Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
142 results ✕ Clear filters

Kidney Transplantation: A Simulation Model for Examining Demand and Supply

Management Science 1985 31(5), 515-526
In most regions of the United States there is a serious imbalance between the number of kidneys donated for transplantation and the number of persons wishing to receive a transplant. This not only affects the quality of life of those unable to obtain a transplant, but it also has important repercussions on the large and rapidly growing federal expenditures for the treatment of end-stage renal disease by transplantation and dialysis. A simulation model was constructed to assess the impact that changes in the number of cadaveric kidneys donated in Michigan would have on the waiting list of potential kidney transplant recipients in the state. The model represents the process of matching donated kidneys to people on the waiting list, taking into account the compatibility of the donor with the potential recipient's blood type and the tissue compatibility of the recipient to the donor as estimated by cytotoxicity. We describe the structure and data needs of the model, and we discuss the results obtained for Michigan. It was found that, under the current conditions, the waiting list would continue to grow rapidly. The number of donors needed to compensate for this growth would have to be disproportionately large: as the number of donations increases the effect of each donation in reducing the waiting list is less. The approach is applicable to other regions and it should also be adaptable to other types of organ transplants that require tissue compatibility, once such transplants become common enough to warrant regional coordination of the matching of recipients with donors.

Optimal Weighted lp Norm Parameters for Facilities Layout Distance Characterizations

Management Science 1985 31(2), 200-206
The distances used in certain types of industrial, office or street grid layouts are often assumed to be rectangular. Because of the “doubling back” effect caused by finite block and facility sizes, actual distances travelled are often much greater than indicated by the l 1 norm. In this study the weighted l p norm is fitted to a certain commonly occurring class of layout patterns. The optimal best-fit parameters are reported in addition to other observations which should be useful to users of distance models. The results give strong support for the use of the l 1 norm in determining optimal facility locations when travel distances are rectangular and doubling back occurs. However, the l 1 norm is not appropriate for modelling actual travel distances under the same circumstances.

Application of Sequential Testing to Motor Vehicle Emission Certification

Management Science 1985 31(3), 249-263
A new structure for economically-based sequential inspection plans is developed for use in motor vehicle emission testing. The structure allows for multiple attributes, multiple sources of randomness, misclassification of inspected items, and adjustment of cost parameters to produce desirable classical properties. Specific sequential plans are developed for the Environmental Protection Agency's motor vehicle certification program and are applied retrospectively to vehicles tested in the past. The use of such plans in the past could have saved resources while resulting in no significant degradation in performance. Both the structure and computational methods used have potential application to other sampling inspection problems.

Optimal Capacity Expansion Over an Infinite Horizon

Management Science 1985 31(12), 1523-1532
The problem of choosing an optimal initial capacity expansion from a finite number of durable facility sizes is affected by potential future expansion decisions. As we consider such expansions over longer and longer study horizons, the optimal initial facility choice can fluctuate due to end-of-study effects. We discuss an algorithm that will determine, for arbitrary deterministic demand profiles, how long a horizon is sufficient to reach stability in the first facility choice. Moreover, it is shown that this first choice is the optimal first choice for the infinite horizon problem. We also establish an explicit analytical formula for a study horizon guaranteed to provide a first facility size that, followed by an infinite horizon expansion strategy, will attain a discounted cost within a predetermined maximal error of the optimal infinite horizon cost.

Beta in Linear Risk Tolerance Economies

Management Science 1985 31(11), 1390-1402
This paper employs numerical means to examine: (i) the expected return-beta plot in power utility Linear Risk Tolerance (LRT) economies, and (ii) whether, in the power utility economies, a valuation equation containing covariance and coskewness terms might better explain expected returns than one containing covariance terms alone. The results show that the expected return-beta plots constructed from real world return distributions are very similar to the plots found in empirical tests of the Mean Variance Capital Asset Pricing Model (MV CAPM). Hence a power utility LRT CAPM may provide a better theory of asset pricing than the MV CAPM does. While beta is not the correct measure of risk in power utility LRT economies, the results show that on average a valuation equation containing covariance terms only explains expected returns better than a valuation equation containing both covariance and coskewness terms.

New Polynomial Shortest Path Algorithms and Their Computational Attributes

Management Science 1985 31(9), 1106-1128
This paper presents six new variants of the polynomially bounded Partitioning Shortest Path (PSP) algorithm for finding the shortest path from one node to all other nodes in a network. Three of these variants, one for negative arc lengths, but without negative cycles, and two for nonnegative arc lengths, augment the PSP algorithm to maintain a property called sharp by Shier and Witzgall. The other three variants augment the PSP algorithm to maintain a property called near-sharp for nonnegative arc lengths. Extensive computational testing is presented on one of the sharp variants for nonnegative arc lengths and two of the near-sharp variants. The empirical results based on 4500 test problems with 90 different configurations and three different network topologies indicate that these new algorithms have excellent computational performance characteristics. Based on total solution times for the 4500 test problems, these new algorithms out-perform all other algorithms tested. In addition, one of the near-sharp algorithms strictly dominates all others on all problem topologies tested.

