Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
184 results ✕ Clear filters

Comparative Reliability of Verdicts

Management Science 2001 47(7), 931-948
We consider the problem of evaluating the reliability of a verdict given by a panel of judges. Given no information other than the number of panelists for and against, we address the question of when is a verdict that was obtained by a majority of k 1 vs. j 1 more or less reliable than one reached by k 2 vs. j 2 . We define criteria and investigate which verdicts are comparable and which are not. Consequences of this study may have bearing on choice of panel size and decision rule for decision-making bodies, such as courts, juries, committees, and boards. As implied by the above, our perspective is a posterior view of reliability, though it also entails prior concern regarding how the reliability of a verdict will be perceived after being delivered. As an example, we apply our results to comparing the reliability of different verdicts handed down by the Supreme Court of the State of Israel and assessing the option of expanding a hearing on a case from a bench of three judges to a larger panel.

Product Development Decisions: A Review of the Literature

Management Science 2001 47(1), 1-21
This paper is a review of research in product development, which we define as the transformation of a market opportunity into a product available for sale. Our review is broad, encompassing work in the academic fields of marketing, operations management, and engineering design. The value of this breadth is in conveying the shape of the entire research landscape. We focus on product development projects within a single firm. We also devote our attention to the development of physical goods, although much of the work we describe applies to products of all kinds. We look inside the “black box” of product development at the fundamental decisions that are made by intention or default. In doing so, we adopt the perspective of product development as a deliberate business process involving hundreds of decisions, many of which can be usefully supported by knowledge and tools. We contrast this approach to prior reviews of the literature, which tend to examine the importance of environmental and contextual variables, such as market growth rate, the competitive environment, or the level of top-management support.

Information Sharing in a Supply Chain: A Note on its Value when Demand Is Nonstationary

Management Science 2001 47(4), 605-610
In a recent paper, Lee, So, and Tang (2000) showed that in a two-level supply chain with non-stationary AR(1) end demand, the manufacturer benefits significantly when the retailer shares point-of-sale (POS) demand data. We show in this paper, analytically and through simulation, that the manufacturer's benefit is insignificant when the parameters of the AR(1) process are known to both parties, as in Lee, So, and Tang (LST). The key reason for the difference between our results and those of LST is that LST assume that the manufacturer also uses an AR(1) process to forecast the retailer order quantity. However, the manufacturer can reduce the variance of its forecast further by using the entire order history to which it has access. Thus, when intelligent use of already available internal information (order history) suffices, there is no need to invest in interorganizational systems for information sharing.

On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints

Management Science 2001 47(8), 1113-1121
In this paper we study the resource-constrained project-scheduling problem with discounted cash flows. Each activity of this resource-constrained project-scheduling problem has certain resource requirements and a known deterministic cash flow that can be either positive or negative. Deterministic cash flows are assumed to occur over the duration of the activities. Progress payments and cash outflows occur at the completion of activities. The objective is to schedule the activities subject to a fixed deadline to maximize the net present value subject to the precedence and resource constraints. With these features the financial aspects of project management are taken into account. We introduce a depth-first branch-and-bound algorithm that makes use of extra precedence relations to resolve a number of resource conflicts and a fast recursive search algorithm for the max-npv problem to compute upper bounds. The recursive search algorithm exploits the idea that positive cash flows should be scheduled as early as possible while negative cash flows should be scheduled as late as possible within the precedence constraints. The procedure has been coded in Visual C++, Version 4.0 under Windows NT, and has been validated on two problem sets.

Product Differentiation and Commonality in Design: Balancing Revenue and Cost Drivers

Management Science 2001 47(1), 37-51
Product design decisions substantially affect the cost and revenue drivers. A design configuration with commonality can lower manufacturing cost. However, such a design may hinder the ability to extract price premiums through product differentiation. We explicitly investigate the marketing-manufacturing trade-off and derive analytical implications for three possible design configurations: unique, premium-common, and basic-common. Our model considers two distinct segments of consumers. Some of the implications of our analysis are not readily apparent. For example, when the high-quality component is made common, the average quality of the products offered to the two segments increases. One may infer that with higher average quality, higher prices or higher total revenues might ensue. However, this may not be the case, as detailed in the paper. Finally, our analysis provides a useful framework to develop an index that can rank order components in terms of their attractiveness for commonality.

