but maximum tardiness is high. These results may stimulate new interest in single‐machine scheduling. The combination of least total cost and earliest job due produced the best overall performance at low demand. At high demand, Silver‐Meal and earliest job due date achieved the best performance.

A systematic simulation approach for the design of JIT manufacturing systems

Journal of Operations Management 1993
The paper provides a simulation model for kanban‐based scheduling in a multi‐stage, multi‐product manufacturing system. The model assists managers in determining the number of circulating kanbans and the corresponding container capacity. Each part is analyzed separately to find the optimum interarrivai time of the material handler, the optimum container capacity and the optimum number of kanbans. The analysis is based on the relationships between the overall cost and interarrivai times of each of these three input variables. Possible combinations of lot sizes are also investigated with the objective of reducing the number of such mixes. The results are used as an input for the multi‐product multistage simulation model to determine the best policy of mixed container capacities and number of kanbans. It is demonstrated that, given a set of operational conditions, a better design of a just‐in‐time manufacturing system can be attained through the application of the proposed simulation model.

Integrated system design and operational decisions for service sector outlets

Journal of Operations Management 1993
Effective system design for service sector outlets requires the explicit consideration of the interconnectedness of its myriad elements. Facility design decisions as well as tactical, operational choices must recognize the marketing environment, including competitive and demographic factors, and their interactions. The particular design and operational features selected for a given retail service outlet will affect its sales, fixed and variable costs, service levels, efficiency, and profits. We consider a fast food chain contemplating acquiring, building, and operating a new outlet at a particular candidate site, with its own particular environment. We offer a normative approach for this type of decision, which arrives endogenously at the best choices for both design and operational features for the site. The final decision as to whether or not to actually acquire, build, and operate the outlet at the candidate site thus depends on several complex connected choices. Our implementable approach integrates the non‐parametric allocative data envelopment analysis methodology with parametric regression analysis to yield a mathematical programming optimization model. We illustrate the approach with actual data from Hardee's, a fast food chain with over 3100 outlets, and an actual candidate site. The recommendations from the approach are compared with those from the conventional approach. A key advantage of our approach is its contrast to conventional approaches for site selection which ignore the more detailed design and operational choices. Additionally, the conventional approaches do not recognize the real possibility that labor and material costs might be affected by these choices. In conventional approaches, two types of errors can occur: (i) an incorrect “go/no‐go” decision could be recommended for the site in question, and (ii) even if the optimal design choices are coincidentally identified, the forecasted level of annualized profits could be quite different, leading to an incorrect decision or priority about acquiring, building, and operating the candidate outlet. Other key advantages of our suggested approach are that: (i) various substitution possibilities (between more or less capital, labor, material, etc.) are considered, (ii) not only is the best configuration identified, but also a ranking of the possible configurations is available to help in sensitivity analyses and answering “what‐if” questions, (iii) other specific sites (which serve as the basis for the recommendations) are identified, thereby enabling management (through site visits) to isolate the actual processes and procedures to be employed at the candidate site, and (iv) identify economies of scale possible. In summary, our approach identifies the chain's best practices in different environments, thereby enabling management to factor out poor performances due to flawed installation, lack of proper worker incentives, etc. Also, while the illustration is for a fast food outlet, the approach is equally appropriate for other service outlets, e.g., banks, hospitals, or pharmacies.

Setup cost reduction in the dynamic lot‐size model

Journal of Operations Management 1993
Recently, one primary focus of Operations Management has turned to setup reduction because of the growth of Just‐in‐Time(JIT) manufacturing. Porteus [1] and Billington [2] have developed optimal policies for calculating investment in setup reduction and lot‐size in the EOQ model when setup cost is some function of investment. Zangwill [3] has examined the effects of incremental setup cost reductions in the multi‐factility dynamic demand environment on costs and zeroinventory facilities. His focus is on obtaining zero‐inventory facilities and maximizing savings from lower setup costs without including the cost of such an event. As an extension of these developments, we model the Wagner‐Whitin problem with a one‐time oportunity to invest in setup reduction. Setup cost is treated as a policy variable and defined as a function of the decision variable representing the annual amortized investment in setup cost reduction. We use an exponential setup reduction function, but speculate that the results also hold for other functions as well. In contrast to Zangwill, we take a direct approach by explicitly finding the optimal investment in setup cost reduction while generating an optimal lot‐sizing schedule. Solving a model that incorporates the trade‐off between investment and savings results in more realistic solutions. We use a golden section search and the Wagner‐Whitin algorithm to obtain solutions for lot‐size, setup cost, and the investment in setup reduction. This model is also formulated as a network to better illustrate the interaction between the decision variables. The network formulation can also be exploited to solve the problem with linear programming or network techniques. Finally, we state and prove two theorems that hold for all setup reduction models whether they assume constant or dynamic demand. The first theorem asserts that optimal values for setupt cost and lot‐sizes stay fixed over a particular range of holding costs. The second theorem states that the optimal setup cost is independent of initial setup cost.

