Starting with a market model of security returns, we describe how the parameters of a distribution for security characteristics can be estimated in a manner correcting for a subtle but significant source of error. When this error is removed, strong negative correlations between “alpha” and “beta” and between “alpha” and “sigma squared,” and a strong positive correlation between “beta” and “sigma squared” are observed. With this feature in the prior distribution, and with the results of a regression for a particular security, we develop an empirical Bayes estimate of the security's three parameters (alpha, beta and sigma squared) which makes use of more information than other estimates described in the literature.
Performance information systems minimally consist of a performance standard, performance measurement, incentives to match performance to the standard, and periodic reports on performance. In this study four performance information systems are imposed on laboratory groups solving simple routine problems. These included speed, minimum messages, minimum error, and voting. There was a control condition with no explicit, performance information system. In aggregate, the groups tried to meet the assigned standard of performance. The performance information systems also set into motion other group processes resulting in numerous sensible but unanticipated consequences. It was not possible to conclude that the explicit performance information systems improved overall performance. The choice of performance information system did affect the task processes, the choice of structure, and the involvement in task supporting processes. The variability of behavior within each group suggests caution in widespread application of performance information systems.
A mathematical model for a forest consisting of a single species of trees with a steady state distribution of age is suggested. The forest is self-sustained in the sense that trees put out seeds from which new trees will grow. Therefore, there will be trees of different year classes. The rules for tree cutting are obtained to maximize the physical yield from the forest. The rule of cutting is given by function u(τ) of the age τ of the tree which tells which fraction of all trees of age τ of the forest must be felled during unit time. Function u(τ) is obtained by using a slightly generalized optimal control theory which reduces the problem to a fairly simple nonlinear programming problem. The cost of harvesting may be included in the objective functional. All biological characteristics of a forest are contained in two functions of the age of a tree. These functions would be obtained through a process of identification. The model is intended to be a part of a large forest-economy system, therefore mathematical simplicity has been a goal.
In response to an incoming fire alarm, someone must decide how many and which engine and ladder companies (firefighters and their apparatus) to dispatch to the scene. Traditional dispatching policies assume that all of the designated companies are available at the time the alarm is received. These policies do not consider the workload imposed on firefighters, and do not work well at the high alarm rates now characteristic of parts of large cities. Our procedure, designed for use in New York City's computed-aided Management Information and Control System, makes good initial dispatch decisions at all alarm rates. It uses response times to serious fires to measure performance and recognizes that the dispatcher has incomplete information about the seriousness of the incident when the decision is made. A simulation comparison of our procedure with the traditional policy was made using actual incidents from July 1972. Our procedure reduced the average second engine and second ladder response times to serious fires by 25 to 45 seconds, while keeping total workload essentially unchanged. This reduction, which is about 10–15% of the five and a half minutes obtained for the traditional policy, results primarily from our procedure's deciding how many to send based on historical information on the chance that an alarm from a given location at a given time of day is serious. For example, the fraction of fires in occupied structures getting an initial second engine rose from 65% with the traditional policy to 85% with our procedure, although both policies sent an initial second engine to the same fraction of all incidents. Our procedure also reduced the number of relocations of engine companies and ladder companies substantially. The approach we used should be valuable in the design of computer-aided dispatching systems in other cities. In particular, others may find it helpful to review the way in which the objective function is developed, the way particular aspects of the dispatch problem are treated, the provision of several parameters for tuning behavior, and features of the simulation testing.
Most of the recent studies of heuristic lot-sizing techniques for multi-stage material requirements planning systems have investigated the problem in the context of a single stage. In this paper, the multi-stage problem is first modeled analytically to indicate the potential errors inherent in the commonly proposed single-pass, stage-by-stage approaches (e.g., Wagner-Whitin). Then, based on this analysis, several simple cost modifications are suggested to improve the global optimality of these procedures. The effectiveness of these alternative modifications is tested through a series of simulation experiments. It is concluded that some of these modifications consistently improve the performance of the stage-by-stage approaches.
This article presents a model for the allocation of an advertising budget to geographic market segments, or territories, when the sales response to advertising in each segment is characterized by a probability distribution. It is shown that allocation decisions that are based on the expected sales response may be associated with a relatively large degree of risk and, therefore, non-optimal to a risk-averse manager. The model derives an “efficient frontier” in terms of the expected profit and its variance resulting from alternative budget allocations. The manager then chooses the optimal allocation based on his/her preference function.
We continue our survey of methods for constructing confidence intervals for steady-state means via simulation by studying sequential procedures which determine the length of the simulation during the course of the run. Our goal is to provide the simulation practitioner with some guidance as to which published procedures might actually perform well in practice. Empirical results for a variety of stochastic models with known steady-state means suggest that sequential procedures by Fishman and by Law and Carson provide good performance relative to the criterion probability of coverage.
This paper investigates the Borda-Kendall method for the determination of a consensus ranking. It is shown that in the case of ties the method does not perform as claimed. A “minimum variance” method for determining the consensus ranking is proposed and its properties examined. It is shown to be equivalent to the Borda-Kendall method if ties are not allowed. An algorithm to determine the “minimum variance” consensus ranking in the case of ties is described. Results obtained from the solution of problems of various sizes are discussed.
Public-sector planning problems are typically complex, and some important planning issues cannot be captured within a mathematical programming model of a problem; such issues may be qualitative in nature, unknown, or unrevealed by decisionmakers. Furthermore, there are often numerous solutions to a mathematical formulation that are nearly the same with respect to modeled issues but that are drastically different from each other in decision space. In such cases, some of these solutions may be significantly better than others with respect to unmodeled issues. Thus, a potentially important role of programming models is to generate a small number of alternative solutions that are feasible, perform well with respect to modeled issues, and are significantly different with respect to the decisions they specify. Such a set of alternatives may aid analysts and decision makers in understanding the problem and may serve as a catalyst for human creativity and invention. The Hop, Skip, and Jump (HSJ) method has been developed for this purpose. It is designed to produce alternative solutions that are very different from previously generated solutions. Each solution generated is good in the sense that it meets targets specified for modeled objectives. The technique is described in this paper, and is illustrated using a multiobjective linear programming model of a land use planning problem provided by a regional planning commission. In this case, the method is shown to be capable of generating alternative solutions that perform well with respect to the modeled objectives and that are drastically different with respect to the land use pattern specified. Differences among solutions are discussed using visual inspection as well as simple quantitative measures. The technique can be used to extend the capabilities of existing mathematical programming packages.
Previous authors have shown that dynamic ratio scheduling rules do not always behave as intended. A recent proposal by Adam and Surkis (Adam, N. R., J. Surkis. 1980. Priority update intervals and anomalies in dynamic ratio type job shop scheduling rules. Management Sci. 26 (12, December) 1227–1237.) to correct such anomalies is shown to be in error. The reason why such anomalies occur is clarified and a rule which prevents such anomalies is presented.