An Optimization Model for the Simultaneous Operational Flight and Pilot Scheduling Problem

Management Science 2001 47(9), 1290-1305
This paper describes and solves the operational pilot scheduling problem for one day of operations. The problem consists in simultaneously modifying, as necessary, the existing flight departure schedules and planned individual work days (duties) while keeping planned aircraft itineraries unchanged. It requires the covering of all flights from one day of operations with available pilots while minimizing changes in both the flight schedule and the next day's planned duties. The newly constructed personalized duties must not exceed the maximum duty duration. Flight precedence constraints, coming from existing fixed aircraft itineraries, must be respected as well. The problem is mathematically formulated as an integer nonlinear multicommodity network flow model with time windows and additional constraints. To solve the problem, a Dantzig-Wolfe decomposition combined with a branch-and-bound method has been used. The master problem comprises the flight-covering constraints and a new set of flight precedence constraints. Subproblems consisting of time-constrained shortest-path problems with linear time costs are solved by a specialized dynamic-programming algorithm. The proposed optimization approach has been tested on several input data sets. All of them have been successfully solved in very short computational time.

A Dynamic Lot-Sizing Model with Demand Time Windows

Management Science 2001 47(10), 1384-1395 open access
One of the basic assumptions of the classical dynamic lot-sizing model is that the aggregate demand of a given period must be satisfied in that period. Under this assumption, if backlogging is not allowed, then the demand of a given period cannot be delivered earlier or later than the period. If backlogging is allowed, the demand of a given period cannot be delivered earlier than the period, but it can be delivered later at the expense of a backordering cost. Like most mathematical models, the classical dynamic lot-sizing model is a simplified paraphrase of what might actually happen in real life. In most real-life applications, the customer offers a grace period—we call it a demand time window—during which a particular demand can be satisfied with no penalty. That is, in association with each demand, the customer specifies an acceptable earliest and a latest delivery time. The time interval characterized by the earliest and latest delivery dates of a demand represents the corresponding time window. This paper studies the dynamic lot-sizing problem with demand time windows and provides polynomial time algorithms for computing its solution. If backlogging is not allowed, the complexity of the proposed algorithm is O(T 2 ) where T is the length of the planning horizon. When backlogging is allowed, the complexity of the proposed algorithm is O(T 3 ).

An Adaptive, Distribution-Free Algorithm for the Newsvendor Problem with Censored Demands, with Applications to Inventory and Distribution

Management Science 2001 47(8), 1101-1112
We consider the problem of optimizing inventories for problems where the demand distribution is unknown, and where it does not necessarily follow a standard form such as the normal. We address problems where the process of deciding the inventory, and then realizing the demand, occurs repeatedly. The only information we use is the amount of inventory left over. Rather than attempting to estimate the demand distribution, we directly estimate the value function using a technique called the Concave, Adaptive Value Estimation (CAVE) algorithm. CAVE constructs a sequence of concave piecewise linear approximations using sample gradients of the recourse function at different points in the domain. Since it is a sampling-based method, CAVE does not require knowledge of the underlying sample distribution. The result is a nonlinear approximation that is more responsive than traditional linear stochastic quasi-gradient methods and more flexible than analytical techniques that require distribution information. In addition, we demonstrate near-optimal behavior of the CAVE approximation in experiments involving two different types of stochastic programs—the newsvendor stochastic inventory problem and two-stage distribution problems.

Comparisons with a Standard in Simulation Experiments

Management Science 2001 47(3), 449-463
We consider the problem of comparing a finite number of stochastic systems with respect to a single system (designated as the “standard”) via simulation experiments. The comparison is based on expected performance, and the goal is to determine if any system has larger expected performance than the standard, and if so to identify the best of the alternatives. In this paper we provide two-stage experiment design and analysis procedures to solve the problem for a variety of scenarios, including those in which we encounter unequal variances across systems, as well as those in which we use the variance reduction technique of common random numbers and it is appropriate to do so. The emphasis is added because in some cases common random numbers can be counterproductive when performing comparisons with a standard. We also provide methods for estimating the critical constants required by our procedures, present a portion of an extensive empirical study, and demonstrate one of the procedures via a numerical example.

Recombinant Uncertainty in Technological Search

Management Science 2001 47(1), 117-132
While the course of technological change is widely accepted to be highly uncertain and unpredictable, little work has identified or studied the ultimate sources and causes of that uncertainty. This paper proposes that purely technological uncertainty derives from inventors' search processes with unfamiliar components and component combinations. Experimentation with new components and new combinations leads to less useful inventions on average, but it also implies an increase in the variability that can result in both failure and breakthrough. Negative binomial count and dispersion models with patent citation data demonstrate that new combinations are indeed more variable. In contrast to predictions, however, the reuse of components has a nonmonotonic and eventually positive effect on variability.