Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:

Mathematical Programming and Service Scheduling

Management Science 1957 3(2), 140-148
There are many business situations where it might be necessary to keep the potential service level (preparedness) above requirements at least in some of the time intervals. For instance, a fleet of trucks (or cabs) or group of production machines, cannot be easily adjusted month by month and, therefore, during slack periods the potential service level may exceed requirements. In a manufacturing firm, there are certain functions to be performed, such as maintenance or clerical work (often overhead type functions), where again the potential service level is expensive to change. In fact, even in the case of production workers, the expense of hiring, training, firing, or the contractual obligations of guaranteed wage agreements may make it undesirable to change the level of employment during slack periods. The reader will readily find further illustrations of the type of planning problems we are describing here.

Air Force Progress in Logistics Planning

Management Science 1957 3(3), 213-224
This is a progress report on the Air Force use of scientific procedures in programming and planning. The use of scientific methods, in the development of Air Force programs and plans and in the determination of the logistic support required, has occurred primarily in association with the use of large-scale electronic data processing systems. Therefore, in discussing progress I will be dealing for the most part with work done in connection with such systems.

Economic Equipment Policies: An Evaluation

Management Science 1957 4(1), 20-37
The present paper summarizes the results of a detailed empirical investigation of the theory of economic equipment policy as applied to one important kind of industrial equipment, viz line-haul truck-tractor power units. The objective of this research was to ascertain, for a type of equipment which is perhaps best suited to exact replacement analysis, the quantitative importance to the firm of following optimal policies in replacement and in the choice of equipment type. Also it was desired to compare actual with optimal policies in a concrete case.

Large Data-Handling Equipment as a Commercial Tool

Management Science 1957 4(1), 92-98
The primary purpose of this paper is to present for management an approach to the employment of large data-handling equipment in commercial problems. This approach is in the form of guideposts which, in a very general way, may indicate to people without a background in the data processing field, major requirements to consider or problems which will be encountered in connection with this employment. The problem arises in the military departments largely in connection with logistics and throughout non-military governmental and nongovernmental operations.

Expectations and Undesired Inventory

Management Science 1957 4(1), 105-109
Both economists and businessmen are interested in knowing whether inventories are higher or lower than firms desire: Economists because it would provide a clue to the structure of business expectations, businessmen because it would give some indication of the future trend of business. In this paper a model is presented with the aid of which an estimate, however crude, of the amount of undesired inventory in the economy is made from market data.

A Note on the Modigliani-Hohn Production Smoothing Model

Management Science 1957 3(4), 371-379
Modigliani and Hohn [Modigliani, F., F. E. Hohn. 1955. Production planning over time. Econometrica 23 (1, January) 46–66.] have formulated a production planning and inventory control model that appears relevant to an important class of non-stochastic decision-making problems. It is the purpose of this note to suggest: (1) that the Modigliani Hohn problem may be studied in terms of linear programming as well as through the calculus model originally employed; (2) that by working through the stock-flow relationships, it is possible to effect certain conceptual and computational improvements over Edward Bowman's original method for converting this type of problem into the “transportation” form [Bowman, E. H. 1956. Production scheduling by the transportation method of linear programming. J. Oper. Res. Soc. America 4 (1, February) 100–103.]; and (3) that the linear programming version is especially suitable for tracing out the cost implications of stabilizing the work force at alternative levels. Like the “caterer problem” [Jacobs, W. 1954. The caterer problem. Naval Res. Logist. Quart. 1 (2, June) 154–165.] and the “warehousing problem” [Charnes, A., W. W. Cooper. 1955. Generalizations of the warehousing model. Oper. Res. Quart. 6 (4, December) 131–172.], this linear programming model represents another instance in which every basis is pure triangular and contains no elements but zero, +1, and −1.

Sequential Production Planning Over Time at Minimum Cost

Management Science 1957 3(4), 435-437
Production of a given commodity is to be scheduled over time to meet known future requirements while minimizing total costs. The costs include both storage and production costs as functions of time. The unit production cost is an increasing function of the production rate. Previous solutions to this problem have involved complicated iterative procedures. A new approach brings out the basic principle involved and leads to a surprisingly simple solution. This coincides with a common-sense technique sometimes used in business.

On The Computational Solution of Linear Programming Problems Involving Almost-Block-Diagonal Matrices

Management Science 1957 3(4), 403-406
In this paper we wish to attack a problem which arises from the study of weakly coupled economic systems, or alternatively from the study of multi-stage processes with almost-independent stages. Here the “weakness” of coupling and the “almost-independence” is measured by the number of state variables at one stage which depend on the variables of the preceding stage. By means of the functional equation technique of dynamic programming, we shall show that the computational solution can be reduced to that of the computation of a sequence of functions of one variable, in the particular problem we treat.

Limitations of the Scientific Method in Management Science

Management Science 1957 3(3), 225-233
The scientists who have suggested improvements of the techniques of managerial analysis and decision making through the application of the “scientific method” have called attention to a worthwhile and important goal. Their proposals are bound to initiate a process of self-analysis and re-appraisal of the current methodical foundations of managerial policies. But the challenge in itself—even if made in a very determined manner—is no proof of its correctness and adequacy though this seems to be the opinion of some of the challengers. In order to arrive at a final conclusion it is essential to determine whether the scientific method is as applicable and valuable in the managerial field as it has proven to be in the physical sciences. The basic assumptions and procedures of the scientific method must be examined as a prerequisite for such a determination. No comprehensive analysis of such a broad problem is possible within the scope of this paper. The presentation will have to be restricted to a few characteristic examples to indicate the fundamental trends. Much more work will have to be done as a preliminary for reaching results which may be widely accepted. The principal purpose is to encourage such work.

Ss Inventory Policy with Variable Delivery Time

Management Science 1957 3(4), 431-434
In this paper we study the question of determining an Ss inventory policy in the presence of delivery time being a random variable. Otherwise the usual conditions of the problem are retained (demand is considered a random variable, etc.). We will use the basic work of Whitin (Whitin, Thomson M. 1953. The Theory of Inventory Management. Princeton University Press, Princeton.), as a starting point, and develop our analysis as an extension of his exposition (where delivery time is taken as being constant). It will be our purpose to derive formulas for the determination of the order size and of the reordering point.