Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:

The Balance Delay Problem

Management Science 1961 8(1), 69-84
Balance delay time is the amount of idle time on production assembly lines caused by the uneven division of work among operators or stations. It is related to the extent and way the total task is subdivided. In this paper the problem of balance delay is treated empirically and analytically. Empirical studies show that high balance delay is associated with a wide range of work-element times and a high degree of line mechanization. The analytical study yields a general algebraic method of minimizing balance delay by the appropriate choice of cycle times. Balance delay functions are drawn and the condition of perfect balance is shown to coincide with the zero points of these functions.

On an Industrial Programming Problem of Kantorovich

Management Science 1961 8(1), 13-17
This paper is a presentation of a maximization problem treated by L. V. Kantorovich [Kantorovich, L. V. 1957. On methods of analysis of some extremal problems in planning production. Doklady Akademii Nauk SSSR 115 441–444. (Russian) In translation: Rand Corporation T-86 dated 15 April 1958]. The problem concerns a linear model for industrial production, but the objective is to maximize a non-linear function of the output. Specifically, a certain composition or package of final products is ordered, and the size of this output of predetermined composition is to be as large as possible.

A Family of Inventory Models

Management Science 1961 7(4), 351-371
An inventory control model in which the state of the system is reviewed only at discrete, equally spaced time intervals is studied. A procurement is made if at the review period the inventory position of the system is less than or equal to a number k. The quantity procured is an integral multiple of a number Q. The total expected cost of review, procurement, holding inventory, and stockouts is determined under the assumption that all demands are ultimately met. The cost of a stockout is taken to consist of a fixed cost per unit out of stock plus a variable cost which is proportional to the time out of stock. Specific expressions for all the cost expressions are found for the case of (1) Poisson demands and fixed lead times, and (2) Poisson demands and gamma lead times. It is shown that many of the inventory models discussed in the literature are special cases of the model here described.

The Role of Management Games in Education and Research

Management Science 1961 7(2), 131-166
This paper is intended to be a broad survey of both the present and the potential role of management games in education and research. Against a background of the history of business games, we first try to characterize the present development of these games. A few management games are described in some detail, and a number of others are mentioned only briefly. The differences between general and functional business games are discussed. Present uses of management games as a teaching device are surveyed and evaluated. Some hypotheses regarding the relations between the design and administrative characteristics of a business game and its educational properties are also formulated. What might be a major improvement over existing management games, here named the “game case,” is then suggested. In the concluding portion of this paper, the potential use of management games as a laboratory for business and social science research is surveyed. Some methodological problems which would arise from research uses of business games are also discussed.

A Linear Programming Model for Long Range Capacity Planning

Management Science 1961 7(4), 372-378
In comparing long- and short-term commitments to fulfill demand for some kind of capacity, a linear formulation of the problem may prove useful. The general capacity-planning problem treated here is that in which the demand for capacity may be met by ownership, leases of various terms, or spot contracts. Certain kinds of machine capacity, tankers, or trucks might be examples. Variations in demand and prices for the various alternatives give rise to a computational problem of considerable proportions and in addition one must account for the firm's time preference for money. A linear model is presented to aid in developing answers to such questions as the following: (1) What effect will any given demand forecast have on capacity plans, (2) what will be the effect of an expected change in ownership costs, (3) if prices for leased capacity increase by some given amount, how will plans and costs be affected, (4) what is the sensitivity of decisions and costs to forecast error? Computation of an optimal plan under various assumed conditions should provide (1) the best policy for the expected future and (2) those changes in policy which ought to follow from changed conditions.

Remarks on Anatol Rapoport's Paper

Management Science 1961 7(3), 224-230
Professor Rapoport's article in this issue (Rapoport, A. 1961. Three modes of conflict. Management Sci. 7 (3) 210–218.), and his recent book on the same subject, “Fights, Games and Debates,” provide mush valuable insight into the problems of conflict resolution. I am in agreement with this principles for the resolution of conflicts among individuals, whenever his basic assumptions are applicable. The application of these principles is difficult even in individual debate under favorable circumstances, as is evidenced by the wide discrepancy between Professor Rapoport's precepts and his practice as displayed in his comments on my paper in this issue. These principles are incomparably more difficult to apply in disputes between nations, in which the protagonists are not free agents, but must each answer to a constituency some part of which, at least will criticize his every move. Further, I question the applicability of Professor Rapoport's basic assumptions in the case of the present East-West conflict. Professor Rapoport assumes implicitly that both parties to a conflict wish to resolve it; and he assumes explicitly that both parties have a similar psyche. I do not believe that either of these assumptions is valid as applied to the current conflict between the U.S. and the Soviet Union.

A Nonlinear Programming Technique for the Optimization of Continuous Processing Systems

Management Science 1961 7(4), 379-392
A description is given of a method for solving some nonlinear programming problems. The mathematics of this method are quite simple and are easy to apply to electronic computation. A numerical example, a model construction example, and a description of a particular existing computer system are included in order to clarify the mode of operation of the method.

On Production Smoothing

Management Science 1961 7(3), 286-293
The production planning model of Modigliani and Hohn and the smoothing model of Hoffman and Jacobs are combined. The most interesting result is that the horizon planning properties of the individual models are retained in the combined model. Methods are also given for the computation of optimal production schedules for certain kinds of requirements schedules.

Aggregation of Utility Functions

Management Science 1961 7(4), 337-350
We are primarily concerned here with the question of integrability of the total demand in a model in which each consumer acts according to a cardinal utility function and has a fixed monetary income. It is well known that concavity of the various utilities is not sufficient to guarantee integrability, nor even to ensure rationality of the revealed preference. We show that if each personal utility function is homogeneous, in addition to satisfying the usual regularity conditions, then an aggregate utility function can be defined explicitly in terms of the given utilities. Furthermore, under the same assumptions we give a new characterization of equilibrium and show that equilibrium satisfactions are unique.

Computer Management Control Systems Through the Looking Glass

Management Science 1961 7(4), 411-419
A discussion of three aspects of the introduction of real time computer executive control systems into the world of business, using as a frame of reference the experience acquired through the design and operation of a similar military system, SAGE, over the past several years. In particular, consideration is given to the relative effectiveness with which the system communicates with its environment, the necessary compromises in the definition of the rules by which the system will function, and certain difficulties in the concept of executive control systems which are in some sense adaptive.