Production Switching Heuristics for the Aggregate Planning Problem

Management Science 1978 24(12), 1242-1251
A number of approaches to the aggregate planning problem have been proposed in the literature, yet experience suggests that industrial concerns seldom use these models in actual planning situations. This paper describes a modified random walk production-inventory heuristic for the problem which should appeal to managers on the basis of simplicity as well as efficiency. The proposed approach is contrasted with linear programming, parametric programming, and linear decision rule optimal and near optimal solutions for several well known production situations. The simple production switching heuristic produces schedules which exceed optimal schedules by only 1 to 2 percent of total production costs in all cases.

The Use of Exponentially-Smoothed Transition Matrices to Improve Forecasting of Cash Flows from Accounts Receivable

Management Science 1978 24(7), 732-739
A pioneering application of a Markov chain to forecast account receivable flows (Cyert, Davidson, and Thompson [Cyert, R. M., H. J. Davidson, G. L. Thompson. 1962. Estimation of the allowance for doubtful accounts by Markov chains. Management Sci. (August) 287–303.]) employed an unusual (the oldest balance) method of aging accounts and an assumption that the resulting transition matrix was stable. Forecasting steady state results was the primary focus of the application. The present research uses a commonly found (partial balance) method of aging, an assumption of dynamic changes in the transition matrix, and does not focus on steady state results. A manufacturer's data were analyzed and exponential smoothing was introduced to update the average transition matrix thereby enabling a tracking of changing customer payment behavior. The actual and Markovian estimates of the company's cash collections checked favorably. The paper also discusses how modifications such as the seasonal and trend adjustments introduced by Winters (Winters, P. R. 1960. Forecasting sales by exponentially weighted moving averages. Management Sci. (April) 324–342.) may be incorporated into the model. Extensions to other areas are offered.

Socially and Individually Optimal Control of Arrivals to a GI/M/1 Queue

Management Science 1978 24(15), 1598-1610
We study the problem of controlling the arrivals to a single-server queue with general interarrival-time distribution and exponential service-time distribution (a GI/M/1 system). Control is exercised by accepting or rejecting arriving customers or by charging entering customers a toll or entrance fee. An entering customer receives a reward, representing his utility of service. The rewards vary randomly from customer to customer. There is a holding cost, which is a convex function of the number of customers in the system. We compare socially and individually optimal entering policies when the decision horizon is finite, specifically, when the system must close after n future arrivals. There may be a terminal reward or cost, incurred as a function of the number of customers present at the end of the horizon, representing, for example, the holding cost incurred until all of them are served. We show that a socially optimal policy is less likely to accept a customer than an individually optimal policy, and both policies are less likely to accept as the number of customers already present increases, the horizon length increases, or the discount rate decreases. It is shown that, contrary to intuition, the optimal congestion toll cannot be monotonic in the number of customers present. These properties carry over to the infinite horizon, both with and without discounting, except that in the latter case, in which the criterion is long-run average net benefit, the toll can be monotonic. Implications for the study of rush-hour or peak-load phenomena in various congestion systems are briefly discussed.

Priority Assignment of OSHA Safety Inspectors

Management Science 1978 24(15), 1642-1649
A priority assignment model for OSHA safety inspectors was developed and tested using 34,500 actual employee injuries from a total of 105,000 injuries in Missouri during 1973. The model combines expert opinions concerning selection of injury criteria and data from, reports of employee injuries. First the model computes a relative accident performance score for each employer. Employers are then grouped by general industrial classification and ranked according to their relative accident performance score. This “worst-first” ranking provides the rationale for assigning OSHA safety inspectors to employer locations. The model and research have been reviewed by Region VII OSHA personnel and implementation is currently under consideration within the Department of Labor. This model could replace current random assignment of inspectors in Missouri. Region VII, and the nation.

An HMMS Type Interactive Model for Aggregate Planning

Management Science 1978 24(5), 564-575
For purposes of aggregate production smoothing, quadratic functions often produce good fits to data on some of the relevant incremental costs, such as inventory and overtime costs. However, when costs of hiring and laying off workers are described by smooth quadratic functions, the model solutions tend to involve very frequent minor workforce adjustments. Production managers are often unwilling to actually implement such decisions because changing workforce levels involves a great many intangible costs, many of which seem to defy meaningful analytic representation. In this paper an interactive model is developed where, through parametric analysis of a set of workforce constraints, a manager can establish the appropriate trade-offs between his judgmental estimates of hiring and firing costs and other more tangible production costs.

Communication—Caveats Concerning Efficiency/Effectiveness Measures of Mass Transit Performance

Management Science 1978 24(16), 1777-1778 open access
In a recent article in Management Science, Savas [Savas, E. S. 1978. On equity in providing public services. Management Sci. 24 (8, April) 800–808.] discusses performance measures in the provision of public services, states that it is difficult, but not impossible, to develop measures for efficiency and effectiveness, and discusses some of the measures that have been used in various industries. It should be noted, however, that in some fields the widely used efficiency and effectiveness indicators do not measure what they are intended to, and should be subject to further critical examination.

Probability Revision Under Act-Conditional States

Management Science 1978 24(15), 1650-1657
This paper presents a simplified procedure to revise prior probabilities when these probabilities are conditional on acts. “Moral hazard” in insurance is one example where such conditions arise. Here coverage granted by the insurer may influence the probability of loss. The procedure developed in this paper permits evidence obtained from some experiment connected with one act to be employed in the revision of probabilities conditional not only on that act but on other acts as well. An example is presented and analyzed in which an insurance company must decide whether or not to grant full coverage to a medical group, based on evidence obtained from the claims history of that group under partial coverage.

The Economic Lot Scheduling Problem (ELSP): Review and Extensions

Management Science 1978 24(6), 587-598
The ELSP is a time-honored problem that “has been around” since 1915. It is the problem of accommodating cyclical production patterns when several products are made on a single facility. Recent contributions to its resolution resulted in either analytical approaches to a restricted problem, or heuristic approaches to the entire problem. This paper reviews critically the various contributions to the problem, and extends the analysis in the following four directions: An improved analytical approach A test for feasibility, A systematic means for escape from infeasibility, and A procedure for the determination of a basic period for a given set of multipliers to achieve a feasible schedule.

Note—On Optimal Resource Allocation in Community Hypertension Programs

Management Science 1978 24(16), 1749-1752
In Management Science (Vol. 24, No. 14, October, 1978), Nichols and Weinstein describe a model of a hypertension detection and treatment program, in which individuals proceed through a series of stages with transition probabilities that depend on expenditures at each stage. We generalize the model to include the case where the number of persons in the first stage is a decision variable. Surprisingly, this more general model is simpler to solve since it is shown that optimal transition probabilities and expenditures at any stage do not depend on probabilities and expenditures at later stages. The result is applied to simple cost functions fitted to data from the numerical example of Nichols and Weinstein. We also consider a more general form of the objective function, and present an algorithm for solving the resulting optimality conditions.