Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
135 results ✕ Clear filters

Optimal Workload Allocation in Open Networks of Multiserver Queues

Management Science 1992 38(12), 1792-1802
In this paper, we examine the general problem of workload allocation in an open Jackson network of multiserver queues. We show that use of the open network model leads to a separable, convex formulation of the problem with relatively simple optimality conditions. Using these conditions, we prove in general that server groups with the same number of servers should be loaded equally and larger groups should be loaded more heavily than smaller groups. It is also shown that server pooling, combining servers into larger groups, will always reduce congestion and/or increase throughput. We discuss the significance of our results for job shop applications and also for the concept of a production bottleneck. In systems with an unbalanced configuration of servers, traditional, deterministic bottleneck analysis is distinctly nonoptimal; our results provide a simple way to locate production bottlenecks in shops with significant queueing effects.

Stochastic Dominance and Expected Utility: Survey and Analysis

Management Science 1992 38(4), 555-593
While Stochastic Dominance has been employed in various forms as early as 1932, it has only been since 1969–1970 that the notion has been developed and extensively employed in the area of economics, finance, agriculture, statistics, marketing and operations research. In this survey, the first-, second- and third-order stochastic dominance rules are discussed with an emphasis on the development in the area since the 1980s.

File and Work Transfers in Cyclic Queue Systems

Management Science 1992 38(10), 1510-1523
A cyclic queue has one server and n nodes, where each node has its own distinct type of customers that arrive from the outside. The server visits the nodes cyclically, serving the customers first at node 1, then at node 2, and so on through node n, and then repeating from node 1 again. Setup times are incurred when the server switches nodes. Typically, in the past, cyclic queues required that the work at any node arrive from the outside only. Our extension permits special nodes termed dual nodes. At these nodes the total work can include not only the outside customers, but also work transferred from other nodes. The transferred work is attended to as a batch at the dual nodes. Dual nodes permit a number of applications to be modeled including computer file transfer, rework in manufacturing, and internal mail delivery. If there are m dual nodes, the expected waiting time calculation requires solution of a linear system of size n(1 + m) + 2m or less. Often the system size is less, and for a queue with one dual node we prove that a system of only size n is required.

The Pricing of Japanese Equity Warrants

Management Science 1992 38(11), 1610-1641
Discrepancies between the Black-Scholes value of Japanese equity warrants and their observed prices are explained in part by the stochastic volatility of changes in prices of the underlying stocks. We fit GARCH and EGARCH models to the stochastic volatility and briefly compare their performance to the CEV model. A hopscotch algorithm is used to value the warrants in the presence of the stochastic stock price volatility. The stochastic volatility-hopscotch warrant values still differ substantially from corresponding prices; in contrast, away-from-the-money short-term Nikkei 225 options valued with the same stochastic volatility models are close to observed prices. A regression model is used to fit the differences between warrant values and prices as a function of proxies for market impediments.

Reducing Bias in a Personnel Assignment Process via Multiplicative Utility Solution

Management Science 1992 38(2), 227-239
In this paper we consider a type of bias which stems from the mathematical algorithm often used to determine an optimal match between two groups. We compare two different solution concepts for the matching assignment problem: the traditionally stable solution vs. a multiplicative utility approach that should avoid the bias. Simulation modeling leads us to conclude that: (1) With respect to all sizes compared in our experiment, applicants and employers groups were always treated far more equally under the multiplicative utility approach than the stable approach. (2) When using the stable algorithm, the size of the bias is affected by the size of the problem (i.e., the larger the problem size is the larger the performance discrepancy between two groups of participants). Further analyses of the sensitivity of the finding to different assumptions (e.g., correlation in the preference orderings of the two groups, or use of nonlinear conversion from ranks to utilities) also resulted in a superior performance of the multiplicative utility algorithm in terms of a more equitable outcome.

