Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
129 results ✕ Clear filters

Optimal Production Planning by a Gradient Technique I. First Variations

Management Science 1969 16(1), 109-117
A gradient technique baaed on the first variations is used to solve a production scheduling problem with known sales forecasting. The function to be minimized is the sum of the costs derived from holding inventories, stockouts, and the deviation of the production rate from the optimal rate for the plant. This technique has the advantage of being able to investigate problems with a large number of state variables and can also be extended to multiproduct, multifacility operations with complex interconnections.

Information Processing and Programmed Decision Systems

Management Science 1969 16(3), 149-164
The capacity to evaluate decisions and information within a unified analytical model of the firm is at best a complex task. Even if, for the sake of simplicity, we ignore the effects of human behavior within organizations, most research on information processing design and evaluation has sought simulation in lieu of an explicit mathematical model. The purpose of this discussion is to suggest some practical extensions of the decision theory model for the design of management information processing systems and to illustrate these ideas through the detailed analysis of an aggregate planning problem.

Professional Pluralism in an Industrial Organization

Management Science 1969 16(4), B-233-B-246
Large, technologically-based industrial organizations are composed of many-specialist functions whose interests are frequently seen to be in conflict with those of management. Conflict within such organizations occurs over mutually dependent claims to shares of limited resources necessary to further specialist aims and programs. To understand the management process—the allocation of these resources—that takes place in such organizations the following points are crucial: (1) The technology-based organization generally has many “managements” that pursue goals relevant to their specialties (e.g. engineering or manufacturing). (2) Conflict occurs among managements over specialist interests that have often been described as professional interests. (3) Where specialties have become bureaucratized, where projects have a complex division of labor over both individuals and time, specialist interests will be protected not by professionals or the “profession” but rather by someone with formal executive authority who is responsible for a work force of specialists. For not only is the work force one of both managers and specialists, but their tasks are group tasks. Survey and interview data from one large technologically-based company illustrate the existence of horizontally contending factions rather than the customarily envisioned management-specialist schism. Specialists become managers and executives in order to perform “professional” functions.

Catalog Advertising Allocation

Management Science 1969 15(10), B-521-B-529
The catalog advertising allocation problem is one of allocating space (pages) in a catalog to products. Different allocations of space will have different catalog preparation costs and will produce different total catalog sales. This paper presents a model to forecast the sales results of different space allocations, reports on the empirical validity of the forecasts, and then presents a model to maximize sales subject to a total catalog cost constraint.

Determination of Warranty Reserves

Management Science 1969 15(10), B-542-B-549
Cost of warranty claims for failure of a product is an identifiable business cost. Methods of calculation are presented for determining this cost item for a linear prorata rebate plan and for a lump sum rebate plan where the customer receives a fixed amount for any failures within the warranty period. It is shown that a calculable amount, usually modest for good products, can be allocated by the manufacturer to a warranty reserve fund to cover the expected risks of warranty claims. Additionally, it is shown that the insight gained by a manufacturer about the components contributing to warranty reserve funding can furnish him with new marketing strategies.

Production Smoothing with Stochastic Demand I: Finite Horizon Case

Management Science 1969 16(3), 195-207
Beckmann [1] and Mills [7] consider production smoothing problems in which demands are random variables. This paper generalizes and extends Beckmann's results which predicate backlogging of excess demand. Convex expected holding and penalty cost functions pertain to inventory and the cost of changing the production rate is proportional to the change. The model has a finite horizon and permits nonstationary costs and demand distributions. Beckmann shows that two curves in the plane determine an optimal policy (minimum expected discounted cost) each period. It is shown here that the curves have slopes between minus one and zero, are differentiable, and are bounded by two straight lines with a slope of minus one. The results are not changed by an upper bound on the quantity produced or by a lag between the time a product is manufactured and the time it is available to satisfy demand.

Numerical Operators for Statistical PERT Critical Path Analysis

Management Science 1969 16(2), B-136-B-143
This paper extends the algorithm developed by Hartley and Wortham [2] for the calculation of the c.d.f. of the critical time in a PERT network. Additional first order crossed networks and their operators are given. In addition, a technique for developing an integral operator for any PERT network is presented.

A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach

Management Science 1969 15(9), 506-527
Two dynamic economic lot size production systems are analyzed in this paper, the first being a single product model with backlogging and the second a multi-echelon model. In each model the objective is to find a production schedule that minimizes the total production and inventory costs. A key conceptual difficulty is that the mathematically perplexing problem of minimizing a concave function is being considered. It is shown that both models are naturally represented via single source networks. The network formulations reveal the underlying structure of the models, and facilitate development of efficient dynamic programming algorithms for calculating the optimal production schedules.

An Unequal-Period Model for Cash Management Decisions

Management Science 1969 16(2), B-77-B-92
A lack of synchronization between cash inflows and outflows presents the problem of investing positive net flows and financing negative net flows. In addition to the basic investment-financing issue there are other interrelated problems such as the payment schedule and the minimal cash balance that directly affect cash management decisions. Previous attempts to solve these problems have imposed constraints that limit their application. The purpose of this study is to develop an applicable method for solving the cash management problem by deriving a linear programming model that is divided into unequal periods. The unequal time division maintains the day-to-day aspect of the problem while reducing the number of periods and variables to a manageable size. Decision variables are divided into four groups: the payment schedule, securities transactions, short-term financing, and the cash balance. The model determines the optimal values of these variables subject to institutional constraints and within a framework of managerial risk preferences that are expressed as subjective constraints and subsequently evaluated by the dual model. Although a certainty assumption is made, inputs are analysed by sensitivity analysis and the dual model, while the effects of uncertainty are further reduced by the unequal time structure of the model. Tests of the model indicate that it is both profitable and generally applicable by most business firms.

Investment Analysis Under Uncertainty

Management Science 1969 15(12), B-650-B-664
Investment projects are described in this paper as a pattern of uncertain cash flows over time; i.e., as a cash flow pattern over an event tree. Whereas the portfolio problem of selecting projects generally requires simultaneous consideration of all available projects, here we seek sufficient conditions for accepting and rejecting individual projects. These conditions are formulated as mathematical programming problems which are amenable to routine application at subordinate levels of an organization. “Investment is, in essence, present sacrifice for future benefit. But the present is relatively well known, whereas the future is always an enigma. Investment is also, therefore, certain sacrifice for uncertain benefit.” 1