Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
131 results ✕ Clear filters

Note—Developing a Global Diversification Measure

Management Science 1989 35(3), 376-383
Previous measures, focusing on either the international market or product dimension of corporate diversification, have been unsatisfactory for analyzing global diversification since both dimensions constitute important elements of a firm's global diversification strategy. This study constructs a measure in which both dimensions can be captured, allowing business strategy researchers to examine corporate diversification in the global context. In accomplishing this task, this study extends the Jacquemin-Berry entropy diversification measure to the global horizon.

Depreciation Policies in Regulated Companies: Which Policies are the Most Efficient?

Management Science 1989 35(5), 515-526
Decisions of firms such as whether to purchase new equipment frequently rather than better maintain and purchase less frequently are influenced by the (accounting) depreciation policies they use if they are rate-regulated. It is shown that basing decisions on depreciation policies, while uneconomic without regulation, might become rational under regulation. Regulators can mandate depreciation policies for these firms. This paper identifies a class of depreciation rules which will eliminate management incentives to make uneconomic capital replacement and maintenance decisions under regulation.

Project Scope and Project Performance: The Effect of Parts Strategy and Supplier Involvement on Product Development

Management Science 1989 35(10), 1247-1263 open access
This paper examines the effect on product development of project scope: the extent to which a new product is based on unique parts developed in-house. Using data from a larger study of product development in the world auto industry, the paper presents evidence on the impact of scope on lead time and engineering productivity. Studies of the automotive supplier industry suggest that very different structures and relationships exist in Japan, the U.S., and Europe. Yet there has been little study of the impact of these differences on development performance. Further, little is known about the effects of different parts strategies (i.e. unique versus common or carryover parts) on development. The evidence presented here suggests that project scope differs significantly in the industry, even for comparable products. These differences in strategy, in turn, explain an important part of differences in performance. In particular, it appears that a distinctive approach to scope among Japanese firms—high levels of unique parts, intensive supplier involvement in engineering—accounts for a significant fraction of their advantage in lead time and cost.

A Minimum Variance Result in Continuous Trading Portfolio Optimization

Management Science 1989 35(9), 1045-1055
The problem of minimizing the variance of discounted wealth at the end of a fixed period is solved when the expectation of terminal wealth is constrained to a specified investment goal. The results are obtained in a continuous trading framework under the assumption that the funds can be exchanged between a riskless bond and a stock whose discounted price is described by a geometric Brownian motion. Transaction costs are ignored (i.e., the market is “frictionless”) and unlimited borrowing is permitted at the same rate as the return on the bond. Typically the optimal trading policy under the above assumptions involves a highly leveraged investment in the stock in the early stages followed by an accumulation of the bond in the later stages. Numerical results are provided as an illustration of the theory.

Group Process and Conflict in System Development

Management Science 1989 35(10), 1172-1191
Information system development projects engage organizational members in a process with potential for conflict. Managing such conflicts in project groups is an important but often neglected aspect of systems development. This research assesses group process during the development of an information system in an insurance company, using questionnaires, recorded transcripts of group meetings, interviews, and archival data. We describe the relationships among four variables in a model of conflict—participation, influence, conflict, and conflict resolution—at five different periods over a 22-month period. Our results show that in every time period participation positively affected influence and that influence positively affected both conflict and conflict resolution. These findings are supported by an analysis of communication patterns within four project meetings and by qualitative data collected during the project. The practical implications of conflict and group processes in system development are discussed.

Capacitated Lot Sizing with Setup Times

Management Science 1989 35(3), 353-366
This research focuses on the effect of setup time on lot sizing. The setting is the Capacitated Lot Sizing Problem (the single-machine lot sizing problem) with nonstationary costs, demands, and setup times. A Lagrangian relaxation of the capacity constraints of CLSP allows it to be decomposed into a set of uncapacitated single product lot sizing problems. The Lagrangian dual costs are updated by subgradient optimization, and the single-item problems are solved by dynamic programming. A heuristic smoothing procedure constructs feasible solutions (production plans) which do not require overtime. The algorithm solves problems with setup time or setup cost. Problems with extremely tightly binding capacity constraints were much more difficult to solve than anticipated. Solutions without overtime could not always be found for them. The most significant results are that (1) the tightness of the capacity constraint is a good indicator of problem difficulty for problems with setup time; and (2) the algorithm solves larger problems better than smaller problems, although they are more time consuming to solve. This indicates that larger problems may be easier despite the greater computational effort they require.

Firm Strategies for Costly Engineering Learning

Management Science 1989 35(4), 496-512
The models developed in this paper seek to open up the ‘black-box’ of learning. I suggest that we need to think of learning-by-doing as a process of knowledge creation on the shop-floor by specialized teams of engineers. Learning is to be viewed, therefore, as a conscious decision and not a mere by-product of production. The models in this paper provide the basis for understanding international and inter-firm differences in rates of learning. For example, cheaper engineering resources, longer time horizons, faster output growth rates and superior transferability of knowledge from engineers to production workers are shown to be some possible factors responsible for faster learning in Japanese firms compared to U.S. firms.

Multipass Seasonal Adjustment Filter

Management Science 1989 35(1), 100-123
A state-space seasonal time series model and a new seasonal decomposition algorithm, based on the Kalman filter, are introduced. The time series model is statistically equivalent to the multiplicative seasonal model, ARIMA (0, 1, 1)(0, 1, 1) s , of Box and Jenkins. It is shown that the steady-state filter's forecasts of this model are identical to the Box and Jenkins' values. The seasonal adjustment and decomposition algorithm is based on a multipass filtering technique for back forecasting and smoothing in order to correct start-up transients and replace lost filter's estimates during the initialization phase. The in-sample performances of this multipass seasonal adjustment filter (MSAF) are compared with the Census X-11 procedure, using real time series. The empirical results clearly show the superiority of the proposed method for all time series in the study. Additionally, a sample from the Makridakis-Hibon's 111 time series is used for ex-post forecasting evaluation of the proposed method in comparison to the Winters and simple ratio-to-moving-average methods. It is observed that the MSAF forecasts are better than its competitors in most cases, especially when leadtimes are at least one season length.

A Variant of the Conditional Expectation Variance Reduction Technique and Its Application to the Simulation of the GI/G/1 Queues

Management Science 1989 35(11), 1334-1340
In this paper, we introduce the Partial Conditional Expectation (PCE) variance reduction technique, derived by modifying the well-known Conditional Expectation (CE) technique to make it more widely applicable. We apply this PCE technique to obtain a consistent estimator for the expected waiting time in queue in a single-server queueing system. We then derive an improved version of this estimator, taking into consideration further properties of the system. Empirical results show that these two estimators always perform better than the classical estimator. When the traffic intensity is low, the variance reductions obtained by these two estimators become very significant.

Control Policies for the MX/G/1 Queueing System

Management Science 1989 35(6), 708-721
The M X /G/1 queueing system is studied under the following two situations: (1) At the end of a busy period, the server is turned off and inspects the length of the queue every time an arrival occurs. When the queue length reaches, or exceeds, a pre-specified value m for the first time, the server is turned on and serves the system until it is empty. (2) At the end of a busy period, the server takes a sequence of vacations, each for a random amount of time. At the end of each vacation, he inspects the length of the queue. If the queue length is greater than, or equal to, a pre-specified value m at this time, he begins to serve the system until it is empty. For both cases, the mean waiting time of an arbitrary customer for a given value of m is derived, and the procedure to find the stationary optimal policy under a linear cost structure is presented.