Selecting a set of vendors in a manufacturing environment

Journal of Operations Management 1993
In the face of growing competition, the Western manufacturing management is forced into becoming much more frugal in resource management. Just‐in‐time (JIT) is a set of principles which, by attacking all types of waste in manufacturing, can help management to achieve this competitive prerequisite. One of the main pillars of JIT manufacturing is JIT purchasing practices, which are predicated on selecting and maintaining close relationships with a few, albeit reliable and high‐quality, vendors. Most traditional approaches to vendor selection have been based on the notion of maintaining a competitive supplier base to achieve the least invoice cost. However, since there are many other costs, some explicit some implicit, JIT adopts the more encompassing objective of “total material costs”, augmenting the invoice cost with such avoidable wastes as large lot sizes, paperwork, inspection, and with losses due to poor quality and delivery. Many authors have proposed that limiting the number of suppliers that a company deals with is a prerequisite in the pursuit of JIT purchasing practices. When a relatively small number of parts are externally procured, single sourcing on a part‐by‐part basis can be quite effective in achieving the required small vendor base. However, when the number of parts and components externally purchased is large, as in the case of most fabrication/assembly operations, decisions pertaining to which vendors to keep, what to buy from them and which ones to drop are not as straightforward as finding the best single source for each part. The difficulty stems from the need to consolidate varying numbers of parts to the same supplier and to resolve many trade‐offs among important, conflicting and often non‐quantifiable criteria. This paper proposes a decision support approach to selecting vendors under the conflicting criteria of minimizing the annual material costs, reducing the number of suppliers and maximizing suppliers' delivery and quality performances. The system operates with a database on the purchased items and all potential vendors. Scenarios or problem instances are defined and analyzed with respect to specific quality and delivery performance standards (non‐structured elements of the problem) that the vendors must achieve. Several models are used to explore the trade‐off between material costs and number of suppliers (structured elements) under a variety of such scenarios. One model finds the set of vendors that minimize the total invoice cost regardless of their numbers which may of course be unacceptably large. A second model is used to find the smallest set of vendors who can supply all materials within the desired minimal quality and delivery parameters. This, in turn, may result in unacceptably high invoice costs. The above two solutions are used as benchmarks and a third model is employed to explore the quantitative trade off‐between these extreme solutions. The solution of the first model is trivial. The second and the third models respectively have the structure of the set covering and the K ‐median problems. These are solved using “greedy” heuristics which have been shown elsewhere to give very good‐quality solutions with reasonable computational effort. An example problem illustrates the proposed decision support tool.

An analysis of operational experience in the US/Mexico production sharing (maquiladora) program

Journal of Operations Management 1993
There have been few empirical studies on the successful implementation of the specific components of integrative production systems by multinational firms [1–3]. This study addresses the implementation challenges of offshore manufacturing encountered by multinational firms within a specific setting. The focus of this study is on the cooperative operational program known as “production sharing”, as developed in the US/Mexico border zone and in designated regions of the Mexican interior. This program is also known by the common Spanish name of “maquiladora” (meaning “contract milling”) industry. Despite the dramatic increase in the number ofmaquiladoras and their growing economic importance, research focusing on operational and startup issues has been limited and fragmentary. This study was designed to begin to fill this gap. The main purposes of the study were to: ‐ explore the organizational issues characteristic of offshore manufacturing as specifically present in the maquiladora program, ‐ determine the severity and duration of the technical and nontechnical challenges encountered in maquiladora operations, ‐ assess the applicability, value, and extent of use of a variety of performance‐enhancing programs and actions over different time frames, and ‐ explore the long‐term strategic advantages and challenges present in the maquiladora program. Survey questionnaires were mailed to a target sample of 425 facilities. The bilingual (English/Spanish) questionnaire was comprised of four major sections. The first section gathered background information regarding company size, organizational structure, international experience, and product/process technology. The second section assessed the types, duration and severity of difficulties faced in establishing and operating maquiladora facilities. The third section determined the usefulness of a number of performance‐enhancing programs/actions. The last section of the questionnaire asked for respondents' comments regarding their maquiladora experiences. The findings reported here are based on questionnaire data collected by mail, covering 28 different companies and 58 different facilities. Given the purposes of this study and its focus on describing industry practices, data were analyzed by tabulating frequency distributions for each item in the first three sections of the questionnaire. A content analysis was performed for responses to the open‐ended questions in the last section. Overall, there is no single, dominant operational function that may be considered as “the” key to success. The consistent and combined application of a number of fundamental manufacturing management programs on training, scheduling, simplification, flexibility, and gainsharing is the actual requisite for the achievement of success. Some of the key methodologies and technologies of manufacturing management have proven to be, in effect, largely transcultural, and transferable into this industry and its socioeconomic environment. Four general conclusions that can be derived from this study are: (a) core manufacturing management programs can be transferred, implemented and still retain validity within the different socioeconomic environments of US and Mexico, (b) “conventional wisdom” on offshore manufacturing must be adjusted in the key fields of organization, competitive rationale, innovativeness, comparative advantages, quality, personnel and logistics when operating within the US/Mexico maquiladora program, (c) substantial benefits can be realized in offshore manufacturing by exploiting combined competitive and comparative advantages through integrative operations planning and control and human resources management, and (d) there already exists a high level of organizational and managerial integration between the US and Mexico, with the potential facilitation that this represents for future North American economic integration.