Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
135 results ✕ Clear filters

An Integrated Simulation and Dynamic Programming Approach for Determining Optimal Runway Exit Locations

Management Science 1992 38(7), 1049-1062
The Federal Aviation Administration and National Aeronautics and Space Administration are researching several problems targeted at improving airport capacity. Among the foremost of these problems is the issue of improving the operational use of runways. The efficiency of runway usage is dictated primarily by the runway occupancy time (ROT) which is the time that an aircraft spends on the runway or its vicinity, until a new arrival or departure can be processed on this runway. This paper considers the problem of determining the geometry and location of high speed exits on a runway to minimize the weighted ROT of a population of aircraft under various landing scenarios and frequencies of usage. Both the problem of designing a new runway and modifying an existing one are addressed. It is shown that the continuous location problem of siting runway turnoffs admits a natural finite set of candidate optimal locations. To characterize problem data and determine optimal exit locations, a simulation program integrated with a polynomial-time dynamic programming algorithm is developed. The methodology has been implemented on a personal computer, and an example is presented to illustrate the approach.

Simulation Designs for Quadratic Response Surface Models in the Presence of Model Misspecification

Management Science 1992 38(12), 1765-1791
This article considers the selection of experimental designs for the estimation of second-order response surface metamodels in a simulation environment. Rather than construct designs based on the premise that the postulated model exactly represents the simulated response, as is the case in optimal design theory, we assume that the estimation process may be biased by the presence of unfitted third-order terms. We therefore seek to specify experimental plans that address the bias due to possible model misspecification as well as traditional variance considerations. The performance measure used for this “fit-protect” scenario is Box and Draper's design criterion of average mean squared error of predicted response. Four important classes of response surface experimental plans are examined: (1) central composite designs, (2) Box-Behnken plans, (3) three-level factorial experiments, and (4) small central composite designs. Each design class is studied in conjunction with three pseudorandom number assignment strategies: (1) the use of a unique set of streams at each design point; (2) the assignment of a common stream set to all experimental points: and (3) the simultaneous use of common and antithetic streams through design blocking. Comparisons of both design classes and assignment strategies are presented to assist the user in the selection of an appropriate experimental strategy.

Multivariate Batch Means and Control Variates

Management Science 1992 38(10), 1415-1431
We consider applying the nonoverlapping batch means output analysis method in conjunction with the control-variate variance-reduction technique to estimate a steady-state multivariate mean vector. The effects of the number of batches and the number of control variates on the multivariate point and region estimators and the univariate point and interval estimators are considered. The results are experiment analysis guidelines in terms of an appropriate range of the number of batches to choose as a function of the number of responses and control variates. The results have implications for terminating simulations as well.

The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)

Management Science 1992 38(9), 1245-1263
We present a model for activity networks under generalized precedence relations (GPRs), discuss its temporal analysis and the issues that may arise relative to inconsistency among the specified relations and the activity durations. We also give more precise definition to the concept of criticality of an activity, and introduce the new concept of flexibility of an activity which is akin to the traditional concept of activity floats in regular CPM, with the latter taking on different meaning from its common interpretation in standard CPM. Issues of optimization are raised when one assumes, for each activity, a piecewise-linear time-cost function that permits positive and negative deviations from its least-cost duration between specified lower and upper bounds on that duration. We seek the optimal activity durations subject to the specified GPRs and a given due date λ. We also seek the construction of the complete project duration-cost function between the project minimum duration and its least-cost duration when the due date λ is interpreted, first, as a “deadline” and, second, as a “target date” with rewards for early, and penalties for late completion. The relations between the problems posed and the uncapacitated minimum cost flow problems are revealed and are utilized in the algorithmic solution of the problems.

Understanding the Efficiency of Multi-Server Service Systems

Management Science 1992 38(5), 708-723
In the design and operation of service systems, it is important to determine an appropriate level of server utilization (the proportion of time each server should be working). In a multi-server queue with unlimited waiting space, the appropriate server utilization typically increases as the number of servers (and the arrival rate) increases. We explain this economy of scale and give a rough quantitative characterization. We also show how increased variability in the arrival and service processes tends to reduce server utilization with a given grade of service. As part of this analysis, we develop simple approximations for the mean steady-state waiting time and the full steady-state waiting-time distribution. These approximations exploit an infinite-server approximation for the probability of delay and a single-server approximation for the conditional waiting-time distribution given that waiting occurs. The emphasis is on simple formulas that directly convey understanding.

Behavioral Consequences of Corporate Incentives and Long-Term Bonuses: An Experimental Study

Management Science 1992 38(9), 1280-1298
This paper examines whether long-term managerial bonus schemes change the allocative behavior of subjects in a laboratory setting. Using four different compensation schemes, we show that a necessary condition for reconciling divergent time preferences between principals and agents is a compensation scheme that induces behavior consistent with lower discount rates. Within subject results show that subjects recognize changes across compensation schemes and change their behavior as predicted by formal theory. Results also suggest that subjects become more myopic in their investment decisions if compensation contracts are incorrectly structured.

Signals and Choices in a Competitive Interaction: The Role of Moves and Messages

Management Science 1992 38(4), 483-500
This study examines the effect of signals from a competitor on the decisions of managers in a situation of strategic interdependence. The context is a multi-period pricing simulation and the payoffs are structured in accordance with a Prisoner's Dilemma. The signals consist of messages from the competitor and observations of the pricing decisions made by the competitor. The managers' responses to particular types of signals and particular combinations of moves and messages change over the course of the simulation. Suggestions for future research on competitive signaling are offered.

Dynamic Pricing and Ordering Decisions by a Monopolist

Management Science 1992 38(2), 240-262
This paper considers the relationship between pricing and ordering decisions for a monopolistic retailer facing a known demand function where, over the inventory cycle, the product may exhibit: (i) physical decay or deterioration of inventory called wastage; and (ii) decrease in market value called value drop associated with each unit of inventory on hand. The retailer is allowed to continuously vary the selling price of the product over the cycle. We introduce a notion of instantaneous margin, and use it to derive profit maximizing conditions for the retailer. The model explains the markdown of retail goods subject to decay. It also provides guidance in determining when price changes during the cycle are worthwhile due to product aging, how often such changes should be made, and how such changes affect ordering intervals and quantities.

Stochastic Network Programming for Financial Planning Problems

Management Science 1992 38(11), 1642-1664
Several financial planning problems are posed as dynamic generalized network models with stochastic parameters. Examples include: asset allocation for portfolio selection, international cash management, and programmed-trading arbitrage. Despite the large size of the resulting stochastic programs, the network structure can be exploited within the solution strategy giving rise to efficient implementations. Empirical results are presented indicating the benefits of the stochastic network approach for the asset allocation case.

The Capital Asset Pricing Model with Diverse Holding Periods

Management Science 1992 38(11), 1529-1542
Assuming that assets are traded in discrete time and that risk averse investors differ in their holding periods, we investigate the conditions under which the CAPM holds. It is shown that when portfolio rebalancing is allowed the CAPM holds in four cases not rigorously analyzed previously. These four cases are: (a) quadratic preferences; (b) one-period normal distributions when utility is defined on the multiperiod terminal wealth which is not normal; (c) the terminal wealth is log-normally distributed; and (d) the terminal wealth W T is normally distributed, but in this case diverse holding periods are not allowed. Case d is similar to the Sharpe-Lintner model with the exception that T − 1 revisions are allowed.