Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
125 results ✕ Clear filters

Management Science Update Column—The Past, Present and Future Histories of an Old Paper

Management Science 1981
One of my University of Pennsylvania professors, Kenneth D. MacKenzie (now at the University of Kansas), sent in this update of his December 1970 Management Science article “Analysis of a Decision Making Investigation.” Once I saw Ken's title (above) for this update. I knew we were in for some fun. I've cut the essay a little and I've knocked out Ken's lengthy bibliography of related articles and books (which you may want to write him about) because Marty Starr likes to run some new stuff in this journal, too.

Benefit-Cost Analysis of a Proposed Runway Extension

Management Science 1981 27(2), 155-173
This paper describes a benefit-cost analysis of a proposed $1.4 million runway extension at Kelowna Airport, in Kelowna, British Columbia (Canada's westernmost province). Lengthening the runway as proposed would allow Pacific Western Airlines to operate their Boeing 737 aircraft out of Kelowna with heavier payloads, thereby reducing the occurance of situations where the combined passenger and cargo demand exceeds the available weight capacity of the aircraft. The problem is complicated by the fact that the maximum payload weight permitted on take-off varies considerably with the air temperature and wind speed and direction at the time of departure. On hot summer days, when the problem is most severe, it is sometimes necessary to remove all of the cargo from the aircraft, and, at times, to limit the number of passengers taking the flight to less than the number of seats. An alternative means of achieving the objectives of the runway extension was also considered: lowering the average demand per flight by simply increasing the number of flights out of Kelowna. The “Runway Extension” and “Additional Flights” options were evaluated in terms of their net economic benefits, as compared with the “Do Nothing” option. Net economic benefit is the present value of economic benefits less the present value of economic costs. The economic benefits depend upon the extent to which unsatisfied passenger and cargo demand would be reduced, and on the unit economic costs of unsatisfied passenger and cargo demand. Estimates of the reductions in unsatisfied demand were obtained by means of a probability model that is similar to ones used to solve single-period, stochastic inventory planning problems. The unit economic costs were not estimated; rather, the economic benefits were expressed as linear functions of the unit economic costs of unsatisfied passenger and cargo demand. The economic cost of the “Runway Extension” option was the cost of constructing and maintaining the runway extension; the cost of the “Additional Flights” option was the cost to Pacific Western Airlines of providing the additional flights out of Kelowna. The numbers of such additional flights were chosen to produce the same amount of unsatisfied passenger demand as that which had been estimated for the “Runway Extension” option. Those responsible for deciding whether the runway should be extended were asked to judge the values of the unit economic costs of unsatisfied passenger and cargo demand, thus determining which of the three options was preferred on economic grounds. Prior to the study. Transport Canada had formally recommended the proposed runway extension to the Treasury Board (the Cabinet Committee of the Canadian Government that controls government expenditures). The Treasury Board requested the Department to reconsider the project, and as a result, a benefit-cost analysis was undertaken. Because of the conclusions of the study. Transport Canada decided to postpone indefinitely the lengthening of the runway. The runway may still be lengthened sometime in the future to accommodate aircraft that require a longer runway than does the Boeing 737, but only if a subsequent analysis shows that the resulting benefits would exceed the costs. Having been successfully applied at Kelowna Airport, the methodology developed in this study has now been adopted by Transport Canada for evaluating proposed runway extensions at other Canadian airports.

A Greedy Heuristic for Single Machine Sequencing with Precedence Constraints

Management Science 1981 27(10), 1209-1216
We present a greedy heuristic for the n job/1 machine scheduling problem with precedence constraints. This method is useful whenever the manager's optimization criteria is the sum of weighted or unweighted completion times, the sum of weighted or unweighted flow times, (with or without release dates), the sum of weighted or unweighted working times, the sum of weighted or unweighted lateness, average completion time, average flow time, average waiting time or average lateness. The greedy heuristic found the optimal solution for 58 of 68 test problems for which a branch and bound method was used to find the optimal solution. The heuristic is, of course, much easier to implement (and executes in less time). The greedy heuristic fared well in comparison with a simple myopic heuristic presented by Morton and Dharan (Morton. T. E., B. G. Dharan. 1978. Algoristics for single machine sequencing with precedence constraints. Management Sci. 24 (10) 1011–1020.).

Variable-Base Budgeting for R&D

Management Science 1981 27(5), 547-558
An issue of theoretical and practical importance to R&D managers is the proper allocation of an organization's resources between the periodic selection and budgeting of R&D projects and the implementation of these projects. One possibility is to consider previous allocations as an established base and to restrict the attention of R&D managers to an examination of any subsequent deviations from the base. The advantage of this strategy, often called incremental budgeting, is that it focuses managerial and analytical efforts on a few current decisions. A second possibility, called zero-base budgeting, is to ignore previous allocations and to reexamine all feasible alternatives at the start of each budget cycle. This paper presents three models, a static model and two dynamic models, in which incremental and zero-base allocation procedures are viewed as extremes between which there may be a point of diminishing returns. The models are risk/return models in which a total budget is allocated between the budgeting effort, which reduces risk, and the budgeted activities, which increase expected return. The budget for each activity during each time stage is partitioned into two components—a base and an increment. The expected return for each activity is a concave increasing function of its budget, and the risk depends quadratically on the base and in a geometrically decreasing fashion, on the bases in previous stages. The cost of evaluation is proportional to the increment, and the total cost of all activities, when added to the budgets for the activities, cannot exceed a fixed total budget. Zero-base budgeting means setting the base to zero so that the budget equals the increment plus the cost of evaluation. It is shown that a policy of zero-base budgeting during all time stages is nonoptimal, but an instance of zero-base budgeting during a single stage may be optimal.