This article discusses the concept of RTS (Returns To Scale) in the framework of DEA (Data Envelopment Analysis) production and cost analyses, focusing on an occurrence of multiple solutions and how to deal with such a difficulty. Dual relationships between production-based and cost-based RTS estimates are also theoretically discussed in this study.
Overlapping development activities is widely used to reduce project completion times in product development. However, research on the applicability of the concept in different technological environments remains scarce. So far, very few industry-specific studies have statistically confirmed an accelerating effect of overlap. In the present article we statistically measure the effectiveness of overlapping development activities in reducing project completion time. Building on analytical research in operations management, we argue that this effectiveness differs with the organization's capability to resolve uncertainty early in the process. Projects benefit more from overlap if they are able to resolve uncertainty early. This contingency view to overlapping development activities is tested based on data from 140 completed development projects across several global electronics industries.
Demand uncertainty is a key concern of electric utility planners. While the greater use of short lead time technologies provides one possible way to deal with this problem, it is not clear how they are best deployed. The approach taken in this paper is to examine a capacity mix model that explicitly accounts for differences in technology lead times. Key results that are obtained include the characterization of the optimal solution and the development of a new set of technology screening criteria. In practice, the “lead time order” (i.e., the set of available technologies ordered by ascending length of lead time) is typically the inverse of the so-called merit order (i.e., the set of available technologies ordered by ascending operating cost). We show that for this case, the optimal solution may be determined with relative ease. A numerical example demonstrates that some short lead time technologies screened out by standard planning methods may enter the optimal solution when differences in lead time are considered, while some long lead time technologies may leave. In addition, the optimal expected level of reliability may be greater.
We provide a generic Monte Carlo method to find the alternative of maximum expected utility in a decision analysis. We define an artificial distribution on the product space of alternatives and states, and show that the optimal alternative is the mode of the implied marginal distribution on the alternatives. After drawing a sample from the artificial distribution, we may use exploratory data analysis tools to approximately identify the optimal alternative. We illustrate our method for some important types of influence diagrams.
The retrieval of items from storage is a chore faced by virtually every business concern. Walk/ride and pick systems are a popular method for performing this chore in many applications. When retrieval requests consist of multiple items, order pickers must travel to numerous storage locations to complete each order. When these requests are made in sufficient volume, a method of order retrieval known as batch picking is often used. Batch picking is a popular approach in the mail-order industry and is employed in industrial settings such as tool cribs and in warehouses, which service assembly line operations. Batch construction heuristics are developed and tested under three strategies for assigning storage space to individual items that have been suggested in the literature. Our results are derived from the simulation of a single hypothetical warehouse model. Specifically, we employ a model that is square in travel distance and assume the walk and pick method of order retrieval with sequential one-way travel. Sensitivity analysis is performed on workforce level and batch size. Our results indicate that the methods used for constructing batches of orders and for assigning storage space to individual items can significantly impact order retrieval efforts in warehouses of this type.
We show how, from a single simulation run, to estimate the ruin probabilities and their sensitivities (derivatives) in a classic insurance risk model under various distributions of the number of claims and the claim size. Similar analysis is given for the tail probabilities of the accumulated claims during a fixed period. We perform sensitivity analysis with respect to both distributional and structural parameters of the underlying risk model. In the former case, we use the score function method and in the latter, a combination of the push-out method and the score function. We finally show how, from the same sample path, to derive a consistent estimator of the optimal solution in an optimization problem associated with excess-of-loss reinsurance.
One of the private line network design problems in the telecommunications industry is to interconnect a set of customer locations through a ring of end offices so as to minimize the total tariff cost and provide reliability. We develop a Tabu Search method for the problem that incorporates long term memory, probabilistic move selections, hierarchical move evaluation, candidate list strategies and an elite solution recovery strategy. Computational results for test data show that the Tabu Search heuristic finds optimal solutions for all test problems that can be solved exactly by a branch-and-cut algorithm, while running about three orders of magnitude faster than the exact algorithm. In addition, for larger size problems that cannot be solved exactly, the tabu search algorithm outperforms the best local search heuristic currently available. The performance gap favoring Tabu Search increases significantly for more difficult problem instances.
Drawing on the premise that the diversification decisions are driven by antecedent factors such as a firm’s existing resources (Teece 1982) and industry structural conditions, this paper develops formal hypotheses for reciprocity between the type of diversification and mode of expansion decisions. We consider the specificity of antecedent resources that affect these two decisions and conceptually demonstrate that there is a contradictory tension in trying to optimize the decisions jointly implying that one or both diversification decisions have to be sub-optimized (i.e., there has to be a trade-off). We make a conceptual argument that this sub-optimization is likely to be in the form of subordination of the mode decision subject to constraints imposed by resources that are highly specific to the mode decision. Following this, we empirically investigate this contradictory tension by using a simultaneous equation model (SEM) on a large sample of firms between 1981 and 1989. The results suggest that one antecedent factor—internal funds—act as the key mediating influence in the joint optimization and leads to a subordination of the mode decision in the joint optimization process. However, the existence of time compression economies and market power benefits are the exceptions to this subordination and trade off process.
The Medicare Prospective Payment System (PPS) is analogous to an insurance scheme in which financial risk is mitigated through experience rating. In addition, risk is also mitigated through reinsurance provisions. Although a provider may not want this reinsurance, participation is mandatory. We develop a framework for evaluating financial risk under the PPS. We use this framework to examine optional reinsurance as an alternative risk mitigation mechanism. We illustrate an application of optional reinsurance using data for Medicare psychiatric inpatient services. Our analysis indicates that viable schemes exist for implementing optional reinsurance as a prospective payment option.
Since the early 1980s, the diffusion of Just-In-Time (JIT) manufacturing from Japanese manufacturers to U.S. manufacturers has progressed at an accelerated rate. At this stage of the diffusion process, JIT implementations are more common and more advanced in large U.S. manufacturers than in small; consequently, U.S. businessmen’s understanding of issues associated with JIT implementations in large manufacturers is more developed than that of small manufacturers. When small manufacturers represent about 96 percent of all U.S. manufacturers, investigation of JIT implementations in small, as well as large, manufacturers is warranted. This survey study investigates JIT implementation differences between small and large U.S. manufacturers. Ten management practices that constitute the JIT concept are used to examine implementation of JIT manufacturing systems. Odds ratio were constructed to determine if an association exists between implemented versus not implemented and manufacturer size for each JIT practice. Ten changes in performance attributed to JIT implementation are also assessed and examined in the study. Logistic regression models are used to examine the relationships between implementation status of each of the JIT practices and of each of the changes in performance in small and large manufacturers. The results of the study show that the frequencies of the 10 JIT management practices implemented differ between the two groups of manufacturer size, and an association exists between the JIT practices implemented and manufacturer size. Moreover, the changes in performance attributed to JIT implementation vary, depending on implementation status of specific JIT management practices and manufacturer size.