Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:

Management of Worksharing Systems

Manufacturing and Service Operations Management 2000
Worksharing occurs in serial manufacturing when machines are not uniquely assigned to workers. For example, two workers can operate three machines by alternating usage of the middle one. In some other worksharing systems operators move down the line carrying an item (or batch) with them, working on it at each machine until they are met by another worker who is coming back upstream. The work is then handed off even if the operation is underway. “Bucket Brigade” and “TSS” are worksharing systems based on this idea. This paper examines worksharing in a variety of situations, including unequal work content across machines, uncertain processing times, unequal workers, handoffs with and without preemption, and a range of machine-to-worker ratios. Some systems restrict workers to “zones” of machines. Work zones must overlap if sharing is to occur. The appropriate size of the overlapis shown to depend on the circumstances. Inventory-based rules to control access to shared machines are demonstrated to increase productivity when processing times vary. Worker sequence is found to be quite important; Slowest-to-Fastest is recommended for some situations, but is shown to perform poorly in others. Finally, the issue of whether or not to allow preemption is shown to have a large impact on productivity if inventory is not allowed, and to strongly affect the choice of designs when inventory is allowed. With and without preemption, proper combinations of worker sequence, zone size, and production control rules are shown to nearly eliminate idle time.

Assessing the Value of Information Sharing in a Promotional Retail Environment

Manufacturing and Service Operations Management 2000
We focus on a logistics system where inventory is held at three levels: the customers, the retail store, and the warehouse. Retail customer segments are heterogeneous and differ in their reservation prices for product as well as their holding costs. They purchase product from a retail store managed by a retailer. The retailer chooses a retail pricing scheme to maximize his expected profit given a model of customer temporal response to retail pricing. This retailer is supplied product from a warehouse managed by a manufacturer. The manufacturer is responsible for maintaining inventory level at the warehouse and providing 100% service level for retailer orders. The manufacturer uses all available information to generate an inventory policy that maximizes expected profit subject to the service-level requirement. We evaluate the manufacturer's optimal expected profit under two possible schemes: (1) no information regarding the timing of retail promotion plans, and (2) full information regarding the timing of retail promotion plans. We show: (1) as the predictability of the sales impact of a promotion decreases, it may be optimal for the retailer to eliminate retail promotions; (2) increased stockpiling tendency of customers increases retailer profits and decreases manufacturer profits; and (3) retail-promotion information sharing can make retail promotions change from being less profitable than no promotions to being more profitable than no promotions for the manufacturer. We show the impact of fitting the model to a grocery store data set that provided data regarding retail sales (and associated prices) of canned tomato soup over two years. We also explore managerial insights suggested by the model.

Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning

Manufacturing and Service Operations Management 2000
Designing product lines with substitutable components and subassemblies permits companies to offer a broader variety of products while continuing to exploit economies of scale in production and inventory costs. Past research on models incorporating component substitutions focuses on the benefits from reduced safety-stock requirements. This paper addresses a dynamic requirements-planning problem for two-stage multi product manufacturing systems with bill-of-materials flexibility, i.e., with options to use substitute components or subassemblies produced by an upstream stage to meet demand in each period at the downstream stage. We model the problem as an integer program, and describe a dynamic-programming solution method to find the production and substitution quantities that satisfy given multi period downstream demands at minimum total setup, production, conversion, and holding cost. This methodology can serve as a module in requirements-planning systems to plan opportunistic component substitutions based on relative future demands and production costs. Computational results using real data from an aluminum-tube manufacturer show that substitution can save, on average, 8.7% of manufacturing cost. We also apply the model to random problems with a simple product structure to develop insights regarding substitution behavior and impacts.

Congestion and Complexity Costs in a Plant with Fixed Resources that Strives to Make Schedule

Manufacturing and Service Operations Management 2000
In a firm that makes schedule, orders are always processed within a fixed time frame. In a congested facility, such a situation would be impossible using conventional queuing logic. We propose a conceptual model of a firm in which workers make schedule by rushing jobs, if necessary, with potential quality consequences. Hence, time and quality are substitutes, a feature that we recognize explicitly in our definition of the firm's capacity. Production yields are not exogenous parameters but endogenously determined by workers responding to schedule pressures. The plant manager can authorize overtime to relieve this pressure or live with the quality consequences of rushing. The model reveals the close relationships among the firm's workforce policies, the integrity of the inspection system, and the cost performance of the firmas its volume and/or product line expands. We consider pure congestion (driven by volume) and pure complexity (driven by product line breadth) effects in the context of our plant performance model. We consider two root causes of complexity costs: time and quality. The time effects of complexity will only have cost consequences in congested facilities, but quality effects are always present. Also in contrast to time effects, quality effects of complexity can be present in nonbottleneck workstations. Hence, the quality consequences of complexity can be as, or more important than the time consequences.

