Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
131 results ✕ Clear filters

A Dynamic Programming Approach to Stochastic Assembly Line Balancing

Management Science 1989 35(4), 459-471
Consider the problem of minimizing the required number of work stations on an assembly line for a given cycle time when the processing times are independent, normally distributed random variables. The assignment of tasks to stations is subject to precedence conditions, caused by technological constraints, and a lower bound on the probability of the work at any station being completed within the cycle time. We present two dynamic programming (DP) algorithms for this problem, each guaranteed to be optimal under a certain mild condition. Our general approach is based on the Held et al. (Held, M., R. M. Karp, R. Shareshian. 1963. Assembly-line-balancing-dynamic programming with precedence constraints. Oper. Res. 11 442–459.) formulation of the deterministic line balancing problem and thus represents a modification of previous work by Kao (Kao, E. P. C. 1976. A preference order dynamic program for stochastic assembly line balancing. Management Sci. 22 1097–1104.). Computational results indicate that both algorithms significantly outperform an alternative DP approach suggested by Henig (Henig, M. I. 1986. Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems. Comput. Oper. Res. 13 443–449.).

Operating Characteristics of the (S − 1, S) Inventory System with Partial Backorders and Constant Resupply Times

Management Science 1989 35(4), 472-477
In this paper we consider an (S − 1, S) inventory system with Poisson demand and constant resupply times. An arriving customer facing stockout will either backorder or withdraw its order. Expressions describing steady state operating characteristics of the system and the expected total cost rate are developed. Furthermore, the behavior of the expected total cost rate as the function of the relevant parameters is explored.

Defining Managerial Problems: A Framework for Prescriptive Theorizing

Management Science 1989 35(8), 963-981
Reflective problem solving activity presumes the existence of a problem definition or representation, often the precursor of a formal model. Although problem definition has been addressed by theorists from several disciplines, it has not been adequately conceptualized, limiting the potential value of descriptive and prescriptive research. This article places problem definition in the overall problem solving process and delineates the various ways in which problems are commonly defined. It identifies the central dilemma of problem definition and proposes a prescriptive framework responding to that dilemma.

A Dynamic Lot-Size Model with Make-or-Buy Decisions

Management Science 1989 35(4), 447-458
This paper considers a dynamic lot-size model with make-or-buy decisions. In each period, the production level may not exceed a given capacity, but the purchase is unrestricted. The costs for production, purchase and inventory are concave. The problem is to find a minimum-cost production and purchase schedule that satisfies known demands over T periods. After characterizing the form of an optimal solution, we present an O(T 5 ) algorithm when the production capacities are stationary. The algorithm is extended to the case where the capacities are integer multiples of a constant. The results are further extended to the cases of backlogging, bounded inventory, and capacitated purchase.

The M/M/1 Queue with Randomly Varying Arrival and Service Rates: A Phase Substitution Solution

Management Science 1989 35(5), 561-570
This paper presents an alternative procedure for computing the steady state probability vector of an M/M/1 queue with randomly varying arrival and service rates. By exploiting the structure of the infinitesimal generator of the underlying continuous-time Markov chain, the approach represents an efficient adaptation of the state reduction method introduced by Grassmann for solving problems involving M/M/1 queues under a random environment. We compare computational requirements of the proposed approach with the method of Neuts and block elimination under different rush-hour congestion patterns while keeping the overall traffic intensity constant as well as under different traffic intensities. We demonstrate that the proposed method requires minimal computing time to reach convergence and moreover the time requirement does not change much when traffic intensity increases.

Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems

Management Science 1989 35(2), 192-207
Mixed-model assembly lines are used to produce many different products without carrying large inventories. The effective utilization of these lines requires that a schedule for assembling the different products be determined. For Just-In-Time (JIT) production systems, which require producing only the necessary products in the necessary quantities at the necessary times, the objective is to keep a constant rate of usage of all parts used by the line. This is called levelling or balancing the schedule. This paper develops a theoretical basis for scheduling these systems, and presents new scheduling algorithms and heuristics.

Models for Managing Secrets

Management Science 1989 35(2), 240-248
Some elementary probability models are given that help articulate the trade-offs involved in managing secrets. One of these models captures the notion that the likelihood of disclosing a secret increases as the square of the number of people who are aware of it. Also, several classes of countermeasures are examined to determine their ability to increase the time window during which a secret can be held. One model suggests that disinformation countermeasures offer a promising technique for conserving secrets.

Batching to Minimize Flow Times on Parallel Heterogeneous Machines

Management Science 1989 35(5), 607-613
Traditional scheduling models have emphasized sequencing of tasks at machines. At multiple-machine work-centers mean flow times are affected by the allocation of work to machines, as well as the batch-sizes used for processing. An efficient algorithm for computing the optimal solution for the single product case is given. An approximate closed-form solution is available that could be used as a heuristic loading-rule in a dynamic environment. For the special case of equal setup times at machines, the optimal solution is given in closed form. Further, it is demonstrated that the optimal flow time for the work center depends only on the total processing rate at that center.

Generalized Assignment with Nonlinear Capacity Interaction

Management Science 1989 35(8), 923-941
The utility of the generalized assignment problem (GAP) is well known in regard to resource allocation problems arising in the areas of production planning, scheduling, and facility location. This paper introduces an important generalization of the GAP, which is called the 0-1 generalized assignment problem with nonlinear capacity constraints (NLGAP) and which allows for capacity interaction among tasks assigned to the same agent. For example, NLGAP can be used to model the hierarchical production planning problem involving the assignment of product families to production facilities in the case where process changeover gives rise to nonlinear capacity interaction among product families assigned to be produced at the same facility. Other applications of NLGAP occur readily throughout the areas of production planning and scheduling. We define a branch-and-bound algorithm for the NLGAP. This algorithm draws upon the underlying structure of the problem by combining in a novel manner recent advances in both nonlinear 0-1 programming and bounding techniques for the GAP. A heuristic for obtaining approximate solutions to NLGAP is also defined. We discuss computational experience with both the exact algorithm and the heuristic. The computational results demonstrate that the heuristic is extremely effective in obtaining near-optimal solutions and that the branch-and-bound algorithm can solve to optimality NLGAPs with 5 agents, 20 tasks, and over 1000 nonlinear terms per constraint.

Uncertainty and Leontief Systems: An Application to the Selection of Space Station System Designs

Management Science 1989 35(5), 585-596
This paper deals with the problem of designing a critical component of a highly interactive technologically advanced system, one in which there is uncertainty as to technological and cost parameters. The particular example discussed in the paper is the choice of an energy module for Space Station, where two alternatives, PV and SD, were under consideration. If the uncertainty associated with technological and cost parameters were ignored, and a choice made solely on the basis of “best guesses” of NASA engineers as to parameter values, then SD, which has been implemented only in small scale laboratory applications, would be a clearcut “design to cost” winner. The situation is different when the “best guess” estimates are replaced by subjective probability distributions over technological and cost parameters. The paper outlines a “safety first” decision making model which suggests that the more reliable PV, which has been used on all previous space missions, becomes the preferred choice for highly risk averse decision makers.