Knowledge that Transforms

To make high-quality research more accessible and easier to explore.

Fields:
121 results ✕ Clear filters

Capacity Expansions with Bundled Supplies of Attributes: An Application to Server Procurement in Cloud Computing

Manufacturing and Service Operations Management 2020
Problem definition: The recent surge in demand for cloud services has posed a significant capacity-expansion problem for cloud infrastructure providers. Although the growth of demand for capacity attributes—for example, CPU and RAM—is disproportionate, these attributes are often provided in preconfigured packages (cluster-types), and the fixed ratio of attributes in a package does not match with the time-varying ratio of demand. We analyze a class of expansion policies to determine the timing and magnitude of expansions, using preconfigured cluster-types, and we examine the optimal configurations of the cluster-types. Academic/practical relevance: Cloud computing is a major technological advance that is influencing businesses significantly, giving rise to an emerging industry but also posing the above-noted capacity-expansion problem. To our knowledge, this is a new issue that has not been studied in the literature. Methodology: We consider growing demand for two attributes and analyze a class of policies that consist of capacity expansion cycles (CECs), whereby capacities are added through sequential or simultaneous replenishments of two configured cluster-types. Results: We first derive the optimal timing and magnitude of expansions for every CEC, and then we devise two algorithms, the dynamic-programming-based (DP) algorithm and the forward-looking (FL) heuristic, to determine the optimal cycle lengths. We also propose a cluster-selection heuristic for choosing the optimal configurations of the cluster-types. Managerial implications: The FL-heuristic is effective, easy to communicate, and can be used as an excellent starting point for the search of the DP-algorithm. Moreover, because there is a desire in practice to reduce the variety of cluster-types, we find conditions under which the employment of only two cluster-types is as efficient as the employment of many cluster-types. Finally, we provide useful guidelines for the optimal configurations of these two cluster-types.

Inducing Compliance with Postmarket Studies for Drugs Under FDA’s Accelerated Approval Pathway

Manufacturing and Service Operations Management 2020
Problem definition: In 1992, the Food and Drug Administration (FDA) instituted the accelerated approval pathway (AP) to allow promising drugs to enter the market based on limited evidence of efficacy, thereby permitting manufacturers to verify true clinical benefits through postmarket studies. However, most postmarket studies have not been completed as promised. We address this noncompliance problem. Academic/practical relevance: The prevalence of this noncompliance problem poses considerable public health risk, thus compromising the original purpose of a well-intentioned AP initiative. We provide an internally consistent and implementable solution to the problem through a comprehensive analysis of the myriad complicating factors and trade-offs facing the FDA. Methodology: We adopt a Stackelberg framework in which the regulator, which cannot observe the manufacturer’s private cost information or level of effort, leads by imposing a postmarket study deadline. The profit-maximizing manufacturer then follows by establishing its level of effort to invest in its postmarket study. In establishing its deadline, the regulator optimizes the trade-off between providing public access to potentially effective drugs and mitigating public health risks from ineffective drugs. Results: We develop a deadline-dependent user fee menu as a screening mechanism that establishes an incentive for manufacturer compliance. We show that its effectiveness in inducing compliance depends fundamentally on the enforceability of sanction, a drug-specific measure that indicates how difficult it is to withdraw an unproven drug from the market, and the drug’s success probability: The higher either is, the higher is the probability that the mechanism induces compliance. Managerial implications: We synthesize and distill the salient trade-offs and nuances facing the FDA’s noncompliance problem and provide an implementable solution. We quantify the value of the solution as a function of a drug’s success probability and enforceability. From a public policy perspective, we provide guidance for the FDA to increase the viability and effectiveness of AP.