An Autoregressive Process for Beta Random Variables

Management Science 1985 31(8), 988-997
Two stationary first-order autoregressive processes with Beta marginal distributions are presented. They are both linear, additive processes but the coefficients are Beta random variables. Their autocorrelation functions are investigated: one is positive and the other alternates in sign. The usefulness of the models in simulation is discussed. The Bivariate Beta distributions of two consecutive observations are considered in some detail. Several examples are given, including a Bivariate Uniform process which is also examined in detail. The relationship of these Bivariate Beta distributions to the Dirichlet distribution is discussed.

Focused Scheduling in Proportionate Flowshops

Management Science 1985 31(7), 852-869
The proportionate flowshop is a special class of flowshops in which the operation times of jobs are proportionate, e.g., because of differences in the speeds of machines. In this paper, we make use of a special property of proportionate flowshops, namely that the bottleneck in the shop is almost always the one where job operations are proportionately longer than for any other operations (the slowest machine) to demonstrate a scheduling procedure that makes scheduling decisions by focusing on the information and consequences at the bottleneck resource. This is called the Focused Approach. The scheduling objective is to minimize the total tardiness cost of jobs, where each job may have a different tardiness cost. The decision rule used in this approach is the Idle Time Rule whose development is described in this paper. The approach was tested using approximately proportionate flowshops of different sizes. The results obtained for small 3-machine problems were compared against the optimal permutation schedules obtained using Branch-and-Bound and was found to be near-optimal. For larger problems using 4- and 8-machine flowshops, the results were compared to five other scheduling methods. The focused approach performed far better than those other scheduling methods not only in minimizing tardiness cost, but also minimizing the percentage of tardy jobs and the percentage of processing time to work-in-process time. Finally, the two-product shop where the bottleneck was dynamic was studied and, using a simple strategy to track bottlenecks, the focused approach was again found to perform well compared with other heuristic methods.

Risk/Return Performance of Diversified Firms

Management Science 1985 31(7), 785-799
Based on a sample of 80 firms, this paper examines the risk/return performance of related and unrelated diversified firms at the level of accounting data. The results suggest that although on the average related diversified firms outperform unrelated diversified firms, related diversification offers no guarantee of a favorable risk/return performance. (Many low performers are related diversifiers.) In fact, different diversification strategies can result in similar risk/return performance. However, a favorable risk/return performance is extremely hard to achieve with unrelated diversification. The study identifies diversified firms that have managed to simultaneously reduced risks and increase returns. The results indicate that these firms differ from other firms on some managerially useful dimensions. The differences suggest clues to guide other diversified firms to improve their risk/return performance.

An Improved Successive Linear Programming Algorithm

Management Science 1985 31(10), 1312-1331
Successive Linear Programming (SLP) algorithms solve nonlinear optimization problems via a sequence of linear programs. They have been widely used, particularly in the oil and chemical industries, beginning with their introduction by Griffith and Stewart of Shell Development Company in 1961. Since then, several applications and variants of SLP have appeared, the most recent being the SLPR algorithm described in this journal in 1982 (Palacios-Gomez et al.). SLP procedures are attractive because they are fairly easy to implement if an efficient, flexible LP code is available, can solve nonseparable as well as separable problems, can be applied to as large a problem as the LP code can handle (often thousands of constraints and variables), and have been successful in many practical applications. This paper describes a new SLP algorithm called PSLP (Penalty SLP). PSLP represents a significant strengthening and refinement of the SLPR procedure described in Palacios-Gomez et al. (Palacios-Gomez, F., L. Lasdon, M. Engquist. 1982. Nonlinear optimization by successive linear programming. Management Sci. 28 1106–1120.). We give a convergence proof for PSLP—the first SLP convergence proof for nonlinearly constrained problems of general form. This theory is supported by computational performance—in our tests, PSLP is significantly more robust than SLPR, and at least as efficient. A Fortran computer implementation is described. A simplified version of PSLP has already solved several “real world” NLP problems at Exxon (Baker and Lasdon [Baker, T. E., L. S. Lasdon. 1985. Successive linear programming at Exxon. Management Sci. 31 (March) 264–274.), including nonlinear refinery models of up to 1000 rows. As with other SLP algorithms, PSLP is especially efficient on problems which are highly constrained, i.e., which have nearly as many active constraints as there are variables. For problems with vertex optima (at least as many active constraints as variables), it is quadratically convergent. Nonlinear refinery models often have vertex optima, since they are large and mostly linear, and on line process unit optimization problems are likely to possess highly constrained solutions as well. PSLP has great potential for accurate, efficient solution of such problems.