Knowledge that Transforms
To make high-quality research more accessible and easier to explore.
Fields:
11 results
✕ Clear filters
Service levels for priority and nonpriority products with a common component
This paper refers to an article by Baker, recently published in the Journal of Operations Management. We point out an error, and provide correction, in the calculation of service level for a non priority product when a priority product and the nonpriority product share a common component.
Evaluation of scheduling techniques for solving flowshop problems with no intermediate storage
The flowshop scheduling problem with no intermediate storage (NIS problem) was studied in this research. This problem, a modification of the classical flowshop scheduling problem, arises when a set of jobs, once started, must be processed with no wait between consecutive machines. By eliminating the need for intermediate storage, reduction of capital investment in work‐in‐process inventory can be achieved. This approach can be practically applied to a steel mill, in which the metal should be continuously processed in order to maintain high temperature, as well as many other similar processes. To provide insight into selecting an appropriate scheduling technique for solving the NIS problem, six methods were compared in terms of the quality and efficiency of the scheduling solutions they produced. The quality of solution was measured by makespan and the efficiency of solution was measured by the computational time requirements. The six methods examined in this study included: the Gupta algorithm, the Szwarc algorithm, an integer linear programming method, the Campbell et al. algorithm, the Dannenbring rapid access with extensive search algorithm, and a mixed integer linear programming procedure. The problem factors considered in this study were number of jobs, number of machines, and range of processing times. Relatively small‐sized problems were tested with up to ten jobs, five machines, and 1–100 processing time units. Six solution techniques were selected and compared, with respect to makespan and computational time requirements, for multiple combinations of the three problem variables. The resulting test data were investigated using graphical procedures and formal statistical analyses. Initially, plots of mean values were used to graphically compare the six solution methods for the two performance criteria. Next, a multivariate analysis of variance study was conducted to investigate the quality and efficiency of the algorithms with respect to the problem factors. Then, a multiple comparison procedure was employed to analyze treatment mean differences among the six solution techniques. Results from the statistical analyses are summarized in this article. It was concluded that the two mathematical programming methods, the integer linear programming procedure and the mixed integer linear programming methods, produced the best performance in terms of makespan. These two methods, however, used a far greater amount of computational time than the other four solution techniques. Producing moderately good results as far as quality of performance, the Gupta and the Szwarc algorithms were comparable with the Campbell et al. and the Dannenbring algorithms in terms of computational efficiency. By comparison, the Campbell et al. and the Dannenbring algorithms produced the poorest performance with respect to the quality of solutions. Certain limitations were imposed for this study. The problem size considered was relatively small and the sample size was also limited to ten problems per cell. In addition, a uniform distribution function was used for generating processing times within certain ranges. These limitations were necessary in order to allow the various scheduling problems to be solved within a reasonable amount of computer time. Finally, some suggestions were provided for future research in the NIS problem area. The integer linear programming method was recommended as a standard of evaluation, owing to its best overall performance. A possible area for future research would involve the improvement of the Gupta and the Szwarc algorithms through the use of backtracking procedures within the branch‐and‐bound technique, so that they might be competitive with the mathematical programming methods with respect to quality of performance. Other distribution functions could be investigated in terms of the influence of the distribution of processing times on the performance measures.
The effect of inventory costs on the LIFO layer liquidation decision
Due to double digit inflation during the latter part of the past decade, many companies have switched to the LIFO method of inventory valuation. LIFO layer liquidation occurs whenever a company which uses the LIFO inventory valuation method decides to reduce ending inventory to a level below beginning inventory. During inflationary periods, a company that allows this liquidation to occur will have to pay higher federal income taxes. This paper develops a decision rule of whether or not management should make a special purchase to avoid LIFO layer liquidation. The tradeoffs involved with this special purchase are reduced federal income taxes coupled with higher carrying costs and order or setup costs. Since some carrying costs are tax deductible and some are not, most of the carrying costs are considered individually in developing the decision model. The tax deductible costs that are considered are the cost of capital, property tax, insurance costs, handling costs, and warehouse costs. The carrying costs considered that are not tax deductible are the risk or probability of deterioration and obsolescence. Since the costs and tax payment occur at different points in time, the present value of each of these transactions are made for comparison purposes. The decision rule is based on a comparison between the present value of these costs and the present value of the cost of a LIFO layer liquidation. An example is then used to illustrate the decision rule.