NetEase Cloud Music Data

Manufacturing and Service Operations Management 2020 open access
This paper describes the impression/display data and corresponding user, creator, and music content card data from NetEase Cloud Music. This data set is collectively supplied by the Revenue Management and Pricing (RMP) section of INFORMS and NetEase Cloud Music to support data-driven research in operations management. The data contain more than 57 million impressions/displays of music content cards recommended to a random sample of [Formula: see text] users from November 1, 2019 to November 30, 2019. For each impression, the data provide the corresponding user activities, such as clicks, likes, and follows. Moreover, the data set also contains information on each user, each content creator, and each content in the impression sample.

Incentives and Gaming in Collaborative Projects Under Risk-Sharing Partnerships

Manufacturing and Service Operations Management 2020
Problem definition: This article explores the incentive issues and gaming behaviors of firms under risk-sharing partnerships in a project management setting motivated by real-life examples. Academic/practical relevance: Collaboration prevails in projects within diverse industries. The risk-sharing partnership, in which each partner pays for its own cost and shares the outcome (either reward or loss) on project completion, is one of the most popular ways to manage collaborations in practice. However, the risk-sharing partnership may lead to project failure in the forms of excessive delays and cost overruns, but the driving forces (for example, incentives) and mechanisms (for example, gaming behaviors) in project management settings are not yet fully understood. Methodology: Relative to the one-firm-does-all strategy, we studied how risk-sharing partnerships may affect firms’ incentives in project execution and thus, project metrics (duration and cost) for various project networks (serial versus parallel), risk levels (deterministic versus stochastic duration), and information status (symmetry versus asymmetry). Results: We found that risk-sharing partnerships may encourage deliberate delays and cost overruns through various mechanisms, such as the Prisoner’s Dilemma, the Supplier’s Dilemma, and the Coauthor’s Dilemma. Counterintuitively, information asymmetry may outperform information symmetry on project metrics for both deterministic and stochastic duration, contingent on the network structure, cost parameters, and partners’ beliefs. Managerial implications: By connecting theory to practice, we provide insights into the incentive issues of some real-life projects and justifications for several mitigation strategies to avoid such gaming behaviors in practice.

Coordinating Project Outsourcing Through Bilateral Contract Negotiations

Manufacturing and Service Operations Management 2020
Problem definition: Project outsourcing has been a pronounced trend in many industries but is also recognized as a major cause for project delays. We study how companies can coordinate outsourced projects with uncertain completion times through bilateral contract negotiations. Academic/practical relevance: Misaligned subcontractor incentives may result in substantial losses to both project clients and subcontractors. Coordinating subcontractors’ efforts through proper contracts is imperative to the success of project outsourcing. Most previous studies on project contracting have not addressed subcontractors’ bargaining powers or the dynamic bargaining process in negotiations. We fill in this gap by studying bilateral bargaining between the client and subcontractors, which better reflects real-world negotiations. Methodology: We model project contract negotiations as a multiunit bilateral bargaining game. We derive the conditions such that bilateral negotiations can achieve system coordination and characterize the equilibrium negotiation outcomes. We then compare the conditions and equilibria under various model settings to study their impact on project contracting. Results: Our study uncovers how the coordination of project outsourcing is impacted by the contract form, bargaining power structure, precedence network topology, payment timing, external opportunities, and negotiation protocols. For single-task projects, the widely used fixed-price (cost-plus) contract can achieve system coordination only when the subcontractor (client) possesses full bargaining power. Cost-sharing and time-based incentive contracts, which perform well for single-task projects, may not be effective for projects with parallel tasks when any subcontractor’s bargaining power is sufficiently high. Projects with serial tasks can be coordinated only under certain extreme bargaining power structures. Delaying payments always exacerbates the incentive misalignment. Managerial implications: Our analysis provides insights and guidelines to companies regarding how to select proper contract forms and payment timing schemes, based on the characteristics of the projects and subcontractors, to ensure the effectiveness of project outsourcing. Our results also highlight the importance of bargaining modeling in project contracting.