Sales-Force Incentives and Inventory Management

Manufacturing and Service Operations Management 2000
This article studies the problem of sales-force compensation by considering the impact of sales-force behavior on a firm's production and inventory system. The sales force's compensation package affects how the salespeople are going to exert their effort, which in turn determines the sales pattern for the firm's product and ultimately drives the performance of the firm's production and inventory system. In general, a smooth demand process facilitates production/inventory planning. Therefore, it is beneficial for a firm to induce its salespeople to exert effort in a way that actually smoothes the demand process. The article proposes a compensation package to induce such behavior. It evaluates and compensates the sales force on a moving-time-window basis, where the length of the time window is determined by the production lead time. Numerical examples show that the proposed package is beneficial to the firm relative to a widely used compensation plan based on annual quotas.

Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty

Manufacturing and Service Operations Management 2000
We consider a problem faced by a contract assembler that both assembles finished goods and procures the associated component parts for one of its major customers. Because of rapid changes in technology and ongoing engineering changes, all parts subject to obsolescence are purchased only for the current customer order. The procurement lead times of the components are random. Moreover, although the order for the finished product has a defined due date, the contract allows the customer to change the order quantity. Consequently, the assembler also faces a random demand. The assembler must determine how much to order and when to order each component part. The objective is to minimize the total expected cost, including the cost of holding components prior to their assembly, penalties for tardiness visa-vis the assembly due date, and overage and underage costs in satisfying the demand quantity. We present some structural results and discuss insights regarding optimal policies. We also present several simple heuristic policies and compare them to optimal policies. Computational results indicate that ignoring lead time variability can be costly, but relatively simple heuristics that consider lead time variability perform quite well.

Performance-Based Incentives in a Dynamic Principal-Agent Model

Manufacturing and Service Operations Management 2000
The principal-agent paradigm, in which a principal has a primary stake in the performance of some system but delegates operational control of that system to an agent, has many natural applications in operations management (OM). However, existing principal-agent models are of limited use to OM researchers because they cannot represent the rich dynamic structure required of OM models. This paper formulates a novel dynamic model that overcomes these limitations by combining the principal-agent framework with the physical structure of a Markov decision process. In this model one has a system moving from state to state as time passes, with transition probabilities depending on actions chosen by an agent, and a principal who pays the agent based on state transitions observed. The principal seeks an optimal payment scheme, striving to induce the actions that will maximize her expected discounted profits over a finite planning horizon. Although dynamic principal-agent models similar to the one proposed here are considered intractable, a set of assumptions are introduced that enable a systematic analysis. These assumptions involve the “economic structure” of the model but not its “physical structure.” Under these assumptions, the paper establishes that one can use a dynamic-programming recursion to derive an optimal payment scheme. This scheme is memoryless and satisfies a generalization of Bellman's principle of optimality. Important managerial insights are highlighted in the context of a two-state example called “the maintenance problem”.

A Risk-free Perishable Item Returns Policy

Manufacturing and Service Operations Management 2000
A returns policy, which specifies a schedule of rebates from manufacturer to retailer for product left over at the end of the selling season, encourages larger order quantities and can increase manufacturer profit. One downside from a manufacturer's perspective is the possibility of very low profit due to high rebate expense when demand is lower than expected. We take the viewpoint of a manufacturer selling a short life-cycle product to a single risk-neutral retailer and describe returns policies that, when compared to no returns, satisfy two conditions: (1) the retailer's expected profit is increased and (2) the manufacturer's profit is at least as large as when no returns are allowed. We call such a returns policy risk-free.

The Efficiency-Quality Trade-Off of Cross-Trained Workers

Manufacturing and Service Operations Management 2000
Does cross-training workers allow a firm to achieve economies of scale when there is variability in the content of work, or does it create a workforce that performs many tasks with consistent mediocrity? To address this question we integrate a model of a stochastic service system with models for tenure- and experience-based service quality. When examined in isolation, the service system model confirms a well-known “rule of thumb” from the queueing literature: Flexible or cross-trained servers provide more throughput with fewer workers than specialized servers. However, in the integrated model these economies of scale are tempered by a loss in quality. Given multiple tasks, flexible workers may not gain sufficient experience to provide high-quality service to any one customer, and what is gained in efficiency is lost in quality. Through a series of numerical experiments we find that low utilization in an all-specialist system can also reduce quality, and therefore the optimal staff mix combines flexible and specialized workers. We also investigate when the performance of the system is sensitive to the staffing configuration choice. For small systems with high learning rates, the optimal staff mix provides significant benefits over either extreme case (a completely specialized or completely flexible workforce). If the system is small and the rate of learning is slow, flexible servers are preferred. For large systems with high learning rates, the model leans toward specialized servers. In a final set of experiments, the model analyzes the design options for an actual call center.

Option Methods for Incorporating Risk into Linear Capacity Planning Models

Manufacturing and Service Operations Management 2000
Manufacturing and service operations decisions depend critically on capacity and resource limits. These limits directly affect the risk inherent in those decisions. While risk consideration is well developed in finance through efficient market theory and the capital asset pricing model, operations management models do not generally adopt these principles. One reason for this apparent inconsistency may be that analysis of an operational model does not reveal the level of risk until the model is solved. Using results from option pricing theory, we show that this inconsistency can be avoided in a wide range of planning models. By assuming the availability of market hedges, we show that risk can be incorporated into planning models by adjusting capacity and resource levels. The result resolves some possible inconsistencies between finance and operations and provides a financial basis for many planning problems. We illustrate the proposed approach using a capacity-planning example.