Experiments with Initial Transient Deletion for Parallel, Replicated Steady-State Simulations

Management Science 1992 38(3), 400-418
A simple and effective way to exploit parallel processors in discrete event simulations is to run multiple independent replications, in parallel, on multiple processors and to average the results at the end of the runs. We call this the method of parallel replications. This paper is concerned with using the method of parallel replications for estimating steady-state performance measures. We report on the results of queueing network simulation experiments that compare the statistical properties of several possible estimators that can be formed using this method. The theoretical asymptotic properties of these estimators were determined in Glynn and Heidelberger (1989a, b). Both the theory and the experimental results reported here strongly indicate that a nonstandard (in the context of steady-state simulation), yet easy to apply, estimation procedure is required on highly parallel machines. This nonstandard estimator is a ratio estimator. The experiments also show that use of the ratio estimator is advantageous even on machines with only a moderate degree of parallelism.

Strategic Risk: An Ordinal Approach

Management Science 1992 38(12), 1707-1731
Strategic management researchers have shown increasing awareness of the importance of the concept of risk at the strategic level. In recognition of this interest, this research adopts a commonly used conceptualization of risk and shows how this conceptualization leads to a new measure of risk, based upon the chance of loss of relative position within a set of firms. This framework is shown to be particularly appropriate for strategy research. Information contained in probability distributions describing the relative positions of sets of firms over time is shown to be partitionable on the basis of gain or loss in position as well as on firm identity, leading to the derivation of a new measure of strategic risk for an individual firm. This development also provides a hierarchical quantification of risk at the levels of the industry, group and individual firm. The ordinal risk measure is applied to both hypothetical data for illustration and to data on the U.S. airline industry.

Daily Stock Market Volatility: 1928–1989

Management Science 1992 38(11), 1586-1609
This paper examines the daily return variability of the S&P 500 and the Dow Jones indices over the 1928–1989 period. We use the traditional close-to-close standard deviation of returns, two alternative estimators incorporating the daily high and low of the index, and a robust estimator to measure the volatility of stock index returns. The 1980s were the third most volatile decade behind the 1920s and 30s. To a large extent, this was caused by the anomalous behavior of the fourth quarter of 1987. Returns in the 1980s had far more skewness and kurtosis than in any other decade studied; these results were not entirely due to 1987, as returns in 1988 and 1989 had large measures of both skewness and kurtosis. The frequency of extreme-return events increased in the 1980s, but was still dramatically less than the 1920s and 30s. When extreme negative days occurred in the 1980s the losses tended to be more severe than in the previous four decades. Extreme-return days are preceded by significant losses and are intertemporally clustered. There is no evidence of short-term market reversals after either positive or negative jumps in stock index returns.

Aspiration Level Adaptation: An Empirical Exploration

Management Science 1992 38(5), 623-644
Organizations have been modeled as goal directed systems which use simple decision rules to adapt behavior in response to performance feedback. This paper examines the formation of organizational goals, or aspiration levels, over time in groups of individuals representing top management teams of simulated organizations. The analysis compares the empirical validity of an adaptive attainment discrepancy model with models derived from rational and adaptive expectations theories. The results suggest that the attainment discrepancy model, which is based on a simple decision rule of adjustment to performance feedback, provides the most robust description of aspiration formation. They are also informative with regard to the application of expectation models to aspiration formation: There is a great deal of similarity between these results and those of prior studies on expectation formation. In addition, the study finds that there tends to be an optimistic bias in aspiration formation, that adaptation is not consistently incremental, and that adaptive learning may, over time, lead to behavioral outcomes that are consistent with rationality.

Contracting for Software Development

Management Science 1992 38(3), 307-324
Software contracting is a multi-faceted issue that involves legal, economic, managerial and technological considerations. To better understand the economic aspect of software contracting, this paper provides a summary review of software development contracts, followed by a gametheoretic model developed to incorporate incentive and information issues associated with software contracting. In the model an outside contractor is hired to develop a software system over multiple periods. Due to the uncertainties about costs or technology, the developer faces the risk of having to abandon the project at an intermediate phase. The user is better informed of the benefit of the system, while the developer privately discovers the development costs as the project advances. Given the limited information, the contracting parties make decisions in their own interest, leaving each party vulnerable to the other's opportunistic behavior. In this setting, we construct a viable contract that aligns the incentives of the contracting parties and produces the same equilibrium outcome as in in-house development. We also relate the implications of the model to the actual contract cases.