Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
176 results ✕ Clear filters

Coordinating Investment, Production, and Subcontracting

Management Science 1999 45(7), 954-971
We value the option of subcontracting to improve financial performance and system coordination by analyzing a competitive stochastic investment game with recourse. The manufacturer and subcontractor decide separately on their capacity investment levels. Then demand uncertainty is resolved and both parties have the option to subcontract when deciding on their production and sales. We analyze and present outsourcing conditions for three contract types: (1) price-only contractswhere an ex-ante transfer price is set for each unit supplied by the subcontractor; (2) incomplete contracts, where both parties negotiate over the subcontracting transfer; and (3) state-dependentprice-only and incomplete contracts for which we show an equivalence result. While subcontracting with these three contract types can coordinate productiondecisions in the supply system, only state-dependent contracts can eliminate all decentralization costs and coordinate capacity investmentdecisions. The minimally sufficient price-only contract that coordinates our supply chain specifies transfer prices for a small number (6 in our model) of contingent scenarios. Our game-theoretic model allows the analysis of the role of transfer prices and of the bargaining power of buyer and supplier. We find that sometimes firms may be better off leaving some contract parameters unspecified ex-ante and agreeing to negotiate ex-post. Also, a price-focused strategy for managing subcontractors can backfire because a lower transfer price may decrease the manufacturer's profit. Finally, as with financial options, the option value of subcontracting increases as markets are more volatile or more negatively correlated.

Value of Information in Capacitated Supply Chains

Management Science 1999 45(1), 16-24
We incorporate information flow between a supplier and a retailer in a two-echelon model that captures the capacitated setting of a typical supply chain. We consider three situations: (1) a traditional model where there is no information to the supplier prior to a demand to him except for past data; (2) the supplier knows the (s, S) policy used by the retailer as well as the end-item demand distribution; and (3) the supplier has full information about the state of the retailer. Order up-to policies continue to be optimal for models with information flow for the finite horizon, the infinite horizon discounted and the infinite horizon average cost cases. Study of these three models enables us to understand the relationships between capacity, inventory, and information at the supplier level, as well as how they are affected by the retailer’s (S − s) values and end-item demand distribution. We estimate the savings at the supplier due to information flow and study when information is most beneficial.

Innovations in Financial Services, Relationships, and Risk Sharing

Management Science 1999 45(9), 1239-1253
Relationships between intermediaries and their customers have become increasingly important in recent years. This paper argues that the need for costly ex ante information acquisition and analysis is a major barrier to the participation of investors and firms in sophisticated markets. Long-term relationships between intermediaries and their customers, in which intermediaries provide implicit insurance to customers, can be an effective substitute for costly ex ante investigation. In this way, intermediaries allow firms and investors to reap the benefits of financial markets. Relationships are easiest to sustain when the ongoing benefits to both parties are high. As a result, competition may lower the benefits that can be obtained from relationships.

Project Scheduling Under Partially Renewable Resource Constraints

Management Science 1999 45(4), 543-559
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially renewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make, e.g., timetabling and shift scheduling aspects, amenable to project scheduling. In addition, partially renewable resources serve to model complicated labor regulations. Furthermore, they cover traditional renewable and nonrenewable resource constraints as special cases. We consider makespan minimization as objective. For the exact solution of the problem we employ a basic enumeration scheme. In order to speed up convergence, we formulate bounds which take into account future resource consumption of partially renewable resources. Moreover, we generalize the serial scheduling scheme in order to get fast approximation methods. A rigorous assessment of the procedures is provided by solving ProGen instances generated under a full factorial test design. Besides the well-known problem parameters we employ additionally three parameters which control the generation of partially renewable resources.

Dynamic R&D Investment Policies

Management Science 1999 45(10), 1359-1377
This paper examines dynamic R&D investment policies and the valuation of R&D programs in a contingent claims framework. We incorporate the following characteristics of R&D programs into our model: learning-by-doing, collateral learning between different projects in the program, interaction between project cash flows, periodic reevaluations of the program, different intensities of investment, capital rationing constraints, and competition. We show that a firm may invest in multiple projects even if only one can be implemented after development is complete. Furthermore, the firm may significantly alter its funding policy over time. For example, it may simultaneously develop multiple projects for a period of time, then focus on a lead project, and potentially resume funding of a “backup” project if the lead project fails to deliver on its early promise. We show how a firm can forecast expected R&D spending through time for an optimally executed R&D program. While project volatility plays an important role in determining R&D program value, we find that for high volatility projects the optimal investment policy is not very sensitive to changes in (or misestimation of) volatility. In considering whether to accelerate development of a project, a firm should balance the adverse effects of increased costs and the loss of investment flexibility against the positive effects of rapid uncertainty resolution and accelerated cash flows. In the presence of a budget constraint that prevents the firm from simultaneously accelerating projects and developing projects in parallel, we find that, if one project significantly dominates another early in the development stage, the option to accelerate the lead project is likely to be more valuable than the option to exchange projects. Thus, the backup project would be shelved in order to commit extra resources to development of the lead project. Finally, competition from other firms leads to more parallel investment in the early development stages of projects, less parallel investment in the latter stages of development, and lower overall investment.