A simulation study of processing time dispatching rules
In this paper, the performance of truncated variations of the shortest processing time (SI) dispatching rule was simulated in a ten machine job shop. Each of the truncated rules placed those jobs which had waited for a predetermined length of time into a secondary queue. As long as jobs existed in the secondary queue, they were given a higher priority than jobs waiting in the primary queue. Each of the truncated rules sequenced jobs from the primary queue by SI while sequencing from the secondary queue was by some other priority rule. The objective of the truncated SI rules was to improve upon the tardiness problem associated with the simple SI rule without worsening greatly the good performance of SI on job flowtimes. Results indicated that the truncated rules which sequenced jobs in the secondary queue by job slack achieved the desired results better than the rules which sequenced jobs from the secondary queue by processing time. However, it was found that the implementation of these rules is complicated by the variability in the percent of jobs sequenced from the secondary queue. A second class of truncated rules which are easy to implement is developed. The performance of these rules was found to be as good as other selected rules studied.
Polynomial goal programming: A procedure for modeling preference trade‐offs
In the production/operations management environment it is common for decision makers to be faced with problems involving multiple objectives or goals, which cannot be satisfied simultaneously. The conflicting nature of these objectives results in solutions that involve tradeoffs or compromise. In production planning, for example, we typically wish to meet forecasted demand levels (or maximize customer service) over a given planning horizon, while simultaneously attempting to fully utilize normal capacity and also limit or minimize such factors as employee turnover, overtime, subcontracting, and inventory levels. Goal programming is a technique that is often useful in assisting decision makers find good solutions to problems involving multiple, conflicting goals. The objective of preemptive goal programming models is to minimize the sum of the weighted deviations from a set of ordered (or prioritized) goals. Current procedures for formulating and solving goal programming models rely heavily on the use of preemptive priorities to reflect the goal preferences of the decision maker. The nature of preemptive priorities is such that the weight associated with the deviational variables on one priority level is infinitely greater than the weight associated with the deviational variables on the next lower priority level. The capability to consider trade‐offs involving the satisfaction of goals that are associated with different priority levels is precluded by this requirement. Clearly, it is more common for a decision maker to be content with a solution near a goal, rather than demand that it be exactly satisfied, particularly if this attitude would result in an increase in overall satisfaction generated by a greater achievement of lower level goals. This paper develops an approach for a generalized goal programming model and solution technique, which will permit trade‐offs between preference levels, while retaining the flexibility to model intra‐level preferences. The Polynomial Goal Programming (PGP) model accommodates both intra‐level and inter‐level preference trade‐offs via the specification of the objective function as a polynomial expression. The exponents and coefficients associated with the terms in the objective function are selected (by the decision maker) to reflect the relative importance of satisfying goals as the corresponding deviational variables approach zero. These powers and weights establish the marginal rates of substitution involved in the satisfaction of both inter‐level and intra‐level goals. A key factor in the acceptance of a new modeling procedure is the ability to conveniently solve the resulting models with little or no modification to proven solution techniques. Polynomial Goal Programming models are particularly amenable to solution by Rosen's gradient projection method, as well as a number of related gradient‐based, non‐linear programming routines. A comparative example demonstrates the enhanced modeling capability of the Polynomial Goal Programming approach in contrast to the more traditional linear and quadratic preemption models. The example clearly demonstrates the capability of the PGP model to recommend inter‐goal trade‐offs when an increase in total satisfaction will result. This increase in “accuracy” of the model does not come without cost. Each refinement of the objective function attempts to bring the resulting solution closer to the decision maker's true preference. However, each refinement tends to increase both the complexity of the objective function and the cost of obtaining the corresponding solution. Thus, the use of the Polynomial Goal Programming Procedure is recommended only for those situations in which a cost‐benefit analysis indicates that the increased accuracy of the PGP solution is cost‐effective.