Item Aggregation and Column Generation for Online-Retail Inventory Placement

Manufacturing and Service Operations Management 2020 open access
Problem definition : This paper studies an online retailer’s problem of choosing fulfillment centers in which to place items. We formulate the problem as a mixed-integer program that models thousands or millions of items to be placed in dozens of fulfillment centers and shipped to dozens of customer regions. The objective is to minimize the sum of shipping and fixed costs over one planning period. Academic/practical relevance : A good placement plan can significantly reduce the operational cost, which is crucial for online-retail businesses because they often have a low profit margin. The placement problem can be difficult to solve with existing techniques or off-the-shelf software because of the large number of items and the fulfillment center fixed costs and capacity constraints. Methodology : We propose a large-scale optimization framework that aggregates items into clusters, solves the cluster-level problem with column generation, and disaggregates the solution into item-level placement plans. We develop an a priori bound on the optimality gap, and we also apply the framework to a numerical example that consists of 1,000,000 items. Results : The a priori bound provides insights on how to select the appropriate aggregation criteria. For the numerical example, our framework produces a near-optimal solution in a few hours, significantly outperforming a sequential placement heuristic that approximates the status quo. Managerial implications : Our study provides a computationally efficient approach for solving online-retail inventory placement as well as similar large-scale optimization problems in practice.

Intertemporal Segmentation via Flexible-Duration Group Buying

Manufacturing and Service Operations Management 2020
Problem definition : We study a special form of group buying: the group buying succeeds only if the number of sign-ups reaches a preset threshold, with no duration constraint. Customers with heterogeneous valuations arrive sequentially and decide between signing up for the group buying or purchasing a regular product. To decide whether to join the group buying, customers need to estimate their expected waiting time, which varies depending on the cumulative sign-ups by the time of their arrival. The firm decides on the prices for the group-buying product and regular product, with the product quality levels and group-buying size exogenously determined. Academic/practical relevance : This type of group buying is often adopted for a special edition of the product and offered alongside a constantly available regular product. Methodology : We study the product line design with the group-buying sign-up behavior of customers characterized by the rational expectations equilibrium in a random pledging process. Results : We show that group buying with flexible duration can result in intertemporal customer segmentation, as different segments might be admitted at different times in the dynamic sign-up process. Such intertemporal segmentation is a natural discrimination scheme and has nontrivial implications. First, the efficiency loss due to waiting for enough sign-ups may decrease when a larger batch size is required for economic production. Second, as valuation heterogeneity in the market increases, the firm may not always benefit from offering group buying along with the regular product. Third, group buying can achieve a win-win-win situation for both high-end and low-end customers as well as the firm. Managerial implications : In addition to demonstrating the profitability of flexible-duration group buying, we show that the firm can strengthen its profitability by contingently setting prices or concealing sign-up information in group buying. We also confirm the robustness of our main insights by considering customers’ heterogeneous patience levels and horizontally differentiated products, among other factors.

Managing Capital Market Frictions via Cost-Reduction Investments

Manufacturing and Service Operations Management 2020
Problem definition: We examine how the presence of capital market frictions influences the decision to invest in production cost reduction and the resultant production volume. This investment can increase the firm’s cash flow by increasing the profit margin, but it can also decrease the firm’s risk-free cash reserves and thus affect its exposure to capital market frictions. Academic/practical relevance: Process improvement aimed at production cost reduction has generated myriad of theoretical questions about efficient investment options and capacity choices. From a managerial perspective, process improvement is a fundamental concern in operations strategy. Nevertheless, its analysis typically excludes financial constraints by assuming a perfect capital market. Methodology: We formulate a two-stage profit maximization model in which a capital-constrained firm commits to a cost-reduction investment in the first stage in anticipation of its production decision in the second stage of this two-stage decision process. The firm considers capital market frictions when making decisions at each stage, while considering uncertainty in demand for its offering and in reducing its unit production cost. Results: When a firm faces small initial capital and low preinvestment unit production costs, it can benefit from investing in production cost reduction in the presence of capital market frictions more so than in their absence. Moreover, uncertainty in the production cost reduction mitigates the impact of market frictions on the net benefit (i.e., additional profit), whereas demand uncertainty decreases the feasible parameter space, where investing in production cost reduction is optimal. Managerial implications: A firm’s decision to invest in production cost reduction affects its operational and financial capabilities. Managers should thus consider this investment as an operational hedge not only against the uncertainty of matching supply and demand but also against exposure to capital market frictions and the resultant financial risk.