A Quantile Regression Approach to Generating Prediction Intervals

Management Science 1999 45(2), 225-237
Exponential smoothing methods do not involve a formal procedure for identifying the underlying data generating process. The issue is then whether prediction intervals should be estimated by a theoretical approach, with the assumption that the method is optimal in some sense, or by an empirical procedure. In this paper we present an alternative hybrid approach which applies quantile regression to the empirical fit errors to produce forecast error quantile models. These models are functions of the lead time, as suggested by the theoretical variance expressions. In addition to avoiding the optimality assumption, the method is nonparametric, so there is no need for the common normality assumption. Application of the new approach to simple, Holt's, and damped Holt's exponential smoothing, using simulated and real data sets, gave encouraging results.

IDEA and AR-IDEA: Models for Dealing with Imprecise Data in DEA

Management Science 1999 45(4), 597-607
Data Envelopment Analysis (DEA) is a nonparametric approach to evaluating the relative efficiency of decision making units (DMUs) that use multiple inputs to produce multiple outputs. An assumption underlying DEA is that all the data assume the form of specific numerical values. In some applications, however, the data may be imprecise. For instance, some of the data may be known only within specified bounds, while other data may be known only in terms of ordinal relations. DEA with imprecise data or, more compactly, the Imprecise Data Envelopment Analysis (IDEA) method developed in this paper permits mixtures of imprecisely- and exactly-known data, which the IDEA models transform into ordinary linear programming forms. This is carried even further in the present paper to comprehend the now extensively employed Assurance Region (AR) concepts in which bounds are placed on the variables rather than the data. We refer to this approach as AR-IDEA, because it replaces conditions on the variables with transformations of the data and thus also aligns the developments we describe in this paper with what are known as cone-ratio envelopments in DEA. As a result, one unified approach, referred to as the AR-IDEA model, is achieved which includes not only imprecise data capabilities but also assurance region and cone-ratio envelopment concepts.

Measures of Perceived Risk

Management Science 1999 45(4), 519-532
Based on our previous work on the standard measure of risk, this paper presents two classes of measures for perceived risk by decomposing a lottery into its mean and standard risk. One of the classes of our risk measures presumes that there is no risk when there is no uncertainty involved, and the other allows different degenerate lotteries to be evaluated with different values of “risk.” The former has more prescriptive appeal in risky decision making, but the latter may have more descriptive power for subjective risk judgments. Our risk measures can also take into account the asymmetric effects of losses and gains on perceived risk based on an appropriate choice of the standard measure of risk. The perceived risk models we propose unify a large body of empirical evidence regarding risk judgments, and provide sufficient flexibility to better capture people's perceptions of risk than previously developed risk models. In particular, our risk measures provide clear ways to accommodate financial measures of risk and psychological measures of risk, and they can be incorporated into preference models in an appealing form based on mean-risk tradeoffs.

Improving Service by Informing Customers About Anticipated Delays

Management Science 1999 45(2), 192-207
This paper investigates the effect upon performance in a service system, such as a telephone call center, of giving waiting customers state information. In particular, the paper studies two M/M/s/r queueing models with balking and reneging. For simplicity, it is assumed that each customer is willing to wait a fixed time before beginning service. However, customers differ, so the delay tolerances for successive customers are random. In particular, it is assumed that the delay tolerance of each customer is zero with probability β, and is exponentially distributed with mean α −1 conditional on the delay tolerance being positive. Let N be the number of customers found by an arrival. In Model 1, no state information is provided, so that if N ≥ s, the customer balks with probability β; if the customer enters the system, he reneges after an exponentially distributed time with mean α −1 if he has not begun service by that time. In Model 2, if N = s + k ≥ s, then the customer is told the system state k and the remaining service times of all customers in the system, so that he balks with probability β + (1 − β)(1 − q k ), where q k = P(T > S k ), T is exponentially distributed with mean α −1 , S k is the sum of k + 1 independent exponential random variables each with mean (sμ) −1 , and μ −1 is the mean service time. In Model 2, all reneging is replaced by balking. The number of customers in the system for Model 1 is shown to be larger than that for Model 2 in the likelihood-ratio stochastic ordering. Thus, customers are more likely to be blocked in Model 1 and are more likely to be served without waiting in Model 2. Algorithms are also developed for computing important performance measures in these, and more general, birth-and-death models.

A Punctuated-Equilibrium Model of Technology Diffusion

Management Science 1999 45(2), 160-177
We present an evolutionary model of technology diffusion in which an old and a new technology are available, both of which improve their performance incrementally over time. Technology adopters make repeated choices between the established and the new technology based on their perceived performance, which is subject to uncertainty. Both technologies exhibit positive externalities, or performance benefits from others using the same technology. We find that the superior technology will not necessarily be broadly adopted by the population. Externalities cause two stable usage equilibria to exist, one with the old technology being the standard and the other with the new technology the standard. Punctuations, or sudden shifts, in these equilibria determine the patterns of technology diffusion. The time for an equilibrium punctuation depends on the rate of incremental improvement of both technologies, and on the system’s resistance to switching between equilibria. If the new technology has a higher rate of incremental improvement, it is adopted faster, and adoption may precede performance parity if the system’s resistance to switching is low. Adoption of the new technology may trail performance parity if the system’s resistance to switching is high.