Design of time‐of‐use rate periods for a utility
Electric utilities are turning to the time‐of‐use rate structure as a solution to the pricing dilemma they face. Charging relatively higher prices for peak usage and lower prices for offpeak usage provides the correct pricing signal to the consumer and promotes a more efficient utilization of the utility. Though this rate form has been successfully used in Europe for over 25 years, there has not been much experience with it in this country. An important aspect of time‐of‐use rate design is the determination of peak and offpeak hours of the day. This paper uses cluster analysis to delineate the appropriate hours for rate design. Utilities build expensive base loads plants to provide large amounts of cheap energy and less capital intensive peaking plants with high operating costs to meet short term emergency requirements leading to higher average total costs as more power is generated. The procedure presented, therefore, groups loads into rating periods such that peak periods contain large loads and offpeak periods contain low loads. The methodology is applied to the determination of time‐of‐use rating period hours for a large electric utility in the U.S. Since the optimal grouping with four seasons and three time‐of‐use periods was judged to be not feasible, a “practical best” solution was developed by modifying it appropriately. The utility set the peak hours for winter months (October to April) as 6 a.m. to 12 noon and 4 p.m. to 10 p.m. and summer (May to September) peak hours as 10 a.m. to 10 p.m., with weekends and major holidays being considered offpeak. The time‐of‐use rate structure has been implemented for commercial and industrial consumers on an experimental basis. A consumer opting for the new structure will be monitored using both structures and billed for the lower amount.
Dynamic lot sizing techniques: Survey and comparison
Numerous heuristics have been proposed in the past two decades for the dynamic lot sizing problem, many of them in APICS journals. Their relative performance is explored in extensive numerical tests measuring expected costs, risks of higher than expected costs and computer time consumed. The results indicate that users of pertinent standard software systems could benefit substantially from an incorporation of more recently proposed methods, specifically Groff's (1979) stop rule and a fathoming algorithm expanding it to a look‐ahead heuristic.
Heuristic policies for inventory ordering problems with long and randomly varying lead times
In most inventory models, lead time is an insignificant factor in inventory modeling and implementation. There are situations, however, in private industry and governmental procurement in which this is not the case. For example, orders for castings and forgings with a low order size may have lead times of from 12 to 36 months. The actual lead time is random and depends on economic factors that determine the load at the foundry. A model developed by Liberatore in 1977 [1] was the first approach to incorporate random lead time and yet had a feasible solution approach for a multi‐period problem. However, this approach requires significant development time for implementation on a digital computer by a technically skilled analyst. Our sensitivity analysis of this model indicates that a solution of the model for every specific case may not be necessary. In fact, some heuristic policies are revealed that offer a manager a finite set of alternatives to consider with some assurance that the policy selected will be close to optimum. Our conclusions are: 1) Consider 1,2 or 3 orders per year with the order sizes roughly equal. 2) The time of the first order should be approximately E (lead time) + 1.25σ LT prior to the first demand point. 3) Large increases in σ LT will not affect these policies.
Load‐limited order release in job shop scheduling systems
This report examines the practice of using work load limits to control the release of orders to a job shop. Load limits function in the following general way. Whenever the inventory of work at a work center exceeds some critical value (its “load limit”), further release of orders which are routed to that work center are blocked from entering the shop. After the inventory is “worked off,” release of work to the shop gateways is again permitted. Load‐limited order release is intuitively appealing because it appears to be a method for reducing system inventory and flow times. The practice of load limiting order release is becoming popularized by some of the recent production planning software products now on the market. A notable example is OPT. In this report, analytical results for an M/M/1 queueing model, along with existing simulation studies of multi‐machine job shops are interpreted to form a theory about the effects of using load limits. The major finding here is the proposition that system flow time, inventory, and order tardiness all deteriorate to the extent that load limits introduce idle time into the schedule. Based on the arguments presented here, a very cautious approach toward the use of input control schemes for anywhere but gateway work centers would be advised. The conclusions drawn here are to a great extent arrived at by interpreting the research results of others, so there is a clear need for further research which tests these assertions in a more direct and controlled way.