Expediting in Two-Echelon Spare Parts Inventory Systems

Manufacturing and Service Operations Management 2020 open access
Problem definition: We consider dual sourcing in a distribution network for spare parts consisting of one central warehouse and multiple local warehouses. Each warehouse keeps multiple types of repairable parts to maintain several types of capital goods. The repair shop at the central warehouse has two repair options for each repairable part: a regular repair option and an expedited repair option. Irrespective of the repair option, each repairable part uses a certain resource for its repair. In the design of these inventory systems, companies need to decide on stocking levels and expedite thresholds such that total stock investments are minimized while satisfying asset availability and expediting constraints. Academic/practical relevance: Although most companies have the possibility to expedite the repair of parts in short supply, no contributions have been made that incorporate such dynamic expediting policies in repairable investment decisions. Anticipating expediting decisions that will be made later leads to substantial reductions in repairable investments. Methodology: We use queueing theory to determine the performance of the central warehouse and subsequently find the performance of all local warehouses using binomial disaggregation. For the optimization problem, we develop a greedy heuristic and a decomposition and column generation based algorithm. Results: Both solution approaches perform very well with average optimality gaps of 2.38 and 0.27%, respectively, across a large test bed of industrial size. The possibility to expedite the repair of failed parts is effective in reducing stock investments with average reductions of 7.94% and even reductions up to 19.61% relative to the state of the art. Managerial implications: Based on a case study at Netherlands Railways, we show how managers can significantly reduce the investment in repairable spare parts when dynamic repair policies are leveraged to prioritize repair of parts whose inventory is critically low.

Setting Retail Staffing Levels: A Methodology Validated with Implementation

Manufacturing and Service Operations Management 2020
Problem definition: How should retail staffing levels be set? While cost of labor is well understood, the revenue implications of having the right staffing level are hard to estimate. Moreover, these implications vary by store; hence, staffing levels should vary as well. Academic/practical relevance: We provide a novel method for setting store associate staffing at the individual store level. We discuss a field implementation that tested this methodology. Methodology: We use historical data on revenue and planned and actual staffing levels by store to estimate how revenue varies with the staffing level at each store. We disentangle the endogeneity between revenue and staffing levels by focusing on randomly occurring deviations between planned and actual labor. Using historical analysis as a guide, we validate these results by changing the staffing levels in a few test stores. We implement the results chain-wide and measure the impact in a large specialty retailer. Results: We find that the implementation validates predictions of the historical analysis. The implementation in 168 stores over six months produces a 4.5% revenue increase and a nearly $7.4 million annual profit increase. The impact of staffing level on revenue varies greatly by store. Managerial implications: Our paper makes three contributions to academic literature and to retail practice. First, we describe a process by which retailers can improve the most common industry practice: set store labor to be proportional to forecasted store revenue. Our proposed approach systematically sets the labor level in each store. Second, we demonstrate the effectiveness of that process via a field test and then via chain-wide implementation over a six-month time period. Finally, most retailers set store labor at the same level across stores, proportionate to revenue. We show that this is not the best approach because the revenue impact of store labor varies by store. The stores in our study that could benefit from relatively more labor were those with high potential demand, closely located competition for that demand, and experienced store managers. Overall, we provide the first simple but rigorous, field-tested approach that any retailer can use to increase revenue and profitability through better labor management.