Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
129 results ✕ Clear filters

Sixty Years of Queueing Theory

Management Science 1969 15(6), B-280-B-294
Queueing Theory has been attacked on two fronts. Some theoreticians say that Queueing Theory is closed. Some practitioners feel that there is very little in it for use. In view of this, it seems that after six decades of development it is time for stock taking. It is hoped that a discussion of the problems, achievements and the shortcomings of Queueing Theory will be helpful for both theorists and practitioners by putting things in proper perspective. This paper reviews some of the major strides taken by Queueing Theory with respect to its three constituent problems: (i) Behavioral, (ii) Statistical, and (iii) Operational. If one looks at the general picture of the developments in these areas it is hard not to conclude that, in spite of the practitioners' accusations, the systems studied have become more and more realistic over the years. This review makes an attempt to bring this out. An extensive bibliography which is directive in nature rather than exhaustive should be helpful to an interested researcher or a practitioner in identifying the articles of his interest. A discussion of the future of Queueing Theory concludes the paper.

The Sequencing Problem

Management Science 1969 16(4), B-247-B-263
This paper surveys methods proposed in the literature for determining the optimal solution to “N Job, M Machines” scheduling problems when there are no due dates or priorities and the sole objective is to complete all operations in least time.

Multi-Product Scheduling in a Chemical Plant

Management Science 1969 15(6), B-267-B-279
Details are given of a chemical plant consisting of four machines, each capable of producing one of several products at a time. Five products are to be produced, each subject to a normal demand distribution with known parameters. The rates of production, costs, profit margins, setup times and machine capacities are given. The study compares two production scheduling methods, the first (Method I) is based on linear programming (two variants of this method are considered) and the second (Method II) on a multi-product batch scheduling approach. A simulation of the plant for a variety of demand conditions and for several safety-stock policies was carried out. The results suggest that Method I yields somewhat better plant performance for the case when average demand is below plant capacity, but neither method showed superiority under all conditions, and in many cases the difference between the results for the two methods was only marginal.

A Branch-and-Bound Algorithm for Multi-Level Fixed-Charge Problems

Management Science 1969 16(1), 67-76
Multi-level fixed-charge problems are mathematical optimization problems in which the separable portion of the objective function is the sum of piecewise continuous functions of a single variable. This paper describes a branch-and-bound algorithm that will find a global solution to this type of problem. The algorithm has the feature that a good feasible solution is generated at the start. Moreover, at each step of the algorithm an additional feasible solution may be generated for comparison with the best solution found previously.

A Functional Equation and its Application to Resource Allocation and Sequencing Problems

Management Science 1969 16(1), 77-84
A functional equation, similar to that formulated for the knapsack problem, is applied to the solution of a problem of resource allocation in critical path scheduling, and to a variety of single-machine sequencing problems with deadlines and loss functions. Among these are: minimization of the weighted number of tardy jobs, maximization of weighted earliness, minimization of tardiness with respect to common relative and absolute deadlines, and minimization of weighted tardiness with respect to a common deadline. Extensions to multiple-machine sequencing problems are discussed, and the sequencing of two machines in series is treated in detail.

An Algorithm for Separable Nonconvex Programming Problems

Management Science 1969 15(9), 550-569
In this paper we present an algorithm for solving mathematical programming problems of the form: Find x = (x 1 ,…, x n ) to minimize ∑φ i (x i ) subject to x ∈ G and l ≤ x ≤ L. Each φ i is assumed to be lower semicontinuous, possibly nonconvex, and G is assumed to be closed. The algorithm is of the branch and bound type and solves a sequence of problems in each of which the objective function is convex. These problems correspond to successive partitions of the feasible set. Two different rules for refining the partitions are considered; these lead to convergence of the algorithm under different requirements on the problem functions. Examples are given, and computational considerations are discussed.

A Stochastic Response Model with Application to Brand Choice

Management Science 1969 15(7), 323-337 open access
This paper develops a model which is an extension of a class of stochastic response models first proposed by Coleman [Coleman, J. A. 1964a. Models of Change and Response Uncertainty. Prentice-Hall, Inc., Englewood Cliffs, New Jersey.]. In its present form the model applies to the binary response situation. The model postulates a population of respondents who are heterogeneous with respect to their response probabilities. A given respondent may experience changes in his response probability in the intervals between response occasions, but since the actual responses he makes do not effect his response probability, the model is zero order. The paper also presents a variant of the minimum chi square procedure which may be used to estimate and test the model. An application to consumer brand choice data demonstrates that the model is empirically viable. Potential applications to multi-wave voting intentions panels and social-psychological experiments are indicated.

Operational Gaming Simulation with Application to a Stock Market

Management Science 1969 15(10), B-530-B-541
This paper presents a concept of operational gaming with important new features and describes its implementation. One of these new features is the incorporation in the model of computer generated play whose character is determined by the action of the players as well as computer programmed stochastic characteristics. The paper 1. Presents the concept of operational gaming simulation and its potential usefulness. 2. Describes what has been done to implement this concept in one area of application for economic research and instruction. 3. Pictures this application to a stock market in sufficient detail so that persons who might be interested in using this model for research and/or instructional purposes are aware of its nature and availability. The development of the model into a usable instrument is described and the procedures being used to give it realism and validity are discussed during the course of this presentation.

Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach

Management Science 1969 16(1), 93-108
A zero-one (0-1) linear programming formulation of multiproject and job-shop scheduling problems is presented that is more general and computationally tractable than other known formulations. It can accommodate a wide range of real-world situations including multiple resource constraints, due dates, job splitting, resource, substitutability, and concurrency and nonconcurrency of job performance requirements. Three possible objective functions are discussed; minimizing total throughput time for all projects: minimizing the time by which all projects are completed (i.e., minimizing makespan); and minimizing total lateness or lateness penalty for all projects.